Amador County, California: Davis-Bacon prevailing wages

Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.

Bidding a job in Amador County? Pin your bid date to lock the revision that legally applies under the FAR ten-day rule, and get an email if anything moves before or after opening.

Building CA20260023 rev 1

ClassificationRateFringeTotal
TILE SETTER$18.92$3.29$22.21
TILE FINISHER$10.68$1.65$12.33
TERRAZZO FINISHER (BASE MACHINE OPERATOR)$16.72$3.95$20.67
TERRAZZO FINISHER$16.02$3.95$19.97
SPRINKLER FITTER$21.87$3.23$25.10
SHEET METAL WORKER$18.37$7.26$25.63
ROOFERS: SLATE, TILE AND COMPOSITION$15.00$7.64$22.64
ROOFERS: ENAMELER AND PITCH$17.65$7.64$25.29
PLUMBER AND STEAMFITTER (AMADOR COUNTY (SOUTHERN HALF))$22.03$6.35$28.38
PLUMBER AND STEAMFITTER (AMADOR COUNTY (NORTHERN HALF))$19.72$6.71$26.43
PLASTERER$17.36$6.35$23.71
PARKING LOT STRIPING; HIGHWAY MARKERS: (SLURRY SEAL OPERATION: APPLICATOR OPERATION; SHUTTLE; SQUEEGEE)$13.37$2.00$15.37
PARKING LOT STRIPING: HIGHWAY MARKERS: (TRAFFIC SURFACE PROTECTIVE COATING APPLICATOR) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund$14.48$2.00$16.48
PARKING LOT STRIPING: HIGHWAY MARKERS: (TRAFFIC DELINEATING DEVICE APPLICATOR) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund$14.83$2.00$16.83
PARKING LOT STRIPING: HIGHWAY MARKERS: (SANDBLASTER; STRIPER; WHEEL STOP INSTALLER) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund$14.30$2.00$16.30
PARKING LOT STRIPING: HIGHWAY MARKERS: (MIXER OPERATOR) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund$13.95$2.00$15.95
PARKING LOT STRIPING: HIGHWAY MARKERS: (COMPACTOR, TOP, TRAFFIC CONTROL, SERVICE AND SPREADER) b. Employer contributes $ .80 per hour to vacation fund for the first year of employment; 1 year but less than 5 years, 1.13 per hour to vacation fund; 5 years but less than 10 years, 1.48 per hour to vacation fund; over 10 years 1.83 per hour to vacation fund$12.39$2.00$14.39
PAINTERS: SPRAY$14.64$4.60$19.24
PAINTERS: SANDBLASTER; SCAFFOLD; SHEETROCK; STRUCTURAL STEEL; SWING STAGE; TAPER$15.79$4.60$20.39
PAINTERS: BRUSH$14.39$4.60$18.99
MARBLE SETTER, TERRAZZO WORKER$17.57$4.60$22.17
MARBLE FINISHER$15.92$4.67$20.59
LABORER: GUNITE GROUP 3 General laborer$12.88$5.36$18.24
LABORER: GUNITE GROUP 2 Rebound$13.00$5.36$18.36
LABORER: GUNITE GROUP 1 Nozzle operator (including gun, pot); Ground$13.52$5.36$18.88
IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL$18.90$8.95$27.85
IRONWORKERS: FENCE ERECTOR$18.01$8.93$26.94
INSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)$24.85$5.61$30.46
GLAZIER$17.75$6.44$24.19
FLOOR LAYER: CARPET$16.06$3.00$19.06
ELEVATOR CONSTRUCTOR$29.39$3.29$32.68
ELECTRICIANS: SOUND AND SIGNAL TECHNICIAN$15.65$1.50$17.15
ELECTRICIANS: RESIDENTIAL ELECTRICIAN$14.50$3.30$17.80
ELECTRICIANS: CABLE SPLICER$17.93$3.92$21.85
ELECTRICIAN$16.30$3.87$20.17
DRYWALL INSTALLERS/LATHERS: DRYWALL STOCKER, SCRAPPER & CLEAN-UP$10.07$3.34$13.41
DRYWALL INSTALLERS/LATHERS: DRYWALL INSTALLER/LATHER$18.14$6.48$24.62
CEMENT MASONS: SWING OR SLIP FORM SCAFFOLDS; MASTIC, MAGNESITE, GYPSUM, EPOXY, POLYESTER, RESIN AND ALL COMPOSITION$17.16$6.18$23.34
CEMENT MASONS: CEMENT MASON$16.91$6.18$23.09
CARPENTERS: PILEDRIVER, BRIDGE, WHARF AND DOCK BUILDER$19.38$9.71$29.09
CARPENTERS: MILLWRIGHT$20.48$7.86$28.34
CARPENTERS: HARDWOOD FLOORLAYER; POWER SAW OPERATOR; SAW FILER; SHINGLER; STEEL SCAFFOLD ERECTOR AND STEEL SHORING$18.73$6.46$25.19
CARPENTER$18.58$6.46$25.04
BRICKLAYER, STONEMASON$17.57$4.04$21.61
