Building construction wages: New Haven, Connecticut
Wage determination CT20260023 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/CT20260023 on · latest revision 2 · verify at sam.gov/wage-determination/CT20260023/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-23 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $48.81 | $33.65 | $82.46 |
| BRICKLAYER | $45.56 | $36.94 | $82.50 |
| CEMENT MASON/CONCRETE FINISHER | $45.56 | $36.94 | $82.50 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, SOFT FLOOR LAYER - VINYL AND RESILIENT) | $42.03 | $29.19 | $71.22 |
| FLOOR LAYER: CARPET ONLY | $42.03 | $29.19 | $71.22 |
| FLOOR LAYER: HARDWOOD FLOORS ONLY | $42.03 | $29.19 | $71.22 |
| METAL BUILDING ERECTOR (METAL SIDING / WALL PANELS) | $42.03 | $29.19 | $71.22 |
| CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 |
| SOFT FLOOR LAYER | $42.03 | $29.19 | $71.22 |
| MILLWRIGHT | $45.14 | $30.24 | $75.38 |
| ELECTRICIAN | $46.48 | $38.05 | $84.53 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $46.48 | $38.05 | $84.53 |
| ELECTRICIAN: COMMUNICATION TECHNICIAN | $46.48 | $38.05 | $84.53 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $46.48 | $38.05 | $84.53 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION) | $47.40 | $36.74 | $84.14 |
| ELEVATOR MECHANIC | $66.72 | $38.44 | $105.16 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATOR, BULLDOZER: ROUGH GRADE DOZER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE (SLOPES, SHAPING, LASER OR GPS, ETC.) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATOR: CRANE UNDER 100 TON RATED CAPACITY) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATOR: LOADER - 7 CUBIC YARDS OR OVER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL | $45.25 | $43.62 | $88.87 |
| LABORER: MASON TENDER- CEMENT/CONCRETE | $35.70 | $28.85 | $64.55 |
| GLAZIER | $43.13 | $26.75 | $69.88 |
| PAINTER: BRUSH AND ROLLER | $39.57 | $26.75 | $66.32 |
| DRYWALL FINISHER/TAPER | $40.32 | $26.75 | $67.07 |
| PLUMBER | $50.58 | $35.85 | $86.43 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $50.58 | $35.85 | $86.43 |
| ROOFER: SLATE AND TILE | $45.65 | $23.53 | $69.18 |
| ROOFER: COMPOSITION | $45.15 | $23.53 | $68.68 |
| SHEET METAL WORKER (INCLUDING HVAC UNIT INSTALLATION) | $44.70 | $44.50 | $89.20 |
| SHEET METAL WORKER (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY) | $44.70 | $44.50 | $89.20 |
| SHEET METAL WORKER (METAL ROOFS INSTALLATION) | $44.70 | $44.50 | $89.20 |
| LABORER: COMMON OR GENERAL | $27.85 | $18.04 | $45.89 |
| TRUCK DRIVER: DUMP TRUCK | $36.39 | $32.68 | $69.07 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.