Building construction wages: Douglas, Colorado
Wage determination CO20260021 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/CO20260021 on · latest revision 1 · verify at sam.gov/wage-determination/CO20260021/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INLUDES ACOUSTICAL CEILING INSTALLATION; EXCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING AND METAL STUD INSTALLATION) | $35.09 | $13.84 | $48.93 |
| MILLWRIGHT | $42.10 | $19.02 | $61.12 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $46.80 | $19.53 | $66.33 |
| ELEVATOR MECHANIC | $56.57 | $38.44 | $95.01 |
| POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS) | $37.34 | $15.20 | $52.54 |
| POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS) | $36.09 | $15.20 | $51.29 |
| POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER) | $35.78 | $15.20 | $50.98 |
| POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER) | $39.80 | $15.20 | $55.00 |
| IRONWORKER: ORNAMENTAL | $39.21 | $12.50 | $51.71 |
| IRONWORKER, STRUCTURAL | $39.21 | $12.50 | $51.71 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $27.41 | $11.56 | $38.97 |
| SOFT FLOOR LAYER (VINYL AND CARPET) | $18.25 | $14.33 | $32.58 |
| GLAZIER | $37.26 | $13.15 | $50.41 |
| PLUMBER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | $47.23 | $21.68 | $68.91 |
| PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION; EXCLUDES HVAC DUCT INSTALLATION) | $45.40 | $22.11 | $67.51 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.60 | $27.57 | $76.17 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 |
| WATERPROOFER | $16.94 | $0.00 | $16.94 |
| TRUCK DRIVER: DUMP TRUCK | $17.34 | $0.00 | $17.34 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $24.96 | $8.60 | $33.56 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $25.20 | $7.55 | $32.75 |
| ROOFER | $16.96 | $0.00 | $16.96 |
| OPERATOR: GRADER/BLADE | $21.50 | $0.00 | $21.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.10 | $3.89 | $22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.78 | $5.78 | $26.56 |
| LABORER: PIPELAYER | $16.96 | $3.68 | $20.64 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $16.00 | $0.00 | $16.00 |
| LABORER: MASON TENDER - BRICK | $15.99 | $0.00 | $15.99 |
| LABORER: COMMON OR GENERAL | $16.04 | $4.95 | $20.99 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $23.12 | $7.97 | $31.09 |
| CEMENT MASON/CONCRETE FINISHER | $20.33 | $6.76 | $27.09 |
| CARPENTER (METAL STUD INSTALLATION ONLY) | $17.68 | $0.00 | $17.68 |
| CARPENTER (INCLUDES DRYWALL FINISHING/TAPING AND DRYWALL HANGING) | $17.00 | $0.00 | $17.00 |
| BRICKLAYER | $21.96 | $0.00 | $21.96 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.