BRICK TENDER$15.80$3.46$19.26
BOILERMAKER - BLACKSMITH (STORAGE TANK REPAIR)$17.05$4.00$21.05
BOILERMAKER - BLACKSMITH (STORAGE TANK ERECTION))$19.25$4.00$23.25
BOILERMAKER$22.60$4.25$26.85
TRUCK DRIVERS 37 classifications · $24.24 to $29.38 total
ClassificationRateFringeTotal
TRUCK DRIVERS: GROUP 37 Over 80 to 95 yds$22.34$7.04$29.38
TRUCK DRIVERS: GROUP 36 Over 65 to 80 yds$19.99$7.04$27.03
TRUCK DRIVERS: GROUP 35 Bulk cement spreader (with or without auger, over 50 yds. and under 65 yds. water level); Dump (over 50 yds. and under 65 yds. water level); Dumpcrete (over 50 yds. and under 65 yds. water level); Dumpster (over 50 yds. and under 65 yds. water level); Helicopter pilot (when transporting workers ormaterials); Skid (debris box, over 50 yds. and under 65 yds. water level); Truck (dry pre-batch concrete mix, over 50 yds. and under 65 yds. water level)$19.04$7.04$26.08
TRUCK DRIVERS: GROUP 34 DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, Tournarocker, Euclid and similar type equipment when pulling Aqua/Pak or water tank trailers$19.89$7.04$26.93
TRUCK DRIVERS: GROUP 33 Bulk cement spreader (with or without auger, over 35 yds. and including 50 yds. water level); Dump (over 35 yds. and including 50 yds. water level); Dumpcrete (over 35 yds. and including 50 yds. water level); Dumpster (over 35 yds. and including 50 yds. water level); Skid (debris box, over 35 yds. and including 50 yds. water level); Truck (dry pre-batch concrete mix, over 35 yds. and including 50 yds. water level)$19.69$7.04$26.73
TRUCK DRIVERS: GROUP 32 Bulk cement spreader (with or without auger, over 24 yds. and including 35 yds. water level); Dump (over 24 yds. and including 35 yds. water level); Dumpcrete (over 24 yds. and including 35 yds. water level); Dumpster (over 24 yds. and including 35 yds. water level); DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, Tournarocker, Euclid and similar type equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers; Skid (debris box, over 24 yds. and including 35 yds. water level); Truck (dry pre- batch concrete mix, over 24 yds. and including 35 yds. water level)$19.47$7.04$26.51
TRUCK DRIVERS: GROUP 31 Bulk cement spreader (with or without auger, over 18 yds. and including 24 yds. water level); Combination dump and dump trailer; Dump (over 18 yds. and including 24 yds. water level); Dumpcrete (over 18 yds. and including 24 yds. water level); Dumpster (over 18 yds. and including 24 yds. water level); Skid (debris box, over 18 yds. and including 24 yds. water level); Transit mix agitator (over 12 yds. through 16 yds.); Truck (dry pre-batch concrete mix, over 18 yds. and including 24 yds. water level)$19.54$7.04$26.58
TRUCK DRIVERS: GROUP 30 Truck repair; Hydro-lift or Swedish crane type (including when Swedish crane is used for jetting); Hydro-lift extension or retracting crane (boom-type)$19.48$7.04$26.52
TRUCK DRIVERS: GROUP 29 Transit mix agitator (over 14 yds. through 16 yds.)$19.45$7.04$26.49
TRUCK DRIVERS: GROUP 28 P.B. or similar type self-loading truck$19.44$7.04$26.48
TRUCK DRIVERS: GROUP 27 Double gooseneck (7 or more axles); Heavy-duty transport tiller$19.40$7.04$26.44
TRUCK DRIVERS: GROUP 26 Ammonia nitrate distributor driver and mixer; Bulk cement spreader (with or without auger, over 12 yds. and including 18 yds. water level); Dump (over 12 yds. and including 18 yds. water level); Dumpcrete (over 12 yds. and including 18 yds. water level); Dumpster (over 12 yds. and including 18 yds. water level); Skid (debris box, over 12 yds. and including 18 yds. water level); Truck (dry pre-batch concrete mix, over 12 yds. and including 18 yds. water level)$19.38$7.04$26.42
