Residential construction wages: Monterey + 17 more counties, California
Wage determination CA20260019 · Active · Standard
MontereySan BenitoAlamedaContra CostaEl DoradoPlacerSacramentoSutterYoloYubaMarinSan FranciscoSan MateoSanta ClaraSanta CruzNapaSolanoSonoma
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 5 | 2026-05-18 | diff vs rev 4 |
| rev 4 | 2026-05-17 | diff vs rev 3 |
| rev 3 | 2026-01-30 | diff vs rev 2 |
| rev 2 | 2026-01-23 | diff vs rev 1 |
| rev 1 | 2026-01-16 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 5) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO) | $37.75 | $19.28 | $57.03 |
| CARPENTERS: MILLWRIGHT (SAN FRANCISCO COUNTY) | $60.49 | $35.11 | $95.60 |
| CARPENTERS: JOURNEYMAN CARPENTER (SAN FRANCISCO COUNTY) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN FRANCISCO COUNTY) | $60.54 | $33.52 | $94.06 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN FRANCISCO COUNTY) | $60.39 | $33.52 | $93.91 |
| DRYWALL STOCKER/SCRAPPER: (AREA 4) AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba Counties | $24.07 | $18.58 | $42.65 |
| DRYWALL STOCKER/SCRAPPER: (AREA 2) AREA 2: Monterey, San Benito & Santa Cruz Counties | $24.49 | $18.58 | $43.07 |
| DRYWALL STOCKER/SCRAPPER: (AREA 1) AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties | $27.43 | $18.58 | $46.01 |
| DRYWALL INSTALLERS/LATHERS: (AREA 4) AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & YubaCounties | $48.12 | $31.93 | $80.05 |
| DRYWALL INSTALLERS/LATHERS: (AREA 2) AREA 2: Monterey, San Benito & Santa Cruz Counties | $48.97 | $31.93 | $80.90 |
| DRYWALL INSTALLERS/LATHERS: (AREA 1) AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties | $54.85 | $31.93 | $86.78 |
| CARPENTER: MILLWRIGHT MARIN COUNTY | $52.75 | $32.41 | $85.16 |
| CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTY | $52.65 | $30.82 | $83.47 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 2: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, & YUBA COUNTIES) | $64.56 | $25.07 | $89.63 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES) | $84.76 | $25.07 | $109.83 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SANOMA, SUTTER, YOLO & YUBA COUNTIES) | $34.56 | $11.40 | $45.96 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES) | $36.53 | $9.27 | $45.80 |
| MARBLE FINISHER | $42.06 | $19.80 | $61.86 |
| BRICKLAYER: (16) MONTEREY, SANTA CRUZ SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE | $54.18 | $27.82 | $82.00 |
| BRICKLAYER: ( 9) EL DORADO, PLACER, SACRAMENTO, SUTTER SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE | $52.76 | $25.01 | $77.77 |
| BRICKLAYER: ( 8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE | $56.94 | $26.28 | $83.22 |
| BRICKLAYER: ( 7) MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SOLANO, SONOMA SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) ABOVE THE REGULAR RATE | $57.02 | $28.50 | $85.52 |
| TERRAZZO WORKER | $60.58 | $29.79 | $90.37 |
| TERRAZZO FINISHER | $44.93 | $20.98 | $65.91 |
| MARBLE MASON | $61.72 | $30.31 | $92.03 |
| TILE LAYER (SONOMA) | $56.79 | $22.54 | $79.33 |
| TILE LAYER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO, YUBA) | $55.55 | $21.08 | $76.63 |
| TILE LAYER (ALAMEDA, CONTRA COSTA, MARIN, MONTERREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO) | $59.92 | $22.62 | $82.54 |
| TILE FINISHER (SONOMA) | $35.78 | $19.23 | $55.01 |
| TILE FINISHER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO, YUBA) | $35.00 | $17.44 | $52.44 |
| SOUND & COMMUNICATIONS: TECHNICIAN (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $61.04 | $31.08 | $92.12 |
| SOUND & COMMUNICATIONS: INSTALLER (CONTRA COSTA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $53.08 | $30.84 | $83.92 |
| ELECTRICIAN (SANTA CLARA COUNTY) | $47.35 | $23.49 | $70.84 |
| SOUND & COMMUNICATIONS: TECHNICIAN (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $67.08 | $31.26 | $98.34 |
| SOUND & COMMUNICATIONS: INSTALLER (SANTA CLARA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $58.33 | $31.00 | $89.33 |
| ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 3 STORIES (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $23.10 | $12.48 | $35.58 |
| ELECTRICIAN: FOUR STORIES (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $39.06 | $24.51 | $63.57 |
| SOUND & COMMUNICATIONS: TECHNICIAN (COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $46.00 | $25.68 | $71.68 |
| SOUND & COMMUNICATIONS: INSTALLER (COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $40.00 | $25.50 | $65.50 |
| ELECTRICIAN (EL DORADO AND PLACER COUNTIES) ZONE PAY: ZONE 1 - 0 TO 70 MILES $0.00 PER HOUR ZONE 2 - 70 TO 90 MILES $5.00 PER HOUR ZONE 3 - 91 MILES AND OVER $7.00 PER HOUR | $31.88 | $8.46 | $40.34 |
| ELECTRICIAN (MARIN AND SONOMA COUNTIES) | $41.00 | $24.26 | $65.26 |
| ELECTRICIAN (ALAMEDA COUNTY) | $76.00 | $49.07 | $125.07 |
| CABLE SPLICER (ALAMEDA COUNTY) | $87.40 | $49.41 | $136.81 |
| SOUND & COMMUNICATIONS, INSTALLER (ALAMEDA COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $56.68 | $28.35 | $85.03 |
| ELECTRICIAN (SAN MATEO COUNTY) | $86.00 | $51.07 | $137.07 |
| ELEVATOR MECHANIC | $84.05 | $38.44 | $122.49 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c. (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES | $64.09 | $34.69 | $98.78 |
| LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $35.25 | $27.30 | $62.55 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: CRANES: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. "AREA 1" WAGE RATES ARE LISTED ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $63.06 | $34.69 | $97.75 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULIC: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) | $44.44 | $31.15 | $75.59 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. "AREA 1" WAGE RATES ARE LISTED ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $42.55 | $31.15 | $73.70 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCK CRANE OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) | $44.83 | $31.15 | $75.98 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANES: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) | $64.70 | $34.69 | $99.39 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) | $42.83 | $31.15 | $73.98 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) | $45.07 | $31.15 | $76.22 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: CRANES: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. "AREA 1" WAGE RATES ARE LISTED "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $66.39 | $34.69 | $101.08 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. "AREA 1" WAGE RATES ARE LISTED "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $43.79 | $31.15 | $74.94 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) | $46.08 | $31.15 | $77.23 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES | $54.69 | $34.69 | $89.38 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7cu. yds. (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES | $65.54 | $34.69 | $100.23 |
| LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITIONAL | $35.37 | $27.30 | $62.67 |
| LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (ALAMEDA COUNTY) | $37.46 | $27.30 | $64.76 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES | $56.71 | $34.69 | $91.40 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES | $57.79 | $34.69 | $92.48 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom-type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipewrapping machine (tractor propelled and supported); Screed(except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. "AREA 1" WAGE RATES ARE LISTED "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $58.88 | $34.69 | $93.57 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller; Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES | $60.15 | $34.69 | $94.84 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.; Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment) (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES | $61.36 | $34.69 | $96.05 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour) (EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SANTA CRUZ, SONOMA, SUTTER, by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. "AREA 1" WAGE RATES ARE LISTED "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIES THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1: All but the Northwestern Area 2: Reaminder | $62.69 | $34.69 | $97.38 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 4: CRANES: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;(ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $37.86 | $28.03 | $65.89 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCK CRAINE OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $37.58 | $28.03 | $65.61 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $35.11 | $28.03 | $63.14 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULIC: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $37.20 | $28.03 | $65.23 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: CRANES: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $63.06 | $34.69 | $97.75 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $37.83 | $28.03 | $65.86 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $35.34 | $28.03 | $63.37 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANES: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $64.70 | $34.69 | $99.39 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: CRANES: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $66.39 | $34.69 | $101.08 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $35.59 | $28.03 | $63.62 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) | $38.05 | $28.03 | $66.08 |
| OPERATOR: POWER EQUIPMENT, AREA 1:GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES) "AREA 1" WAGE RATES ARE LISTED "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. (SEE AREA DESCRIPTIONS BELOW) | $54.69 | $34.69 | $89.38 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES "AREA 1" WAGE RATES ARE LISTED BELOW "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) | $56.71 | $34.69 | $91.40 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES "AREA 1" WAGE RATES ARE LISTED BELOW "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) | $57.79 | $34.69 | $92.48 |
