Building construction wages: El Paso, Colorado
Wage determination CO20260022 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/CO20260022 on · latest revision 1 · verify at sam.gov/wage-determination/CO20260022/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $36.98 | $16.82 | $53.80 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $40.70 | $18.47 | $59.17 |
| ELEVATOR MECHANIC | $56.57 | $38.44 | $95.01 |
| POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS) | $37.34 | $15.20 | $52.54 |
| POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS) | $36.09 | $15.20 | $51.29 |
| POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER) | $35.78 | $15.20 | $50.98 |
| POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER) | $39.80 | $15.20 | $55.00 |
| IRONWORKER: ORNAMENTAL | $39.21 | $12.50 | $51.71 |
| IRONWORKER, STRUCTURAL | $39.21 | $12.50 | $51.71 |
| PAINTER (SPRAY) | $27.41 | $11.56 | $38.97 |
| CEMENT MASON/CONCRETE FINISHER | $34.73 | $15.15 | $49.88 |
| PLUMBER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | $47.60 | $18.10 | $65.70 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $47.60 | $18.10 | $65.70 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.60 | $27.57 | $76.17 |
| SHEET METAL WORKER INCLUDES HVAC DUCT INSTALLATION (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 | $65.70 |
| TRUCK DRIVER: DUMP TRUCK | $17.34 | $0.00 | $17.34 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $24.00 | $2.18 | $26.18 |
| ROOFER | $16.71 | $0.00 | $16.71 |
| PAINTER (BRUSH AND ROLLER) | $17.20 | $0.00 | $17.20 |
| OPERATOR: GRADER/BLADE | $21.50 | $0.00 | $21.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.58 | $2.42 | $21.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.26 | $8.62 | $28.88 |
| LABORER: PIPELAYER | $16.96 | $3.68 | $20.64 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $16.00 | $0.00 | $16.00 |
| LABORER: MASON TENDER - BRICK | $15.99 | $0.00 | $15.99 |
| LABORER: COMMON OR GENERAL | $13.40 | $1.40 | $14.80 |
| CARPENTER | $22.63 | $6.98 | $29.61 |
| BRICKLAYER | $21.96 | $0.00 | $21.96 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.