TRUCK DRIVERS: GROUP 25 Heavy-duty transport (gooseneck lowbed); Transit mix or agitator (over 12 yds. through 14 yds.)$19.35$7.04$26.39
TRUCK DRIVERS: GROUP 24 Bulk cement spreader (with or without auger, 8 ys. and including 12 yds. water level); Dump (8 yds. and including 12 yds. water level); Dumpcrete (8 yds. and including 12 yds. water level); Dumpster (8 yds. and including 12 yds. water level); Self-propelled street sweeper with self-contained refuse bin; Skid (debris box, 8 yds. and including 12 yds. water level); Snow Go and/or snow plow; Truck (dry pre-batch concrete mix, 8 yds. and including 12 yds. water level)$19.34$7.04$26.38
TRUCK DRIVERS: GROUP 23 Transit mix or agitator (over 10 yds. through 12 yds.)$19.25$7.04$26.29
TRUCK DRIVERS: GROUP 22 Combination boot person and road oiler$19.24$7.04$26.28
TRUCK DRIVERS: GROUP 21 Jetting truck and water truck (5,000 gallons and under 7,000 gallons)$19.21$7.04$26.25
TRUCK DRIVERS: GROUP 20 Vacuum truck (5,500 gallons and under 7,500 gallons)$19.16$7.04$26.20
TRUCK DRIVERS: GROUP 19 Transit mix or agitator (8 yds. through 10 yds.)$19.15$7.04$26.19
TRUCK DRIVERS: GROUP 18 Ross Hyster and similar straddle carrier$19.14$7.04$26.18
TRUCK DRIVERS: GROUP 17 Heavy-duty transport (high bed)$19.12$7.04$26.16
TRUCK DRIVERS: GROUP 16 A-frame, winch truck; Buggymobile; Jetting and water truck (4,000 gallons and under 5,000 gallons); Rubber-tired truck jumbo$19.11$7.04$26.15
TRUCK DRIVERS: GROUP 15 Bulk cement spreader (with or without auger, 6 yds. and under 8 yds. water level); Dump (6 yds. and under 8 yds. water level); Dumpcrete (6 yds. and under 8 yds. water level); Dumpster (6 yds. and under 8 yds. water level); Skid (debris box, 6 yds. and under 8 yds. water level); Truck (dry pre-batch concrete mix, 6 yds. and under 8 yds. water level)$19.40$7.04$26.44
TRUCK DRIVERS: GROUP 14 Rubber-tired muck car (not self-loaded)$19.07$7.04$26.11
TRUCK DRIVERS: GROUP 13 Vacuum truck, 3,500 gallons and under 5,500 gallons$19.26$7.04$26.30
TRUCK DRIVERS: GROUP 12 Combination winch truck with hoist; Transit mix or agitator (6 yds. and under 8 yds.)$19.25$7.04$26.29
TRUCK DRIVERS: GROUP 11 Jetting truck and water truck, 2,500 gallons and under 4,000 gallons$19.01$7.04$26.05
TRUCK DRIVERS: GROUP 10 Scissor truck; Single unit flat rack (3-axle unit); Industrial lift truck (mechanical tailgate); Small rubber-tired tractor (when used within teamsters' jurisdiction)$19.00$7.04$26.04
TRUCK DRIVERS: GROUP 9 Vacuum truck, under 3,500 gallons$17.98$7.04$25.02
TRUCK DRIVERS: GROUP 8 Fuel and/or grease truck driver or fuel worker$17.97$7.04$25.01
TRUCK DRIVERS: GROUP 7 Transit mix, agitator (under 6 yds.)$17.95$7.04$24.99
TRUCK DRIVERS: GROUP 6 Lift jitney, fork lift$17.93$7.04$24.97
TRUCK DRIVERS: GROUP 5 Road oil truck or boot$17.92$7.04$24.96
TRUCK DRIVERS: GROUP 4 Jetting truck and water truck (under 2,500 gallons)$17.91$7.04$24.95
TRUCK DRIVERS: GROUP 3 Bulk cement spreader (with or without auger, 4 yd. and under 6 yds. water level); Dump (4 yds. and under 6 yds. water level); Dumpcrete (4 yds. and under 6 yds. water level); Dumpster (4 yds. and under 6 yds. water level); Skid (debris box, 4 yds. and under 6 yds. water level); Single unit flat rack (2-axle unit); Industrial lift truck (mechanical tailgate); Truck (dry pre-batch concrete mix, 4 yds. and under 6 yds. water level)$17.90$7.04$24.94