| PLUMBERS AND PIPEFITTERS (EL DORADO,PLACER, SACRAMENTO AND YOLO COUNTIES) | $55.58 | $24.02 | $79.60 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES "AREA 1" WAGE RATES ARE LISTED BELOW "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) | $58.88 | $34.69 | $93.57 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller; Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES "AREA 1" WAGE RATES ARE LISTED BELOW "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) | $60.15 | $34.69 | $94.84 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.; Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment) (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES "AREA 1" WAGE RATES ARE LISTED BELOW "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) | $61.36 | $34.69 | $96.05 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour) (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES "AREA 1" WAGE RATES ARE LISTED BELOW "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) | $62.69 | $34.69 | $97.38 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c. (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES "AREA 1" WAGE RATES ARE LISTED BELOW "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) | $64.09 | $34.69 | $98.78 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds. (ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SOLANO COUNTIES "AREA 1" WAGE RATES ARE LISTED BELOW "AREA 2" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DESCRIPTIONS BELOW) | $65.54 | $34.69 | $100.23 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $49.64 | $28.56 | $78.20 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $47.64 | $28.56 | $76.20 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $54.25 | $28.56 | $82.81 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $52.25 | $28.56 | $80.81 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $55.85 | $28.56 | $84.41 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $55.33 | $35.15 | $90.48 |
| IRONWORKERS: FENCE ERECTOR (ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $45.78 | $26.51 | $72.29 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL (SAN FRANCISCO CITY AND COUNTY) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $55.83 | $35.15 | $90.98 |
| IRONWORKERS: FENCE ERECTOR (SAN FRANCISCO CITY AND COUNTY) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $45.78 | $26.51 | $72.29 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL (REMAINING COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $50.70 | $35.15 | $85.85 |
| IRONWORKER: FENCE ERECTOR (REMAINING COUNTIES) PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock | $45.78 | $26.51 | $72.29 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 (AREA 2: EL DORADO, MONTEREY, PLACE, SACRAMENTO, SAN BENITO, SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES) SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations | $38.15 | $30.03 | $68.18 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 (AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO,SANMATEO, SANTA CLARA) SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations | $39.15 | $30.03 | $69.18 |
| LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $28.94 | $27.30 | $56.24 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONAL | $35.25 | $27.30 | $62.55 |
| LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker (salvaging of other building materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $35.35 | $27.30 | $62.65 |
| LABORERS:, WRECKING: GROUP 1 Skilled wrecker (removing and salvaging of sash, windows and materials) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $35.50 | $27.30 | $62.80 |
| LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $35.96 | $27.30 | $63.26 |
| LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $36.46 | $27.30 | $63.76 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION". (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $28.94 | $27.30 | $56.24 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY) (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $35.25 | $27.30 | $62.55 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $35.35 | $27.30 | $62.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $36.05 | $27.30 | $63.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $35.55 | $27.30 | $62.85 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $35.72 | $27.30 | $63.02 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL | $35.50 | $27.30 | $62.80 |
| LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $36.20 | $27.30 | $63.50 |
| LABORER: MASON TENDER-BRICK (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $36.29 | $25.55 | $61.84 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.25 | $27.30 | $63.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $29.94 | $27.30 | $57.24 |
| LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS) (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.35 | $27.30 | $63.65 |
| LABORERS:, WRECKING: GROUP 1 SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS ADN MATERIALS (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.50 | $27.30 | $63.80 |
| LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.25 | $27.30 | $63.55 |
| LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.37 | $27.30 | $63.67 |
| LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.96 | $27.30 | $64.26 |
| LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $37.46 | $27.30 | $64.76 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION". (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $29.94 | $27.30 | $57.24 |
| LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMAN (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.37 | $27.30 | $62.67 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY) (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.25 | $27.30 | $63.55 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.35 | $27.30 | $63.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $37.05 | $27.30 | $64.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.55 | $27.30 | $63.85 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.72 | $27.30 | $64.02 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $36.50 | $27.30 | $63.80 |
| LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL (MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES) | $37.20 | $27.30 | $64.50 |
| LABORER: MASON TENDER-BRICK MARIN COUNTY | $37.54 | $25.55 | $63.09 |
| MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO COUNTIES | $37.05 | $27.45 | $64.50 |
| PLASTERER TENDER (EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO AND YUBA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 |
| PLASTER TENDER (SAN FRANCISCO AND SAN MATEO COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.25 | $27.30 | $62.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $28.94 | $27.30 | $56.24 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA "A" - SANTA CLARA COUNTY) | $36.25 | $27.30 | $63.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD (AREA "A" - SANTA CLARA COUNTY) | $29.94 | $27.30 | $57.24 |
| LABORERS:, WRECKING - AREA B: GROUP 2 : Semi-skilled wrecker (salvaging of other building materials)(AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.35 | $27.30 | $62.65 |
| LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.50 | $27.30 | $62.80 |
| LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (AREA "A" - SANTA CLARA COUNTY) | $36.35 | $27.30 | $63.65 |
| LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA "A" - SANTA CLARA COUNTY) | $36.50 | $27.30 | $63.80 |
| LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORER (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.25 | $27.30 | $62.55 |
| LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GORUNDMAN (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.96 | $27.30 | $63.26 |
| LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL NOZZLEMAN (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $36.46 | $27.30 | $63.76 |
| LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER (AREA "A" - SANTA CLARA COUNTY) | $36.25 | $27.30 | $63.55 |
| LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN (AREA "A" - SANTA CLARA COUNTY) | $36.37 | $27.30 | $63.67 |
| LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (AREA "A" - SANTA CLARA COUNTY) | $36.96 | $27.30 | $64.26 |
| LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL NOZZLEMAN (AREA "A" - SANTA CLARA COUNTY) | $37.46 | $27.30 | $64.76 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification "material cleaner" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection". (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $28.94 | $27.30 | $56.24 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.25 | $27.30 | $62.55 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.35 | $27.30 | $62.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $36.08 | $27.30 | $63.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $36.05 | $27.30 | $63.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.55 | $27.30 | $62.85 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.72 | $27.30 | $63.02 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $35.50 | $27.30 | $62.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill (AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $36.20 | $27.30 | $63.50 |
| LABORERS:, GUNITE: GROUP 3 REBOUNDMAN (ALAMEDA COUNTY) | $36.37 | $27.30 | $63.67 |
| LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN (ALAMEDA COUNTY) | $36.96 | $27.30 | $64.26 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification "material cleaner" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection". (AREA "A" - SANTA CLARA COUNTY) | $29.94 | $27.30 | $57.24 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) (AREA "A" - SANTA CLARA COUNTY) | $36.25 | $27.30 | $63.55 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches (AREA "A" - SANTA CLARA COUNTY) | $36.35 | $27.30 | $63.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA "A" - SANTA CLARA COUNTY AREA "B" - MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) | $37.08 | $27.30 | $64.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. (AREA "A" - SANTA CLARA COUNTY) | $37.05 | $27.30 | $64.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA "A" - SANTA CLARA COUNTY) | $36.55 | $27.30 | $63.85 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder (AREA "A" - SANTA CLARA COUNTY) | $36.72 | $27.30 | $64.02 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA "A" - SANTA CLARA COUNTY) | $36.50 | $27.30 | $63.