Building construction wages: Broomfield, Colorado
Wage determination CO20260018 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/CO20260018 on · latest revision 1 · verify at sam.gov/wage-determination/CO20260018/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING ONLY) | $35.09 | $13.84 | $48.93 |
| MILLWRIGHT | $42.10 | $19.02 | $61.12 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $46.80 | $19.53 | $66.33 |
| ELEVATOR MECHANIC | $56.57 | $38.44 | $95.01 |
| POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS) | $37.34 | $15.20 | $52.54 |
| POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS) | $36.09 | $15.20 | $51.29 |
| POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER) | $35.78 | $15.20 | $50.98 |
| POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER) | $39.80 | $15.20 | $55.00 |
| IRONWORKER: ORNAMENTAL | $39.21 | $12.50 | $51.71 |
| IRONWORKER, STRUCTURAL | $39.21 | $12.50 | $51.71 |
| PAINTER: BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $27.41 | $11.56 | $38.97 |
| DRYWALL FINISHER/TAPER | $28.11 | $11.56 | $39.67 |
| SOFT FLOOR LAYER (VINYL AND CARPET) | $18.25 | $14.33 | $32.58 |
| GLAZIER | $37.26 | $13.15 | $50.41 |
| PLUMBER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | $47.23 | $21.68 | $68.91 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $45.55 | $22.11 | $67.66 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.60 | $27.57 | $76.17 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 |
| WATERPROOFER | $16.94 | $0.00 | $16.94 |
| TRUCK DRIVER: DUMP TRUCK | $17.34 | $0.00 | $17.34 |
| ROOFER | $16.96 | $0.00 | $16.96 |
| OPERATOR: GRADER/BLADE | $21.50 | $0.00 | $21.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.10 | $3.89 | $22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.78 | $5.78 | $26.56 |
| LABORER: PIPELAYER | $16.96 | $3.68 | $20.64 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $16.00 | $0.00 | $16.00 |
| LABORER: MASON TENDER - BRICK | $15.99 | $0.00 | $15.99 |
| LABORER: COMMON OR GENERAL | $14.86 | $4.98 | $19.84 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $23.12 | $7.97 | $31.09 |
| HVAC MECHANIC: HVAC UNIT INSTALLATION, EXCLUDES PIPE AND DUCT INSTALLATION | $25.66 | $7.72 | $33.38 |
| CEMENT MASON/CONCRETE FINISHER | $20.33 | $6.76 | $27.09 |
| CARPENTER (METAL STUD INSTALLATION ONLY) | $17.68 | $0.00 | $17.68 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $21.78 | $6.17 | $27.95 |
| BRICKLAYER | $21.96 | $0.00 | $21.96 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.