Heavy, Highway construction wages: Tulare, California

Wage determination CA20260021 · Active · Standard · verify on SAM.gov

Tulare

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 22026-05-18diff vs rev 1
rev 12026-05-17diff vs rev 0
rev 02026-01-09original

Current rates (rev 2)

Download CSV
ClassificationRateFringeTotal
TERRAZZO WORKER/SETTER$60.58$29.79$90.37
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT)$35.31$12.75$48.06
ASBESTOS WORKERS/INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$64.56$25.07$89.63
BOILERMAKER$45.60$38.99$84.59
MARBLE FINISHER$42.06$19.80$61.86
TILE LAYER$50.28$22.05$72.33
TILE FINISHER$32.68$18.32$51.00
TERRAZZO FINISHER$44.93$20.98$65.91
BRICKLAYER; MARBLE SETTER$45.53$20.29$65.82
DIVER: MANIFOLD OPERATOR (STANDBY) DEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT$59.51$34.69$94.20
DIVER: MANIFOLD OPERATOR (MIXED GAS) DEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT$64.51$34.69$99.20
DIVER: DIVER WET DEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT$103.62$34.69$138.31
DIVER: DIVER TENDER DEPTH PAY (SURFACE DIVING): FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT$59.51$34.69$94.20
DIVER: DIVER STANDBY DEPTH PAY (SURFACE DIVING): FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT$60.51$34.69$95.20
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN DEPTH PAY (SURFACE DIVING): 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET: $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT$54.10$34.69$88.79
PILEDRIVER$54.10$34.69$88.79
CARPENTERS: MILLWRIGHT$47.92$32.41$80.33
CARPENTERS: JOURNEYMAN CARPENTER$45.42$30.82$76.24
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER$52.65$30.82$83.47
CARPENTERS (HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER)$45.57$30.82$76.39
ELECTRICIAN$50.00$30.15$80.15
LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY$40.76$21.76$62.52
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY$53.30$22.26$75.56
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY$70.16$24.71$94.87
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Truck crane oiler)$45.12$31.15$76.27
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Oiler)$42.89$31.15$74.04
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Lifting devices)$49.14$31.15$80.29
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Truck crane oiler)$45.41$31.15$76.56
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Oiler)$43.11$31.15$74.26
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Lifting devices)$50.82$31.15$81.97
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Truck crane oiler)$45.66$31.15$76.81
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Oiler)$43.38$31.15$74.53
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Lifting devices)$52.64$31.15$83.79
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 6: DECKHAND; FIRE TENDER$42.50$31.15$73.65
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 5: DECK ENGINEER$44.73$31.15$75.88
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 4: ASSISTANT OPERATOR IN LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIRPERSON/WELDER$47.47$31.15$78.62
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 5)$58.09$32.53$90.62
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 4)$59.23$32.53$91.76
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 3)$60.37$32.53$92.90
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 2)$61.70$32.53$94.23
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1-A)$65.43$32.53$97.96
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1)$62.96$32.53$95.49
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5)$58.19$32.53$90.72
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4)$59.33$32.53$91.86
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3)$60.47$32.53$93.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2)$61.80$32.53$94.33
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A)$65.53$32.53$98.06
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1)$63.06$32.53$95.59
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:CRANE: GROUP 5: BOOM CAT$62.24$32.53$94.77
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 (Hydraulic)$60.61$32.53$93.14
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 (Cranes)$65.56$32.53$98.09
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANES: GROUP 2: CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE$67.04$32.53$99.57
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANES: GROUP 1: CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF- PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS$68.81$32.53$101.34
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANE: GROUP 4: CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER GROUP 5: BOOM CAT$63.54$32.53$96.07
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:CRANES GROUP 2: CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL$66.08$32.53$98.61
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: CRANES GROUP 3: CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER;$64.34$32.53$96.87
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: CRANES GROUP 4: BOOM TRUCK OR DUAL PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) - UNDER 15 TONS;$61.30$32.53$93.83
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: CRANES GROUP 1: CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS$68.59$32.53$101.12