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4 ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. B: AT THE CONCLUSION OF A JOB WHERE THE MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION". (ALAMEDA COUNTY) | $29.94 | $27.30 | $57.24 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3 CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY) (ALAMEDA COUNTY) | $36.25 | $27.30 | $63.55 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES (ALAMEDA COUNTY) | $36.35 | $27.30 | $63.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-F WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE (ALAMEDA COUNTY) | $37.08 | $27.30 | $64.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-E WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. (ALAMEDA COUNTY) | $37.05 | $27.30 | $64.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING (ALAMEDA COUNTY) | $36.55 | $27.30 | $63.85 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER (ALAMEDA COUNTY) | $36.72 | $27.30 | $64.02 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER (ALAMEDA COUNTY) BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS (NOT APPLICABLE TO WORKERS ENTITLED TO RECEIVE THE WAGE RATE SET FORTH IN GROUP 1-A): $0.25 PER HOUR ADDITIONAL. SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. "SEWER CLEANER" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.50 | $27.30 | $63.80 |
| LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL (ALAMEDA COUNTY) | $37.20 | $27.30 | $64.50 |
| BRICK TENDER (ALAMEDA COUNTY) | $37.05 | $27.45 | $64.50 |
| PLASTERER TENDER (ALAMEDA AND CONTRA COSTA COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.25 | $27.30 | $62.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $28.94 | $27.30 | $56.24 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION (AREA "A" - CONTRA COSTA COUNTY ) | $36.25 | $27.30 | $63.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD (AREA "A" - CONTRA COSTA COUNTY) | $29.94 | $27.30 | $57.24 |
| LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.35 | $27.30 | $62.65 |
| LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.50 | $27.30 | $62.80 |
| LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (AREA "A" - CONTRA COSTA COUNTY ) | $36.35 | $27.30 | $63.65 |
| LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) (AREA "A" - CONTRA COSTA COUNTY ) | $36.50 | $27.30 | $63.80 |
| LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborer (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.25 | $27.30 | $62.55 |
| LABORERS:, GUNITE - AREA B: GROUP 3: Reboundman (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.37 | $27.30 | $62.67 |
| LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman, Gunman, Potman, Groundman (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.96 | $27.30 | $63.26 |
| LABORERS:, GUNITE - AREA B: GROUP 1: Structural nozzleman (AREA "A" - CONTRA COSTA COUNTY) | $36.46 | $27.30 | $63.76 |
| LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer (AREA "A" - CONTRA COSTA COUNTY) | $36.25 | $27.30 | $63.55 |
| LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman (AREA "A" - CONTRA COSTA COUNTY) | $36.37 | $27.30 | $63.67 |
| LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman, Gunman, Potman, Groundman (AREA "A" - CONTRA COSTA COUNTY) | $36.96 | $27.30 | $64.26 |
| LABORERS:, GUNITE - AREA A: GROUP 1: Structural nozzleman (AREA "A" - CONTRA COSTA COUNTY) | $37.46 | $27.30 | $64.76 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification "material cleaner" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of "form stripping, cleaning and oiling and moving to the next point of erection". (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $28.94 | $27.30 | $56.24 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.25 | $27.30 | $62.55 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.35 | $27.30 | $62.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $36.08 | $27.30 | $63.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-E: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $36.05 | $27.30 | $63.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-C: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.55 | $27.30 | $62.85 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1-A: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.72 | $27.30 | $63.02 |
| PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (2) NEW CONSTRUCTION IN SAN FRANCISCO COUNTY (MARIN, SAN FRANCISCO & SONOMA COUNTIES) | $91.00 | $49.49 | $140.49 |
| PLUMBER, STEAMFITTER, REFRIGERATION FITTER: (1) Wood Frame Construction in San Francisco, and all work in Marin & Sonoma Counties (MARIN, SAN FRANCISCO & SONOMA COUNTIES) | $82.00 | $48.18 | $130.18 |
| LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER (MARIN, SAN FRANCISCO & SONOMA COUNTIES) | $77.35 | $36.53 | $113.88 |
| PLUMBER & STEAMFITTER (MONTEREY AND SANTA CRUZ COUNTIES) | $57.75 | $43.60 | $101.35 |
| PLUMBER, PIPEFITTER, STEAMFITTER (CONTRA COSTA COUNTY) | $43.72 | $20.29 | $64.01 |
| PLUMBER (SUTTER & YUBA COUNTIES) | $52.75 | $41.39 | $94.14 |
| PLUMBER & STEAMFITTER (ALAMEDA COUNTY) | $80.50 | $50.45 | $130.95 |
