Painter prevailing wages: California, county by county

61 current painter rates across 28 active California wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.

County / areaClassificationRateFringeTotalDetermination
AmadorPAINTERS: BRUSH$14.39$4.60$18.99CA20260023 Building
AmadorPAINTERS: SANDBLASTER; SCAFFOLD; SHEETROCK; STRUCTURAL STEEL; SWING STAGE; TAPER$15.79$4.60$20.39CA20260023 Building
AmadorPAINTERS: SPRAY$14.64$4.60$19.24CA20260023 Building
ButtePAINTER: BRUSH ONLY$8.90$0.00$8.90CA20260008 Residential
Del Norte + 3 morePAINTERS (LAKE AND MENDOCINO COUNTIES)$53.38$28.04$81.42CA20260004 Heavy, Highway
Del Norte + 3 morePAINTERS: BRUSH (LAKE AND MENDOCINO COUNTIES)$20.78$4.68$25.46CA20260005 Building
Del Norte + 3 morePAINTERS: BRUSH & ROLLER (DEL NORTE AND HUMBOLDT COUNTIES)$13.35$2.94$16.29CA20260004 Heavy, Highway
Del Norte + 3 morePAINTERS: BRUSH; ROLLER (DEL NORTE AND HUMBOLDT COUNTIES)$12.51$2.43$14.94CA20260005 Building
Del Norte + 3 morePAINTERS: DRYWALL FINISHER; PAPERHANGER (LAKE AND MENDOCINO COUNTIES)$21.78$4.68$26.46CA20260005 Building
Del Norte + 3 morePAINTERS: PAPERHANGER; SANDBLASTER; SPRAY; STRUCTURAL STEEL; SWING STAGE; TAPER (DEL NORTE AND HUMBOLDT COUNTIES)$12.76$2.43$15.19CA20260005 Building
Del Norte + 3 morePAINTERS: SANDBLASTER, SPRAY, STRUCTURAL STEEL & SWING STAGE (DEL NORTE AND HUMBOLDT COUNTIES)$13.60$2.94$16.54CA20260004 Heavy, Highway
Del Norte + 3 morePAINTERS: SANDBLASTING; SPRAY; STEAM-CLEANING (LAKE AND MENDOCINO COUNTIES)$21.28$4.68$25.96CA20260005 Building
Del Norte, Lake, MendocinoPAINTER (BRUSH AND ROLLER)$26.37$9.81$36.18CA20260031 Residential
HumboldtPAINTER (BRUSH AND ROLLER)$26.37$9.81$36.18CA20260027 Residential
ImperialPAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK$38.52$18.64$57.16CA20260002 Building, Heavy, Highway
KingsPAINTER$8.19$0.00$8.19CA20260011 Residential
Lassen + 23 morePAINTERS (SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR.) (ALPINE, AMADOR, BUTTE, COLUSA. EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS), GLENN, LASSEN (WEST OF HIGHWAY 395, EXCLUDING HONEY LAKE), MODOC, NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS), PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS), PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS), SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES)$43.45$22.80$66.25CA20260007 Building, Heavy, Highway
Lassen + 23 morePAINTERS: BRUSH AND ROLLER (PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR. SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR. SPECIAL COATING SPRAY STEEL = $1.25/HR. SWING STAGE = $2.00/HR$39.43$16.16$55.59CA20260007 Building, Heavy, Highway
Lassen + 23 morePAINTERS: PAPERHANGER (PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR. SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR. SPECIAL COATING SPRAY STEEL = $1.25/HR. SWING STAGE = $2.00/HR$42.19$16.16$58.35CA20260007 Building, Heavy, Highway
Lassen + 23 morePAINTERS: SPRAY PAINTER (PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR. SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR. SPECIAL COATING SPRAY STEEL = $1.25/HR. SWING STAGE = $2.00/HR$41.43$16.16$57.59CA20260007 Building, Heavy, Highway
Lassen + 9 morePAINTER (BRUSH AND ROLLER)$26.37$9.81$36.18CA20260030 Residential
Los AngelesPAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK$38.52$18.64$57.16CA20260022 Building, Heavy, Highway
Los Angeles + 7 morePAINTER, INCLUDING LEAD ABATEMENT: (1) REPAINT (SAN LUIS OBISPO, SANTA BARBARA & VENTURA)$25.40$15.87$41.27CA20260017 Residential
Los Angeles + 7 morePAINTER, INCLUDING LEAD ABATEMENT: (1) REPAINT IMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE & SAN BERNARDINO$28.59$15.97$44.56CA20260017 Residential
Los Angeles + 7 morePAINTER, INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK (SAN LUIS OBISPO, SANTA BARBARA & VENTURA)$30.04$16.03$46.07CA20260017 Residential
Los Angeles + 7 morePAINTER, INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK IMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE & SAN BERNARDINO$32.12$16.09$48.21CA20260017 Residential
Los Angeles + 7 morePAINTER, INCLUDING LEAD ABATEMENT: (3) JOURNEYMAN & INDUSTRIAL IMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE & SAN BERNARDINO$34.02$16.49$50.51CA20260017 Residential
