Building construction wages: Mesa, Colorado
Wage determination CO20260025 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/CO20260025 on · latest revision 1 · verify at sam.gov/wage-determination/CO20260025/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS) | $37.34 | $15.20 | $52.54 |
| POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS) | $36.09 | $15.20 | $51.29 |
| POWER EQUIPMENT OPERATOR: CRANE (50 TONS AND UNDER) | $35.78 | $15.20 | $50.98 |
| POWER EQUIPMENT OPERATOR: CRANE (141 TONS AND OVER) | $39.80 | $15.20 | $55.00 |
| IRONWORKER: ORNAMENTAL | $39.21 | $12.50 | $51.71 |
| IRONWORKER, STRUCTURAL | $39.21 | $12.50 | $51.71 |
| PAINTER (SPRAY) | $27.41 | $11.56 | $38.97 |
| PLUMBER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | $47.23 | $21.68 | $68.91 |
| PIPEFITTER, EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION | $45.40 | $22.11 | $67.51 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND UNIT INSTALLATION; EXCLUDES HVAC PIPE INSTALLATION) | $43.05 | $22.65 | $65.70 |
| TRUCK DRIVER: DUMP TRUCK | $17.34 | $0.00 | $17.34 |
| ROOFER | $16.18 | $0.00 | $16.18 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $24.26 | $10.66 | $34.92 |
| PAINTER (BRUSH AND ROLLER) | $19.56 | $2.05 | $21.61 |
| OPERATOR: GRADER/BLADE | $21.50 | $0.00 | $21.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.58 | $2.42 | $21.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.78 | $5.78 | $26.56 |
| LABORER: PIPELAYER | $16.96 | $3.68 | $20.64 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $16.00 | $0.00 | $16.00 |
| LABORER: MASON TENDER - BRICK | $15.99 | $0.00 | $15.99 |
| LABORER: COMMON OR GENERAL | $13.25 | $0.00 | $13.25 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.49 | $3.85 | $24.34 |
| ELECTRICIAN | $25.63 | $9.51 | $35.14 |
| CEMENT MASON/CONCRETE FINISHER | $21.44 | $10.23 | $31.67 |
| CARPENTER | $20.53 | $0.00 | $20.53 |
| BRICKLAYER | $21.96 | $0.00 | $21.96 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.