| PLUMBERS AND PIPEFITTERS (NAPA AND SOLANO COUNTIES) | $37.35 | $21.15 | $58.50 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $35.50 | $27.30 | $62.80 |
| CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER MARIN COUNTY | $52.80 | $30.82 | $83.62 |
| CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN COUNTY | $52.65 | $30.82 | $83.47 |
| CARPENTERS: MILLWRIGHT EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES | $57.01 | $35.11 | $92.12 |
| CARPENTERS: JOURNEYMAN CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE | $54.51 | $33.52 | $88.03 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES | $54.66 | $33.52 | $88.18 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES | $60.39 | $33.52 | $93.91 |
| CARPENTERS: MILLWRIGHT (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES) | $55.66 | $35.11 | $90.77 |
| CARPENTERS: JOURNEYMAN CARPENTER (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES) | $53.16 | $33.52 | $86.68 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES | $53.31 | $33.52 | $86.83 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (EL DORADO (EAST), PLACER (EAST), SUTTER AND YUBA COUNTIES) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: MILLWRIGHT (CONTRA COSTA COUNTY) | $52.75 | $32.41 | $85.16 |
| CARPENTERS: JOURNEYMAN CARPENTER (CONTRA COSTA COUNTY) | $52.65 | $30.82 | $83.47 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (CONTRA COSTA COUNTY) | $52.80 | $30.82 | $83.62 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (CONTRA COSTA COUNTY) | $52.65 | $30.82 | $83.47 |
| CARPENTERS: MILLWRIGHT SOLANO COUNTY | $54.95 | $33.08 | $88.03 |
| CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTY | $54.85 | $31.49 | $86.34 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER SOLANO COUNTY | $55.00 | $31.49 | $86.49 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER SOLANO COUNTY | $54.85 | $31.49 | $86.34 |
| CARPENTERS: MILLWRIGHT (SAN MATEO COUNTY) | $60.49 | $35.11 | $95.60 |
| CARPENTERS: JOURNEYMAN CARPENTER (SAN MATEO COUNTY) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN MATEO COUNTY) | $60.54 | $33.52 | $94.06 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN MATEO COUNTY) | $60.39 | $33.52 | $93.91 |
| CARPENTERS: MILLWRIGHT (SANTA CLARA COUNTY) | $54.95 | $33.08 | $88.03 |
| CARPENTERS: JOURNEYMAN CARPENTER (SANTA CLARA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CLARA COUNTY) | $55.00 | $31.49 | $86.49 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CLARA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: MILLWRIGHT (SAN BENITO COUNTY) | $51.47 | $33.08 | $84.55 |
| CARPENTERS: JOURNEYMAN CARPENTER (SAN BENITO COUNTY) | $48.97 | $31.49 | $80.46 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SAN BENITO COUNTY) | $49.12 | $31.49 | $80.61 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SAN BENITO COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: MILLWRIGHT (SANTA CRUZ COUNTY) | $51.47 | $33.08 | $84.55 |
| CARPENTERS: JOURNEYMAN CARPENTER (SANTA CRUZ COUNTY) | $48.97 | $31.49 | $80.46 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (SANTA CRUZ COUNTY) | $49.12 | $31.49 | $80.61 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (SANTA CRUZ COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: MILLWRIGHT (MONTEREY COUNTY) | $51.47 | $33.08 | $84.55 |
| CARPENTERS: JOURNEYMAN CARPENTER (MONTEREY COUNTY) | $48.97 | $31.49 | $80.46 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (MONTEREY COUNTY) | $49.12 | $31.49 | $80.61 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (MONTEREY COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: MILLWRIGHT (ALAMEDA COUNTY) | $54.95 | $33.08 | $88.03 |
| CARPENTERS: JOURNEYMAN CARPENTER (ALAMEDA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (ALAMEDA COUNTY) | $55.00 | $31.49 | $86.49 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (ALAMEDA COUNTY) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: MILLWRIGHT (NAPA AND SONOMA COUNTIES) | $54.95 | $33.08 | $88.03 |
| CARPENTERS: JOURNEYMAN CARPENTER (NAPA AND SONOMA COUNTIES) | $54.85 | $31.49 | $86.34 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (NAPA AND SONOMA COUNTIES) | $55.00 | $31.49 | $86.49 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (NAPA AND SONOMA COUNTIES) | $54.85 | $31.49 | $86.34 |
| SOUND & COMMUNICATIONS: TECHNICIAN (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $67.65 | $31.78 | $99.43 |
| SOUND & COMMUNICATIONS: INSTALLER (SAN FRANCISCO COUNTY) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $58.83 | $31.51 | $90.34 |
| ELECTRICIAN (SAN FRANCISCO COUNTY) WORK ON RESIDENTIAL WOOD FRAME REMODEL AND REPAIR IN ALL WOOD-CONSTRUCTED BUILDINGS NOT TO EXCEED 24 LIVING UNITS; AND NEW WOOD FRAME SINGLE STRUCTURE 1 OR 2 FAMILY HOUSES, OR ON ALL WOOD- CONSTRUCTED BUILDINGS NOT TO EXCEED 20 LIVING UNITS UNDER 1 ROOF EXCLUDING PROJECTS OR TRACTS CONTAINING MORE THAN 2 HOUSES, OR MORE THAN 1 BUILDING | $55.50 | $25.64 | $81.14 |
| ELECTRICIAN: ALL OTHER WORK (SAN FRANCISCO COUNTY) | $91.25 | $48.05 | $139.30 |
| ELECTRICIAN (NAPA & SOLANO COUNTIES) | $38.50 | $21.16 | $59.66 |
| ELECTRICIAN: ZONE B: (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ZONE B: ANY AREA OUTSIDE OF ZONE A | $77.45 | $33.97 | $111.42 |