TRUCK DRIVERS: GROUP 2 Teamster oiler and/or greaser and/or service$17.88$7.04$24.92
TRUCK DRIVERS: GROUP 1 Bulk cement spreader (with or without auger, under 4 yds. water level); Bus driver; Concrete pump machine; Concrete pump truck (when flat rack truck is used appropriate flat rack rate shall apply); Dump (under 4 yds. water level); Dumpcrete truck (under 4 yds. water level); Dumpster (under 4 yds. water level); Escort or pilot car driver; Nipper truck (when flat rack truck is used appropriate flat rack rate shall apply); Pick-up; Skid (debris box, under 4 yds. water level); Team driver; Truck (dry pre-batch concrete mix, under 4 yds. water level)$17.20$7.04$24.24
POWER EQUIPMENT OPERATORS 32 classifications · $24.36 to $36.25 total
ClassificationRateFringeTotal
POWER EQUIPMENT OPERATORS: GROUP 2 Compressor operator; Concrete mixer (up to and including 1 yd.); Conveyor belt operator (tunnel); Fire tender, hot plant; Hydraulic monitor; Mechanical conveyor (handling building materials); Mixer box operator (concrete plant); Pump operator; Spreader box (with screeds); Tar pot fire tender (power agitated) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$18.09$9.60$27.69
POWER EQUIPMENT OPERATORS:: GROUP 11-C Operator of helicopter (when used in erection work); Remote-controlled earthmoving equipment AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$24.65$9.60$34.25
POWER EQUIPMENT OPERATORS:: GROUP 9 Canal finger drain digger; Chicago boom; Combination mixer and compressor (gunite); Combination slurry mixer and/or cleaner; Highline cable (5 tons and under); Lull Hi- lift or similar (20 ft. or over); Mucking machine (rubber-tired, rail or track type); Tractor (with boom) (D-6 or larger and similar) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$21.10$9.60$30.70
POWER EQUIPMENT OPERATORS:: GROUP 8 Armor-Coater (or similar); Asphalt plant engineer; Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete batch plant (multiple units); Dozer; Heading shield operator; Heavy-duty repair and/or welder; Ken Seal machine (or similar); Kolman loader; Loader (up to 2 yds.); Mechanical trench shield; Portable crushing and screening plant; Push cat; Rubber-tired earth-moving equipment (up to and including 45 cu. yds. ""struck"" m.r.c.) (Euclids, T-Pulls, DW-10, 20, 21 and similar); Rubber-tired dozer; Self-propelled compactor with dozer; Sheepfoot; Timber skidder (rubber-tired or similar equipment); Tractor-drawn scraper; Tractor; Trenching machine; Tri-batch paver; Tunnel mole boring machine; Woods-Mixer (and other similar Pugmill equipment) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$19.76$9.60$29.36
POWER EQUIPMENT OPERATORS:: GROUP 5 Compressor operator (over 2); Concrete mixer (over 1 yd.); Concrete pump or pumpcrete gun; Generator; Grouting machine; Pressweld (air operated); Pumps (over 1); Welding machines (powered other than by electricity) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$17.60$9.60$27.20
POWER EQUIPMENT OPERATORS: GROUP 11-C Operator of helicopter (when used in erection work); Remote-controlled earthmoving equipment AREA 2 (REMAINDER OF COUNTY)$26.65$9.60$36.25
POWER EQUIPMENT OPERATORS: GROUP 11-B Loader (over 18 yds.) AREA 2 (REMAINDER OF COUNTY)$26.14$9.60$35.74
POWER EQUIPMENT OPERATORS: GROUP 11-B Loader (over 18 yds.) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$24.14$9.60$33.74
