| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $48.81 | $33.65 | $82.46 |
| BRICKLAYER | $45.56 | $37.97 | $83.53 |
| CEMENT MASON/CONCRETE FINISHER | $45.56 | $37.97 | $83.53 |
| FLOOR LAYER: CARPET ONLY | $42.03 | $29.19 | $71.22 |
| FLOOR LAYER: HARDWOOD FLOORS ONLY | $42.03 | $29.19 | $71.22 |
| METAL BUILDING ERECTOR (METAL SIDING / WALL PANELS) | $42.03 | $29.19 | $71.22 |
| CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 | $71.22 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | $71.22 |
| SOFT FLOOR LAYER | $42.03 | $29.19 | $71.22 |
| FLOOR LAYER: VINYL FLOORING ONLY | $42.03 | $29.19 | $71.22 |
| MILLWRIGHT | $45.14 | $30.24 | $75.38 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS) | $45.00 | $36.63 | $81.63 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION) | $47.40 | $36.74 | $84.14 |
| ELEVATOR MECHANIC | $66.72 | $38.44 | $105.16 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATOR, BULLDOZER: ROUGH GRADE DOZER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | $80.02 |
| POWER EQUIPMENT OPERATOR, BULLDOZER: FINEGRADE (SLOPES, SHAPING, LASER OR GPS, ETC.) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | $81.72 |
| POWER EQUIPMENT OPERATOR: CRANE UNDER 100 TON RATED CAPACITY) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | $86.59 |
| POWER EQUIPMENT OPERATOR: LOADER - 7 CUBIC YARDS OR OVER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | $83.13 |
| IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL | $45.25 | $43.62 | $88.87 |
| LABORER:MASON TENDER-CEMENT/CONCRETE | $35.70 | $28.85 | $64.55 |
| GLAZIER | $43.13 | $26.75 | $69.88 |
| PAINTER: BRUSH AND ROLLER | $39.57 | $26.75 | $66.32 |
| DRYWALL FINISHER/TAPER | $40.32 | $26.75 | $67.07 |
| PLUMBER | $50.58 | $35.85 | $86.43 |
| PIPEFITTER | $50.58 | $35.85 | $86.43 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $50.58 | $35.85 | $86.43 |
| ROOFER: SLATE AND TILE | $45.65 | $23.53 | $69.18 |
| ROOFER: COMPOSITION | $45.15 | $23.53 | $68.68 |
| SHEET METAL WORKER (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY) | $50.60 | $45.61 | $96.21 |
| SHEET METAL WORKER (INCLUDING HVAC UNIT INSTALLATION) | $44.70 | $44.50 | $89.20 |
| SHEET METAL WORKER (METAL ROOFS INSTALLATION) | $44.70 | $44.50 | $89.20 |
| TRUCK DRIVER: DUMP TRUCK | $36.39 | $32.68 | $69.07 |
| LABORER: COMMON OR GENERAL | $33.81 | $25.18 | $58.99 |