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 SERIES OR SMALLER, AND SIMILAR (WITHOUT ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P. (BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL$55.49$32.53$88.02
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8 BIT SHARPENER; BOILER TENDER; BOX OPERATOR; BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR (SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND; FIRE TENDER; FORKLIFT (UNDER 20 FT.); GENERATOR; GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC MONITOR; KEN SEAL MACHINE (OR SIMILAR); MIXERMOBILE; OILER; PUMP OPERATOR; REFRIGERATION PLANT; RESERVOIR-DEBRIS TUG (SELF- PROPELLED FLOATING); ROSS CARRIER (CONSTRUCTION SITE); ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE; SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR (INCLUDES VACUUM SWEEPER); SLUSHER OPERATOR; SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER; TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT; WELDING MACHINE (POWERED OTHER THAN BY ELECTRICITY) WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL$57.70$32.53$90.23
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7 BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR SIMILAR; COMBINATION SLURRY MIXER AND/OR CLEANER; DRILLING EQUIPMENT, 20 FT. AND UNDER M.R.C.; FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR; HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE (VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM); MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER WITH OR WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL; SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE CURING MAHCINE (ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER); SIGNALPERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR CONCRETE FORMS); TIE SPACER; TOWER MOBILE; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY UP TO AND INCLUDING 5 FT. DEPTH; TRUCK- TYPE LOADER$58.84$32.53$91.37
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6 ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER; BOOM- TYPE BACKFILLING MACHINE; ASSISTANT PLANT ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); DECK ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHES 200 SERIES OR SIMILAR UP TO AND INCLUDING 30 FT. M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR; HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR (WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR SIMILAR; OILER, TRUCK MOUNTED EQUIPMENT; PAVEMENT BREAKER, TRUCK-MOUNTED, WITH COMPRESSOR COMBINATION; PAVING FABRIC INSTALLATION AND/OR LAYING MACHINE; PIPE BENDING MACHINE (PIPELINES ONLY); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND SUPPORTED); SCREED (EXCEPT ASPHALTIC CONCRETE PAVING); SELF- PROPELLED PIPELINE WRAPPING MACHINE; TRACTOR; SELF-LOADING CHIPPER; CONCRETE BARRIER MOVING MACHINE$59.98$32.53$92.51
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5 CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE) (CLARY, JOHNSON, BIDWELL BRIDGE DECK OR SIMILAR TYPES); MECHANICAL BURM, CURB AND/OR CURB AND GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR (SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED (AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5 FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR$61.30$32.53$93.83
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4 ASPHALT PLANT ENGINEER/BOX PERSON; CHICAGO BOOM; COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING 3/4 CU. YD.; CONCRETE BATCH PLANT (WET OR DRY); DOZER AND/OR PUSH CAT; PULL- TYPE ELEVATING LOADER; GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT, HUGHES, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY REPAIRPERSON AND/OR WELDER; LIME SPREADER; LOADER UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER (MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR SPREADER MACHINE (ASPHALT, BARBER-GREENE AND SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS; POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT; RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE-WHEELS, ETC.); RUBBER- TIRED EARTHMOVING EQUIPMENT (SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL TRACTOR WITH DRAG; SOIL STABILIZER (P & H OR EQUAL); SPIDER PLOW AND SPIDER PULLER; TUBEX PILE RIG; UNLICENSED CONSTUCTION WORK BOAT OPERATOR, ON SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.; TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR PUGMILL EQUIPMENT)$62.57$32.53$95.10
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3 ASPHALT MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE BACK MACHINE ASSISTANT TO ENGINEER OR MECHANIC; CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK MACHINE, TONNAGE TO APPLY; CRANE MOUNTED DRILL ATTACHMENT, TONNAGE TO APPLY; DOZER, SLOPE BRD; GRADALL; HYDRAULIC EXCAVATOR, UP TO 3 1/2 CU. YDS.; LOADER 4 CU. YDS. AND OVER; LONG REACH EXCAVATOR; MULTIPLE ENGINE SCRAPER (WHEN USED AS PUSH PULL); POWER SHOVELS, UP TO AND INCLUDING 1 CU. YD.; PRE-STRESS WIRE WRAPPING MACHINE; SIDE BOOM CAT, 572 OR LARGER; TRACK LOADER 4 CU. YDS. AND OVER; WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR)$63.95$32.53$96.48
