Carpenter prevailing wages: Connecticut, county by county
65 current carpenter rates across 22 active Connecticut wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Fairfield | CARPENTER | $42.03 | $29.19 | $71.22 | CT20260007 Residential |
| Fairfield | CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 | CT20260020 Building |
| Fairfield | CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 | CT20260020 Building |
| Fairfield | CARPENTER, PILEDRIVER | $42.03 | $29.19 | $71.22 | CT20260013 Heavy |
| Fairfield | CARPENTER: DIVER | $50.49 | $29.19 | $79.68 | CT20260013 Heavy |
| Fairfield | CARPENTER: DIVER TENDER | $42.03 | $29.19 | $71.22 | CT20260013 Heavy |
| Hartford | CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 | CT20260021 Building |
| Hartford | CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 | CT20260021 Building |
| Hartford | CARPENTER, INCLUDING DRYWALL HANGING | $15.50 | $0.00 | $15.50 | CT20260008 Residential |
| Hartford | CARPENTER, PILEDRIVER (AVON, BLOOMFIELD, EAST BRANBY, EAST HARTFOD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $42.03 | $29.19 | $71.22 | CT20260014 Heavy |
| Hartford | CARPENTER: DIVER (AVON, BLOOMFIELD, EAST BRANBY, EAST HARTFOD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $50.49 | $29.19 | $79.68 | CT20260014 Heavy |
| Hartford | CARPENTER: DIVER (BERLIN, BRISTOL, BURLINGTON, CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON) | $50.49 | $29.19 | $79.68 | CT20260014 Heavy |
| Hartford | CARPENTER: DIVER TENDER (AVON, BLOOMFIELD, EAST BRANBY, EAST HARTFOD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $42.03 | $29.19 | $71.22 | CT20260014 Heavy |
| Hartford | CARPENTER: DIVER TENDER (BERLIN, BRISTOL, BURLINGTON, CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON) | $42.03 | $29.19 | $71.22 | CT20260014 Heavy |
| Hartford | CARPENTERS, PILEDRIVERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $42.03 | $29.19 | $71.22 | CT20260003 Highway |
| Hartford | CARPENTERS, PILEDRIVERS (BERLIN, BRISTOL, BURLINGTON, CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE AND SOUTHINGTON) | $42.03 | $29.19 | $71.22 | CT20260014 Heavy |
| Hartford | CARPENTERS, PILEDRIVERS (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) | $42.03 | $29.19 | $71.22 | CT20260003 Highway |
| Hartford | CARPENTERS: DIVER TENDERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $42.03 | $29.19 | $71.22 | CT20260003 Highway |
| Hartford | CARPENTERS: DIVER TENDERS (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) | $42.03 | $29.19 | $71.22 | CT20260003 Highway |
| Hartford | CARPENTERS: DIVERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS) | $50.49 | $29.19 | $79.68 | CT20260003 Highway |
| Hartford | CARPENTERS: DIVERS (BERLIN, BRISTOL, BURLINGTON,CANTON, MARLBOROUGH, NEW BRITAIN, NEWINGTON, PLAINVILLE, SOUTHINGTON) | $50.49 | $29.19 | $79.68 | CT20260003 Highway |
| Litchfield | CARPENTER (INCLUDES FORM WORK) | $42.03 | $29.19 | $71.22 | CT20260019 Building |
| Litchfield + 5 more | CARPENTERS: CARPENTERS, PILEDRIVERS | $42.03 | $29.19 | $71.22 | CT20260001 Highway |
| Litchfield + 5 more | CARPENTERS: CARPENTERS, PILEDRIVERS (TOLLAND COUNTY - BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON) | $42.03 | $29.19 | $71.22 | CT20260001 Highway |
| Litchfield + 5 more | CARPENTERS: DIVER TENDERS | $42.03 | $29.19 | $71.22 | CT20260001 Highway |
| Litchfield + 5 more | CARPENTERS: DIVER TENDERS (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON) | $42.03 | $29.19 | $71.22 | CT20260001 Highway |
| Litchfield + 5 more | CARPENTERS: DIVERS | $50.49 | $29.19 | $79.68 | CT20260001 Highway |
| Litchfield + 5 more | CARPENTERS: DIVERS (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON) | $50.49 | $29.19 | $79.68 | CT20260001 Highway |
| Litchfield + 5 more | CARPENTERS:: CARPENTERS, PILEDRIVERS (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN. MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COL | $42.03 | $29.19 | $71.22 | CT20260001 Highway |
| Litchfield + 5 more | CARPENTERS:: DIVER TENDERS (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN. MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COLUMBIA, COV | $42.03 | $29.19 | $71.22 | CT20260001 Highway |
| Litchfield + 5 more | CARPENTERS:: DIVERS (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN. MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COLUMBIA, COVENTRY | $50.49 | $29.19 | $79.68 | CT20260001 Highway |
| Middlesex | CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 | CT20260022 Building |
