Residential construction wages: Fairfield, Connecticut
Wage determination CT20260007 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/CT20260007 on · latest revision 1 · verify at sam.gov/wage-determination/CT20260007/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $42.03 | $29.19 | $71.22 |
| ELECTRICIAN (DARIEN, GREENWICH, NEW CANAAN, STAMFORD AND THE PORTION OF NORWALK LYING WEST OF FIVE MILE RIVER) | $45.00 | $36.63 | $81.63 |
| ELECTRICIAN (BETHEL, BRIDGEPORT, BROOKFIELD, DANBURY, EASTON, FAIRFIELD, MONROE, NEW FAIRFIELD, NEWTOWN, NORWALK, REDDING, RIDGEFIELD, SHELTON, SHERMAN, STRATFORD, TRUMBALL, WESTON, WESTPORT AND WILTON TOWNSHIPS) | $47.40 | $36.74 | $84.14 |
| POWER EQUIPMENT OPERATOR: LOADER (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 | $78.47 |
| POWER EQUIPMENT OPERATOR: LOADER (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| POWER EQUIPMENT OPERATOR: LOADER (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR: COMBINATION HOE AND LOADER A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.63 | $29.80 | $80.43 |
| POWER EQUIPMENT OPERATOR: BULLDOZER FINE GRADE A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (ROUGH GRADE DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR UNDER 2 CUBIC YARDS; RUBBER TIRE BACKHOE/EXCAVATOR A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $52.92 | $29.80 | $82.72 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR 2 CUBIC YARDS AND OVER A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| GLAZIER A. PAID HOLIDAYS: LABOR DAY AND CHRISTMAS DAY | $41.18 | $24.55 | $65.73 |
| PAINTER: BRUSH AND ROLLER | $38.07 | $25.70 | $63.77 |
| PLUMBER/PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION) | $50.58 | $35.85 | $86.43 |
| ROOFER: SLATE & TILE ROOF A. PAID HOLIDAYS: JULY 4TH, LABOR DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE IS EMPLOYED 15 DAYS PRIOR TO THE HOLIDAY | $44.50 | $24.80 | $69.30 |
| SPRINKLER FITTER: FIRE SPRINKLERS A. PAID HOLIDAYS: MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS BEEN IN THE EMPLOYMENT OF A CONTRACTOR 20 WORKING DAYS PRIOR TO ANY SUCH PAID HOLIDAY | $49.98 | $33.44 | $83.42 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $34.95 | $22.70 | $57.65 |
| ROOFER, EXCLUDES SLATE, AND TILE ROOFS | $23.39 | $7.87 | $31.26 |
| LABORERS: LANDSCAPE | $14.96 | $4.63 | $19.59 |
| LABORERS: COMMON OR GENERAL | $13.13 | $4.24 | $17.37 |
| CEMENT MASON/CONCRETE FINISHER | $17.89 | $0.00 | $17.89 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.