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2 HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3-1/2 CU. YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR (FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS. M.R.C.$65.43$32.53$97.96
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1 OPERATOR OF HELICOPTER (WHEN USED IN ERECTION WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; POWER SHOVELS, OVER 7 CU. YDS.$66.96$32.53$99.49
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Truck crane oiler)$45.12$31.15$76.27
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Oiler)$42.89$31.15$74.04
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 (Lifting devices)$49.14$31.15$80.29
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Truck crane oiler)$45.41$31.15$76.56
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Oiler)$43.11$31.15$74.26
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 (Lifting devices)$50.82$31.15$81.97
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Truck crane oiler)$45.66$31.15$76.81
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Oiler)$43.38$31.15$74.53
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 (Lifting devices)$52.64$31.15$83.79
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 6: DECKHAND; FIRE TENDER$42.50$31.15$73.65
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 5: DECK ENGINEER$44.73$31.15$75.88
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: LIFTING DEVICES: GROUP 4: ASSISTANT OPERATOR IN LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIRPERSON/WELDER$47.47$31.15$78.62
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 5)$58.09$32.53$90.62
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 4)$59.23$32.53$91.76
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 3)$60.37$32.53$92.90
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 2)$61.70$32.53$94.23
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1-A)$65.43$32.53$97.96
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND: (GROUP 1)$62.96$32.53$95.49
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 5)$58.19$32.53$90.72
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 4)$59.33$32.53$91.86
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 3)$60.47$32.53$93.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 2)$61.80$32.53$94.33
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1-A)$65.53$32.53$98.06
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES: (GROUP 1)$63.06$32.53$95.59
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:CRANE: GROUP 5: BOOM CAT$62.24$32.53$94.77
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 (Hydraulic)$60.61$32.53$93.14
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 (Cranes)$65.56$32.53$98.09
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANES: GROUP 2: CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE$67.04$32.53$99.57
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANES: GROUP 1: CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF- PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS$68.81$32.53$101.34
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: CRANE: GROUP 4: CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER GROUP 5: BOOM CAT$63.54$32.53$96.07
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:CRANES GROUP 2: CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL$66.08$32.53$98.61
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: CRANES GROUP 3: CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER;$64.34$32.53$96.87
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: CRANES GROUP 4: BOOM TRUCK OR DUAL PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) - UNDER 15 TONS;$61.30$32.53$93.83
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: CRANES GROUP 1: CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS$68.59$32.53$101.12
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 SERIES OR SMALLER, AND SIMILAR (WITHOUT ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P. (BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER OR WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL$55.49$32.53$88.02
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8 BIT SHARPENER; BOILER TENDER; BOX OPERATOR; BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR (SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND; FIRE TENDER; FORKLIFT (UNDER 20 FT.); GENERATOR; GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC MONITOR; KEN SEAL MACHINE (OR SIMILAR); MIXERMOBILE; OILER; PUMP OPERATOR; REFRIGERATION PLANT; RESERVOIR-DEBRIS TUG (SELF- PROPELLED FLOATING); ROSS CARRIER (CONSTRUCTION SITE); ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE; SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR (INCLUDES VACUUM SWEEPER); SLUSHER OPERATOR; SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER; TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT; WELDING MACHINE (POWERED OTHER THAN BY ELECTRICITY) WORK ON A YO-YO CAT: $.60 PER HOUR ADDITIONAL$57.70$32.53$90.23
LABORERS:, GUNITE: GROUP 1: STRUCTURAL NOZZLEMAN$36.46$27.30$63.76
LABORERS:, GUNITE: GROUP 3: REBOUNDMAN$35.37$27.30$62.67
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS$40.83$17.62$58.45