| ELECTRICIAN: ZONE A: (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) ZONE A: ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN 25 AIR MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE | $70.41 | $33.76 | $104.17 |
| SOUND & COMMUNICATIONS: TECHNICIAN (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $55.12 | $24.30 | $79.42 |
| SOUND & COMMUNICATIONS: INSTALLER (MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES) SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; INCLUSION OR EXCLUSION OF TERMINATIONS AND TESTINGS OF CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $47.93 | $24.09 | $72.02 |
| ELECTRICIAN (CONTRA COSTA COUNTY) | $66.26 | $35.84 | $102.10 |
| CABLE SPLICER (CONTRA COSTA COUNTY) | $74.54 | $36.09 | $110.63 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 2) THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $57.85 | $28.56 | $86.41 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill (AREA "B" - NAPA, SOLANO, AND SONOMA COUNTIES) | $36.20 | $27.30 | $63.50 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification "material cleaner" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of "form stripping, cleaning and oiling and moving to the next point of erection". (AREA "A" - CONTRA COSTA COUNTY) | $29.94 | $27.30 | $57.24 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) (AREA "A" - CONTRA COSTA COUNTY) | $36.25 | $27.30 | $63.55 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 (AREA "A" - CONTRA COSTA COUNTY) | $36.35 | $27.30 | $63.65 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-G CONTRA COSTA COUNTY: Pipelayer (including grade checking on connection with peiplaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole from setters (AREA "A" - CONTRA COSTA COUNTY) | $36.70 | $27.30 | $64.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-F: Wire winding machine in connection with guniting or shot crete (AREA "A" - CONTRA COSTA COUNTY) | $37.08 | $27.30 | $64.38 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF (AREA "A" - CONTRA COSTA COUNTY) | $37.05 | $27.30 | $64.35 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-C: (BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE (AREA "A" - CONTRA COSTA COUNTY) | $36.55 | $27.30 | $63.85 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1-A OY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT (AREA "A" - CONTRA COSTA COUNTY) SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. "SEWER CLEANER" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES, SHALL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE MAINTENANCE AND REPAIR TRACK AND ROAD BEDS (UNDERGROUND STRUCTURES). ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED | $36.72 | $27.30 | $64.02 |
| PLUMBERS AND PIPEFITTERS (EL DORADO AND PLACER COUNTIES (LAKE TAHOE BASIN ONLY)) | $52.14 | $18.71 | $70.85 |
| UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER (ALAMEDA, CONTRA COSTA, EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, SUTTER, YOLO AND YUBA COUNTIES) | $36.01 | $18.50 | $54.51 |
| PLUMBERS AND PIPEFITTERS (SAN BENITO & SANTA CLARA COUNTIES) | $30.90 | $7.90 | $38.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker (AREA "A" - CONTRA COSTA COUNTY) | $36.50 | $27.30 | $63.80 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill (AREA "A" - CONTRA COSTA COUNTY) | $37.20 | $27.30 | $64.50 |
| LABORER: MASON TENDER-BRICK (SOLANO AND SONOMA COUNTIES) | $36.84 | $26.24 | $63.08 |
| BRICK TENDER (CONTRA COSTA COUNTY) | $37.05 | $27.45 | $64.50 |
| PLASTER TENDER (EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES) Work on a swing stage scaffold: $1.00 per hour additional | $39.77 | $28.54 | $68.31 |
| PAINTERS: BRUSH (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR | $43.45 | $22.80 | $66.25 |
| SOFT FLOOR LAYER (ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ AND SONOMA COUNTIES) | $59.00 | $33.03 | $92.03 |
| DRYWALL FINISHER/TAPER: (AREA 2) AREA 2: EL DORADO COUNTY, MONTEREY, PLACER, SACRAMENTO, BENITO, SANTA CRUZ, SIERRA, SUTTER AND YUBA COUNTIES | $59.63 | $31.29 | $90.92 |
| DRYWALL FINISHER/TAPER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, NAPA, SAN FRANCISCO, SAN SANTA CLARA, SOLANO AND SONOMA COUNTIES | $63.76 | $32.69 | $96.45 |
| PAINTER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO & SONOMA COUNTIES) | $53.38 | $28.04 | $81.42 |
| PAINTER (SAN FRANCISCO COUNTY) | $57.00 | $28.04 | $85.04 |
| GLAZIER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SONOMA COUNTIES;AND SOLANO COUNTY (WEST OF A LINE DEFINED AS FOLLOWS: HWY. 80 CORRIDOR BEGINNING AT THE CITY OF FAIRFIELD, INCLUDING TRAVIS AIR FORCE BASE AND SUISUN CITY; GOING NORTH OF MANAKAS CORNER RD., CONTINUE NORTH ON SUISUN VALLEY RD. TO THE NAPA COUNTY LINE; HWY. 80 CORRIDOR SOUTH ON GRIZZLY ISLAND RD. TO THE GRIZZLY ISLAND MANAGEMENT AREA) | $56.22 | $34.00 | $90.22 |
| PAINTER: SPRAY PAINTER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK = $1.00/HR SWING STAGE = $2.00/HR | $41.43 | $16.16 | $57.59 |
| PAINTER: PAPER HANGER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK = $1.00/HR SWING STAGE = $2.00/HR | $42.19 | $16.16 | $58.35 |