POWER EQUIPMENT OPERATORS: GROUP 11-A Band wagon (in conjunction with wheel excavator); Crane (over 125 tons); Loader (over 12 cu. yds. up to and including 18 cu. yds.); Power shovel, clamshell, backhoe, gradall and dragline (over 7 cu. yds. m.r.c.); Rubber-tired multi-purpose earthmoving machine (2 units over 75 cu. yds."struck" m.r.c.); Wheel excavator (over 750 cu. yds. per hour) AREA 2 (REMAINDER OF COUNTY)$25.71$9.60$35.31
POWER EQUIPMENT OPERATORS: GROUP 11-A Band wagon (in conjunction with wheel excavator); Crane (over 125 tons); Loader (over 12 cu. yds. up to and including 18 cu. yds.); Power shovel, clamshell, backhoe, gradall and dragline (over 7 cu. yds. m.r.c.); Rubber-tired multi-purpose earthmoving machine (2 units over 75 cu. yds. "struck" m.r.c.); Wheel excavator (over 750 cu. yds. per hour) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$21.71$9.60$31.31
POWER EQUIPMENT OPERATORS: GROUP 11 Automatic concrete slip-form paver (Gradesetter, Screed); Automatic railroad car dumper; Canal trimmer with ditching attachment; Cary-lift, Campbell or similar; Continuous flight tie back auger (crane attached, single controls); Crane (over 25 tons up to and including 125 tons); Drott travelift 650- A-1 or similar (45 tons or over); Euclid loader when controlled from the Pullcat; Highline cableway (over 5 tons); Loader (over 4 cu. yds. up to and including 12 cu. yds.); Miller formless M-900 slope paver or similar (grade setter required); Multiple engine scraper (when used as Push Pull); Power blade operator (multi- engine); Power shovel, clamshell, dragline, backhoe, gradall (over 1 cu. yd. up to and including 7 cu. yds. m.r.c., long boom pay); Rubber-tired earthmoving machine (multiple propulsion power units and two or more scrapers) (up to and including 75 cu. yds. struck m.r.c.); Self-propelled compactor boom-type lifting device (center mount) (over 25 tons m.r.c.); Single engine rubber-tired earthmoving machine (with tandem scrapers); Slip form paver (concrete or asphalt) (screed required); Tandem cat; Tower crane mobile (including rail mounted); Trencher (pulling attached shield); Tower cranes, Universal Liebher and similar types (in the erection, dismantling and moving of equipment); Wheel excavator (up to and including 750 cu. yds. per hour); Whirley crane (over 25 tons); Multi-earthmoving equipment (up to and including 75 cu. yds. ""struck"" m.r.c.); Truck-mounted hydraulic crane when remote control equipped (over 10 tons up to and including 25 tons) - AREA 2 (REMAINDER OF COUNTY)$24.91$9.60$34.51
POWER EQUIPMENT OPERATORS: GROUP 1-A Landscape irrigation trencher, Davis trencher (300 or similar and all small trenchers including all trenching equipment with seats) capacity up to 3 ft. in depth - AREA 2 (REMAINDER OF COUNTY)$15.76$9.60$25.36
POWER EQUIPMENT OPERATORS: GROUP 1-A Landscape irrigation trencher, Davis trencher (300 or similar and all small trenchers including all trenching equipment with seats) capacity up to 3 ft. in depth RANGE 14E$14.76$9.60$24.36
POWER EQUIPMENT OPERATORS: GROUP 1 Assistant to engineer (Brake; Fire tender; Heavy duty repair tender; Oiler; Deckhand; Signal; Switch; Tar pot fire tender) AREA 2 (REMAINDER OF COUNTY)$18.54$9.60$28.14