Los Angeles + 7 morePAINTER, INCLUDING LEAD ABATEMENT: (3) JOURNEYMAN & INDUSTRIAL SAN LUIS OBISPO, SANTA BARBARA & VENTURA$34.02$16.49$50.51CA20260017 Residential
Madera + 16 morePAINTER (SAN FRANCISCO COUNTY)$57.00$28.04$85.04CA20260018 Building, Heavy, Highway
Madera + 16 morePAINTER: BRUSH$43.45$22.80$66.25CA20260018 Building, Heavy, Highway
Madera + 16 morePAINTER: BRUSH, ROLLER$34.49$21.80$56.29CA20260018 Building, Heavy, Highway
Madera + 16 morePAINTER: DRYWALL FINISHER/TAPER$35.74$21.80$57.54CA20260018 Building, Heavy, Highway
Madera + 16 morePAINTERS. PREMIUMS: EXOTIC MATERIALS - $1.25 ADDITIONAL PER HOUR. SPRAY WORK: - $0.50 ADDITIONAL PER HOUR. INDUSTRIAL PAINTING - $0.25 ADDITIONAL PER HOUR [WORK ON INDUSTRIAL BUILDINGS USED FOR THE MANUFACTURE AND PROCESSING OF GOODS FOR SALE OR SERVICE; STEEL CONSTRUCTION (BRIDGES), STACKS, TOWERS, TANKS, AND SIMILAR STRUCTURES]. HIGH WORK: OVER 50 FEET - $2.00 PER HOUR ADDITIONAL 100 TO 180 FEET - $4.00 PER HOUR ADDITIONAL OVER 180 FEET - $6.00 PER HOUIR ADDITIONAL (ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA CLARA, AND SANTA CRUZ COUNTIES)$53.38$28.04$81.42CA20260018 Building, Heavy, Highway
Madera + 6 morePAINTER, INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK KERN COUNTY$34.08$18.50$52.58CA20260009 Residential
Madera + 6 morePAINTERS: BRUSH MERCED, STANISLAUS & SAN JOAQUIN COUNTIES$43.45$22.80$66.25CA20260009 Residential
Mono + 5 morePAINTER (BRUSH AND ROLLER)$26.37$9.81$36.18CA20260029 Residential
Mono, Kern, InyoPAINTERS: INCLUDING LEAD ABATEMENT: (1) JOURNEYMAN PAINTER$34.08$18.50$52.58CA20260020 Building, Heavy, Highway
Mono, Kern, InyoPAINTERS: INCLUDING LEAD ABATEMENT: (4) ALL OTHER WORK$34.08$18.50$52.58CA20260020 Building, Heavy, Highway
Mono, Kern, InyoPAINTERS: INCLUDING LEAD ABATEMENT: (5) INDUSTRIAL$41.42$19.04$60.46CA20260020 Building, Heavy, Highway
Monterey + 17 morePAINTER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO & SONOMA COUNTIES)$53.38$28.04$81.42CA20260019 Residential
Monterey + 17 morePAINTER (SAN FRANCISCO COUNTY)$57.00$28.04$85.04CA20260019 Residential
Monterey + 17 morePAINTER: BRUSH AND ROLLER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK = $1.00/HR SWING STAGE = $2.00/HR$39.43$16.16$55.59CA20260019 Residential
Monterey + 17 morePAINTER: PAPER HANGER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK = $1.00/HR SWING STAGE = $2.00/HR$42.19$16.16$58.35CA20260019 Residential
Monterey + 17 morePAINTER: SPRAY PAINTER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK = $1.00/HR SWING STAGE = $2.00/HR$41.43$16.16$57.59CA20260019 Residential
Monterey + 17 morePAINTERS: BRUSH (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR$43.45$22.80$66.25CA20260019 Residential
OrangePAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK$38.52$18.64$57.16CA20260024 Building, Heavy, Highway
RiversidePAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK$38.52$18.64$57.16CA20260025 Building, Heavy, Highway
San BernardinoPAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK$38.52$18.64$57.16CA20260026 Building, Heavy, Highway
San DiegoPAINTERS: INCLUDING LEAD ABATEMENT: (2) ALL OTHER WORK$38.52$18.64$57.16CA20260001 Building, Heavy, Highway, Residential
San Luis ObispoPAINTERS: (3) JOURNEYMAN PAINTER INCLUDING LEAD ABATEMENT$36.44$18.58$55.02CA20260012 Building, Heavy, Highway
San Luis ObispoPAINTERS: (4) INDUSTRIAL$41.42$19.04$60.46CA20260012 Building, Heavy, Highway
San Luis ObispoPAINTERS: (5) ALL OTHER WORK$36.44$18.58$55.02CA20260012 Building, Heavy, Highway
Santa BarbaraPAINTERS, INCLUDING LEAD ABATEMENT: (5) ALL OTHER WORK$36.44$18.58$55.02CA20260014 Building, Heavy, Highway
Santa BarbaraPAINTERS: INCLUDING LEAD ABATEMENT: (1) JOURNEYMAN PAINTER$36.44$18.58$55.02CA20260014 Building, Heavy, Highway
ShastaPAINTER$10.45$0.00$10.45CA20260013 Residential
TularePAINTER$9.87$0.00$9.87CA20260016 Building
TularePAINTER$36.57$22.69$59.26CA20260021 Heavy, Highway
TuolumnePAINTER (BRUSH AND ROLLER)$26.37$9.81$36.18CA20260028 Residential
VenturaPAINTERS: (3) JOURNEYMAN PAINTER INCLUDING LEAD ABATEMENT$36.44$18.58$55.02CA20260015 Building, Heavy, Highway
VenturaPAINTERS: (4) INDUSTRIAL$41.42$19.04$60.46CA20260015 Building, Heavy, Highway
VenturaPAINTERS: (5) ALL OTHER WORK$36.44$18.58$55.02CA20260015 Building, Heavy, Highway

Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All California trades.