| PAINTER: BRUSH AND ROLLER (EL DORADO AND PLACER COUNTIES) PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS (BRUSH), & SANDBLAST = $0.50/HR SPECIAL COATINGS (SPRAY), & STEEPLEJACK = $1.00/HR SWING STAGE = $2.00/HR | $39.43 | $16.16 | $55.59 |
| SOFT FLOOR LAYER (EL DORADO AND PLACER COUNTIES) | $34.27 | $16.47 | $50.74 |
| DRYWALL FINISHER/TAPER (EL DORADO AND PLACER COUNTIES) STEEPLEJACK-DRYWALL FINISHER OVER 40 FT WITH OPEN SPACE BELOW: $1.50 ADDITIONAL PER HOUR | $42.79 | $16.12 | $58.91 |
| GLAZIER (EL DORADO, PLACER, SACRAMENTO, SOLANO, SUTTER, YOLO AND YUBA COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $43.25 | $35.62 | $78.87 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING | $35.11 | $17.62 | $52.73 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS | $40.83 | $17.62 | $58.45 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER | $34.71 | $17.62 | $52.33 |
| SOFT FLOOR LAYER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $48.54 | $26.59 | $75.13 |
| PLASTERER (ALAMEDA, CONTRA COSTA, SAN FRANCISCO AND SAN MATEO COUNTIES) | $42.41 | $30.73 | $73.14 |
| PLASTERER (AREA 355: MARIN COUNTY) | $36.73 | $31.68 | $68.41 |
| PLASTERER (AREA 337: MONTEREY COUNTY) | $32.88 | $31.68 | $64.56 |
| PLASTERER (AREA 295: EL DORADO, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA, SUTTER, YOLO & YUBA COUNTIES) | $32.70 | $31.68 | $64.38 |
| PLASTERER (AREA 224: SAN BENITO, SANTA CLARA & SANTA CRUZ COUNTIES) | $32.88 | $31.68 | $64.56 |
| CEMENT MASON/CONCRETE FINISHER | $32.15 | $23.27 | $55.42 |
| PLUMBER/PIPEFITTER/STEAMFITTER (SAN MATEO COUNTY) | $87.75 | $41.44 | $129.19 |
| ROOFER (SAN FRANCISCO & SAN MATEO COUNTIES) | $55.30 | $22.97 | $78.27 |
| ROOFER (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SOLANO, AND SONOMA COUNTIES) | $54.94 | $23.34 | $78.28 |
| ROOFER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $46.73 | $21.36 | $68.09 |
| ROOFER: KETTLE PERSON (2 KETTLES) (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $55.17 | $21.51 | $76.68 |
| ROOFER: JOURNEYMAN (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $53.17 | $21.51 | $74.68 |
| ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER (MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES) | $57.17 | $21.51 | $78.68 |
| SPRINKLER FITTER (ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO AND SONOMA COUNTIES) | $49.82 | $18.05 | $67.87 |
| SPRINKLER FITTER (MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES) | $49.69 | $29.72 | $79.41 |
| SPRINKLER FITTER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $52.06 | $29.86 | $81.92 |
| SHEET METAL WORKER: (AREA 2) AREA 2: MONTEREY & SAN BENITO | $60.64 | $39.04 | $99.68 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill (AREA "A" - SANTA CLARA COUNTY) | $37.20 | $27.30 | $64.50 |
| MASON TENDER, BRICK (SANTA CRUZ COUNTY) | $35.29 | $26.85 | $62.14 |
| MASON TENDER, BRICK (SANTA CLARA COUNTY) | $35.29 | $26.85 | $62.14 |
| LABORER: MASON TENDER-BRICK (MONTEREY AND SAN BENITO COUNTIES) | $36.29 | $25.55 | $61.84 |
| PLASTER TENDER (SANTA CLARA & SANTA CRUZ) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $40.68 | $29.68 | $70.36 |
| PLASTERER TENDER (MONTEREY AND SAN BENITO COUNTIES) WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $40.68 | $29.68 | $70.36 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION (ALAMEDA COUNTY) | $36.25 | $27.30 | $63.55 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD (ALAMEDA COUNTY) | $29.94 | $27.30 | $57.24 |
| LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled wrecker (salvaging of other building materials) (ALAMEDA COUNTY) | $36.35 | $27.30 | $63.65 |
| LABORERS:, WRECKING: GROUP 1 Skilled wrecker (removing and salvaging of sash, windows and materials) (ALAMEDA COUNTY) | $36.50 | $27.30 | $63.80 |
| LABORERS:, GUNITE: GROUP 4 GUNITE LABORER (ALAMEDA COUNTY) | $36.25 | $27.30 | $63.55 |
| SHEET METAL WORKER: (AREA 3) AREA 3: SANTA CRUZ | $55.16 | $34.18 | $89.34 |
| SHEET METAL WORKER: (AREA 1) AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO & SONOMA | $67.03 | $50.79 | $117.82 |
| SHEET METAL WORKER (EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES) | $30.29 | $16.41 | $46.70 |
| TRUCK DRIVERS: GROUP 5: DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES | $44.56 | $34.28 | $78.84 |
| TRUCK DRIVERS: GROUP 4: DUMP TRUCKS, OVER 25 YDS. AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS (WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND TRUCK REPAIRMAN | $44.21 | $34.28 | $78.49 |
| TRUCK DRIVERS: GROUP 3: DUMP TRUCKS, 8 YDS. AND INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.; WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY TRANSPORT TILLER PERSON; SELF- PROPELLED STREET SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK - HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON AND ROAD OILER; DRY DISTRIBUTION TRUCK (A BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW | $43.86 | $34.28 | $78.14 |
| TRUCK DRIVERS: GROUP 2: DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND "A" FRAME DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED TRACTOR | $43.56 | $34.28 | $77.84 |
| TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES) | $43.26 | $34.28 | $77.54 |