POWER EQUIPMENT OPERATORS: GROUP 11 Automatic concrete slip-form paver (Gradesetter, Screed); Automatic railroad car dumper; Canal trimmer with ditching attachment; Cary-lift, Campbell or similar; Continuous flight tie back auger (crane attached, single controls); Crane (over 25 tons up to and including 125 tons); Drott travelift 650- A-1 or similar (45 tons or over); Euclid loader when controlled from the Pullcat; Highline cableway (over 5 tons); Loader (over 4 cu. yds. up to and including 12 cu. yds.); Miller formless M-900 slope paver or similar (grade setter required); Multiple engine scraper (when used as Push Pull); Power blade operator (multi- engine); Power shovel, clamshell, dragline, backhoe, gradall (over 1 cu. yd. up to and including 7 cu. yds. m.r.c., long boom pay); Rubber-tired earthmoving machine (multiple propulsion power units and two or more scrapers) (up to and including 75 cu. yds. struck m.r.c.); Self-propelled compactor boom-type lifting device (center mount) (over 25 tons m.r.c.); Single engine rubber-tired earthmoving machine (with tandem scrapers); Slip form paver (concrete or asphalt) (screed required); Tandem cat; Tower crane mobile (including rail mounted); Trencher (pulling attached shield); Tower cranes, Universal Liebher and similar types (in the erection, dismantling and moving of equipment); Wheel excavator (up to and including 750 cu. yds. per hour); Whirley crane (over 25 tons); Multi-earthmoving equipment (up to and including 75 cu. yds. ""struck"" m.r.c.); Truck-mounted hydraulic crane when remote control equipped (over 10 tons up to and including 25 tons) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$21.91$9.60$31.51
POWER EQUIPMENT OPERATORS: GROUP 10-A Backhoe (hydraulic) (up to and including 1 cu. yd. m.r.c.); Backhoe (cable) (up to and including 1 cu. yd. m.r.c.); Combination backhoe and loader (over 3/4 cu. yd. m.r.c.); Continuous flight tie back auger (crane attached/separate controls); Crane not over 25 tons, Hammerhead and Gantry; Gradall (up to and including 1 cu. yd.); Power blade operator (single engine); Power shovel, clamshell, dragline (up to and including 1 cu. yd. m.r.c.) (long boom pay); Rubber- tired scraper, self-loading (Paddle Wheel, twin engine); Self- propelled boom-type lifting device (center mount); over 10 tons up to and including 25 tons); CMI dual land auto grader SP-30 or similar AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$21.64$9.60$31.24
POWER EQUIPMENT OPERATORS: GROUP 10-A Backhoe (hydraulic) (up to and including 1 cu. yd. m.r.c.); Backhoe (cable) (up to and including 1 cu. yd. m.r.c.); Combination backhoe and loader (over 3/4 cu. yd. m.r.c.); Continuous flight tie back auger (crane attached/separate controls); Crane not over 25 tons, Hammerhead and Gantry; Gradall (up to and including 1 cu. yd.); Power blade operator (single engine); Power shovel, clamshell, dragline (up to and including 1 cu. yd. m.r.c.) (long boom pay); Rubber- tired scraper, self-loading (Paddle Wheel, twin engine); Self- propelled boom-type lifting device (center mount); over 10 tons up to and including 25 tons); CMI dual land auto grader SP-30 or similar AREA 2 (REMAINDER OF COUNTY)$23.64$9.60$33.24