| Middlesex | CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 | CT20260022 Building |
| Middlesex | CARPENTER, INCLUDING DRYWALL HANGING | $17.24 | $1.60 | $18.84 | CT20260009 Residential |
| Middlesex, Tolland | CARPENTER: CARPENTER, PILEDRIVER (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON) | $42.03 | $29.19 | $71.22 | CT20260015 Heavy |
| Middlesex, Tolland | CARPENTER: CARPENTERS, PILEDRIVERS (MIDDLESEX COUNTY TOLLAND COUNTY ANDOVER, COLUMBIA, COVENTRY, HEBRON, MANSFIELD, UNION, WILLINGTON) | $42.03 | $29.19 | $71.22 | CT20260015 Heavy |
| Middlesex, Tolland | CARPENTER: DIVER (MIDDLESEX COUNTY TOLLAND COUNTY ANDOVER, COLUMBIA, COVENTRY, HEBRON, MANSFIELD, UNION, WILLINGTON) | $50.49 | $29.19 | $79.68 | CT20260015 Heavy |
| Middlesex, Tolland | CARPENTER: DIVER (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON) | $50.49 | $29.19 | $79.68 | CT20260015 Heavy |
| Middlesex, Tolland | CARPENTER: DIVER TENDER (MIDDLESEX COUNTY TOLLAND COUNTY ANDOVER, COLUMBIA, COVENTRY, HEBRON, MANSFIELD, UNION, WILLINGTON) | $42.03 | $29.19 | $71.22 | CT20260015 Heavy |
| Middlesex, Tolland | CARPENTER: DIVER TENDER (TOLLAND COUNTY BOLTON, ELLINGTON, SOMERS, TOLLAND, VERNON) | $42.03 | $29.19 | $71.22 | CT20260015 Heavy |
| New Haven | CARPENTER | $16.78 | $1.60 | $18.38 | CT20260010 Residential |
| New Haven | CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, SOFT FLOOR LAYER - VINYL AND RESILIENT) | $42.03 | $29.19 | $71.22 | CT20260023 Building |
| New Haven | CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 | CT20260023 Building |
| New Haven | CARPENTER, PILEDRIVER (ANSONIA, DERBY, MILFORD, ORANGE (WEST OF ORANGE CENTER ROAD AND SOUTH OF ROUTE 1 AND WEST OF THE OYSTER RIVER), OXFORD, SEYMOUR) | $42.03 | $29.19 | $71.22 | CT20260016 Heavy |
| New Haven | CARPENTER: DIVER (ANSONIA, DERBY, MILFORD, ORANGE (WEST OF ORANGE CENTER ROAD AND SOUTH OF ROUTE 1 AND WEST OF THE OYSTER RIVER), OXFORD, SEYMOUR) | $50.49 | $29.19 | $79.68 | CT20260016 Heavy |
| New Haven | CARPENTER: DIVER (BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN, MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE) | $50.49 | $29.19 | $79.68 | CT20260016 Heavy |
| New Haven | CARPENTER: DIVER TENDER (ANSONIA, DERBY, MILFORD, ORANGE (WEST OF ORANGE CENTER ROAD AND SOUTH OF ROUTE 1 AND WEST OF THE OYSTER RIVER), OXFORD, SEYMOUR) | $42.03 | $29.19 | $71.22 | CT20260016 Heavy |
| New Haven | CARPENTER: DIVER TENDER (BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN, MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE) | $42.03 | $29.19 | $71.22 | CT20260016 Heavy |
| New Haven | CARPENTERS, PILEDRIVERS (BEACON FALLS, BETHANY, BRANFORD, CHESHIRE, EAST HAVEN, GUILFORD, HAMDEN, MADISON, MERIDEN, MIDDLEBURY, NAUGATUCK, NEW HAVEN, NORTH BRANFORD, NORTH HAVEN, ORANGE (EAST OF ORANGE CENTER ROAD AND NORTH OF ROUTE 1, AND NORTH OF ROUTE 1 AND EAST OF THE OYSTER RIVER), PROSPECT, SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE) | $42.03 | $29.19 | $71.22 | CT20260016 Heavy |
| New London | CARPENTER (DIVER TENDERS) | $42.03 | $29.19 | $71.22 | CT20260017 Heavy |
| New London | CARPENTER (DIVERS) | $50.49 | $29.19 | $79.68 | CT20260017 Heavy |
| New London | CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 | CT20260024 Building |
| New London | CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 | CT20260024 Building |
| New London | CARPENTER, INCLUDING DRYWALL HANGING | $15.50 | $0.00 | $15.50 | CT20260011 Residential |
| New London | CARPENTERS, PILEDRIVERS | $42.03 | $29.19 | $71.22 | CT20260002 Highway |
| New London | CARPENTERS, PILEDRIVERS | $42.03 | $29.19 | $71.22 | CT20260017 Heavy |
| New London | CARPENTERS: DIVER TENDERS | $42.03 | $29.19 | $71.22 | CT20260002 Highway |
| New London | CARPENTERS: DIVERS | $50.49 | $29.19 | $79.68 | CT20260002 Highway |
| Tolland | CARPENTER (ACOUSTICAL CEILING INASTALLATION ONLY) | $42.03 | $29.19 | $71.22 | CT20260025 Building |
| Tolland | CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 | CT20260025 Building |
| Tolland | CARPENTER (INCLUDES FORM WORK ONLY) | $42.03 | $29.19 | $71.22 | CT20260025 Building |
| Tolland | CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 | CT20260025 Building |
| Tolland | CARPENTER, INCLUDING DRYWALL HANGING | $24.53 | $1.60 | $26.13 | CT20260012 Residential |
| Windham | CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 | CT20260026 Building |
| Windham | CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 | CT20260026 Building |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Connecticut trades.