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7 BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR SIMILAR; COMBINATION SLURRY MIXER AND/OR CLEANER; DRILLING EQUIPMENT, 20 FT. AND UNDER M.R.C.; FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR; HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE (VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM); MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER WITH OR WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL; SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE CURING MAHCINE (ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER); SIGNALPERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR CONCRETE FORMS); TIE SPACER; TOWER MOBILE; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY UP TO AND INCLUDING 5 FT. DEPTH; TRUCK- TYPE LOADER$58.84$32.53$91.37
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6 ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER; BOOM- TYPE BACKFILLING MACHINE; ASSISTANT PLANT ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); DECK ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHES 200 SERIES OR SIMILAR UP TO AND INCLUDING 30 FT. M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR; HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR (WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR SIMILAR; OILER, TRUCK MOUNTED EQUIPMENT; PAVEMENT BREAKER, TRUCK-MOUNTED, WITH COMPRESSOR COMBINATION; PAVING FABRIC INSTALLATION AND/OR LAYING MACHINE; PIPE BENDING MACHINE (PIPELINES ONLY); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND SUPPORTED); SCREED (EXCEPT ASPHALTIC CONCRETE PAVING); SELF- PROPELLED PIPELINE WRAPPING MACHINE; TRACTOR; SELF-LOADING CHIPPER; CONCRETE BARRIER MOVING MACHINE$59.98$32.53$92.51
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5 CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE) (CLARY, JOHNSON, BIDWELL BRIDGE DECK OR SIMILAR TYPES); MECHANICAL BURM, CURB AND/OR CURB AND GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR (SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED (AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5 FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR$61.30$32.53$93.83
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4 ASPHALT PLANT ENGINEER/BOX PERSON; CHICAGO BOOM; COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING 3/4 CU. YD.; CONCRETE BATCH PLANT (WET OR DRY); DOZER AND/OR PUSH CAT; PULL- TYPE ELEVATING LOADER; GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT, HUGHES, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY REPAIRPERSON AND/OR WELDER; LIME SPREADER; LOADER UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER (MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR SPREADER MACHINE (ASPHALT, BARBER-GREENE AND SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR SIMILAR; PORTABLE CRUSHING AND SCREENING PLANTS; POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT; RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE-WHEELS, ETC.); RUBBER- TIRED EARTHMOVING EQUIPMENT (SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL TRACTOR WITH DRAG; SOIL STABILIZER (P & H OR EQUAL); SPIDER PLOW AND SPIDER PULLER; TUBEX PILE RIG; UNLICENSED CONSTUCTION WORK BOAT OPERATOR, ON SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.; TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR PUGMILL EQUIPMENT)$62.57$32.53$95.10
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3 ASPHALT MILLING MACHINE; CABLE BACKHOE; COMBINATION BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE BACK MACHINE ASSISTANT TO ENGINEER OR MECHANIC; CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK MACHINE, TONNAGE TO APPLY; CRANE MOUNTED DRILL ATTACHMENT, TONNAGE TO APPLY; DOZER, SLOPE BRD; GRADALL; HYDRAULIC EXCAVATOR, UP TO 3 1/2 CU. YDS.; LOADER 4 CU. YDS. AND OVER; LONG REACH EXCAVATOR; MULTIPLE ENGINE SCRAPER (WHEN USED AS PUSH PULL); POWER SHOVELS, UP TO AND INCLUDING 1 CU. YD.; PRE-STRESS WIRE WRAPPING MACHINE; SIDE BOOM CAT, 572 OR LARGER; TRACK LOADER 4 CU. YDS. AND OVER; WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR)$63.95$32.53$96.48
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2 HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3-1/2 CU. YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR (FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS. M.R.C.$65.43$32.53$97.96
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1 OPERATOR OF HELICOPTER (WHEN USED IN ERECTION WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; POWER SHOVELS, OVER 7 CU. YDS.$66.96$32.53$99.49
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 2: (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART$53.23$39.55$92.78
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER$34.71$17.62$52.33
CEMENT MASON/CONCRETE FINISHER$32.15$23.27$55.42
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 2: (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART$56.53$39.55$96.08
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 2: (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN : AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART$57.65$39.55$97.20
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 2: (1) LEVERMAN AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART$62.61$39.55$102.16
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 1: (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART$51.23$39.55$90.78
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4 ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION".$28.94$27.30$56.24
PLUMBER & STEAMFITTER$51.65$41.59$93.24
UNDERGROUND UTILITY WORKER / LANDSCAPE FITTER$36.01$18.50$54.51
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 1: (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: AREA 1: NORTHERNMOST PART AREA 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART$54.53$39.55$94.08
DREDGING (CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 1: (1) LEVERMAN AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: AL BUT THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART$60.61$39.55$100.16
DREDGING ( CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING) AREA 1: (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: 2: REMAINDER CALAVERAS COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART COLUSA COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART AREA 2: REMAINDER FRESNO COUNTY: AREA 1: REMAINDER AREA 2: EASTERN PART GLENN COUNTY: AREA 1: EASTERN PART AREA 2: REMAINDER LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART AREA 2: SOUTHWESTERN PART NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY AREA 2: REMAINDER PLACER COUNTY: AREA 1: PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER AREA 2: REMAINDER SIERRA COUNTY: AREA 1: WESTERN PART AREA 2: REMAINDER SISKIYOU COUNTY: AREA 1: CENTRAL PART AREA 2: REMAINDER SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER AREA 2: REMAINDER TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY AREA 2: REMAINDER TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART$55.65$39.55$95.20
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 2)$49.64$28.56$78.20
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 1)$47.64$28.56$76.20
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 2)$54.25$28.56$82.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 1)$52.25$28.56$80.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 2)$57.85$28.56$86.41
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 1)$55.85$28.56$84.41
IRONWORKER (ORNAMENTAL, REINFORCING AND STRUCTURAL)$50.70$35.15$85.85
IRONWORKER (FENCE ERECTOR)$45.78$26.51$72.29
LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS$34.06$27.30$61.36
LABORER: TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE$36.56$27.30$63.86
LABORER: TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON$36.26$27.30$63.56
LABORERS:, WRECKING: GROUP 2: Semi-skilled wrecker (salvaging of other building materials)$35.35$27.30$62.65
LABORERS:, WRECKING: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)$35.50$27.30$62.80
LABORERS:, GUNITE: GROUP 4: GUNITE LABORER BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL$35.25$27.30$62.55
LABORERS:, GUNITE: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN$35.96$27.30$63.26
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY)$35.25$27.30$62.55
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES$35.35$27.30$62.65
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR YPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR$35.50$27.30$62.80
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE$36.08$27.30$63.38
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION.$36.05$27.30$63.35
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING$35.55$27.30$62.85
LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER$35.72$27.30$63.02
LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; MASONRY AND PLASTERER TENDER; CAST-IN-PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL$36.20$27.30$63.50
GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (New Construction)$35.25$27.30$62.55
GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS (Establishment Warranty Period)$28.94$27.30$56.24
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (TULARE COUNTY)$46.41$27.72$74.13
TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (TULARE COUNTY)$44.42$27.72$72.14
TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (TULARE COUNTY)$44.96$27.72$72.68
TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (TULARE COUNTY)$45.41$27.72$73.13
TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (TULARE COUNTY)$45.66$27.72$73.38
TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (TULARE COUNTY)$45.89$27.72$73.61
PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL$39.77$28.54$68.31
PAINTER$36.57$22.69$59.26
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING$35.11$17.62$52.73
TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES$44.56$34.28$78.84
TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS. AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS (WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND TRUCK REPAIRMAN$44.21$34.28$78.49
TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.; WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY TRANSPORT TILLER PERSON; SELF- PROPELLED STREET SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK - HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON AND ROAD OILER; DRY DISTRIBUTION TRUCK (A BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW$43.86$34.28$78.14
TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND "A" FRAME DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED TRACTOR$43.56$34.28$77.84
TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES)$43.26$34.28$77.54