POWER EQUIPMENT OPERATORS: GROUP 10 Boom-type backfilling machine; Bridge crane; Cary- lift (or similar); Chemical grouting machine, truck-mounted; Combination backhoe and loader (up to and including 1/2 cu. yd. m.r.c.); Derrick (2 operators required when swing engine remote from hoist); Derrick barge (except excavation work); Do-mor loader; Adams elegrader; Elevating grader; Heavy rotary drill rig (including caisson foundation work and Euclid loader and similar type); Robbins type drill; Koehring Skooper (or similar); Lift slab machine (Vagtborg and similar types); Loader (2 yds. up to and including 4 yds.); Locomotive, 100 tons (single or multiple units); Multiple engine earthmoving machine (Euclids, dozers, etc.) (no tandem scraper); Pre-stress wire wrapping machine; Reservoir-debris tug (self-propelled floating); Rubber-tired scraper, self-loading (paddle wheels, etc.); Shuttle car (reclaim station); Single-engine scraper over 45 yds.; Soil stabilizer (P & H or equal); Sub-grader (Gurrier or other automatic type); Tractor, compressor drill combination; Track-laying-type earthmoving machine (single engine with tandem scrapers); Train loading station; Trenching machine, multi-engine with sloping attachment, Jeffco or similar; Vacuum cooling plant; Whirley crane (up to and including 25 tons) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$21.45$9.60$31.05
POWER EQUIPMENT OPERATORS: GROUP 10 Boom-type backfilling machine; Bridge crane; Cary- lift (or similar); Chemical grouting machine, truck-mounted; Combination backhoe and loader (up to and including 1/2 cu. yd. m.r.c.); Derrick (2 operators required when swing engine remote from hoist); Derrick barge (except excavation work); Do-mor loader; Adams elegrader; Elevating grader; Heavy rotary drill rig (including caisson foundation work and Euclid loader and similar type); Robbins type drill; Koehring Skooper (or similar); Lift slab machine (Vagtborg and similar types); Loader (2 yds. up to and including 4 yds.); Locomotive, 100 tons (single or multiple units); Multiple engine earthmoving machine (Euclids, dozers, etc.) (no tandem scraper); Pre-stress wire wrapping machine; Reservoir-debris tug (self-propelled floating); Rubber-tired scraper, self-loading (paddle wheels, etc.); Shuttle car (reclaim station); Single-engine scraper over 45 yds.; Soil stabilizer (P & H or equal); Sub-grader (Gurrier or other automatic type); Tractor, compressor drill combination; Track-laying-type earthmoving machine (single engine with tandem scrapers); Train loading station; Trenching machine, multi-engine with sloping attachment, Jeffco or similar; Vacuum cooling plant; Whirley crane (up to and including 25 tons) AREA 2 (REMAINDER OF COUNTY)$23.45$9.60$33.05
POWER EQUIPMENT OPERATORS: GROUP 9 Canal finger drain digger; Chicago boom; Combination mixer and compressor (gunite); Combination slurry mixer and/or cleaner; Highline cable (5 tons and under); Lull Hi- lift or similar (20 ft. or over); Mucking machine (rubber-tired, rail or track type); Tractor (with boom) (D-6 or larger and similar) AREA 2 (REMAINDER OF COUNTY)$23.10$9.60$32.70
POWER EQUIPMENT OPERATORS: GROUP 8 Armor-Coater (or similar); Asphalt plant engineer; Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete batch plant (multiple units); Dozer; Heading shield operator; Heavy-duty repair and/or welder; Ken Seal machine (or similar); Kolman loader; Loader (up to 2 yds.); Mechanical trench shield; Portable crushing and screening plant; Push cat; Rubber-tired earth-moving equipment (up to and including 45 cu. yds. "struck" similar); Rubber-tired dozer; Self-propelled compactor with dozer; Sheepfoot; Timber skidder (rubber-tired or similar equipment); Tractor-drawn scraper; Tractor; Trenching machine; Tri-batch paver; Tunnel mole boring machine; Woods-Mixer (and other similar Pugmill equipment) AREA 2 (REMAINDER OF COUNTY)$22.76$9.60$32.36
POWER EQUIPMENT OPERATORS: GROUP 1 Assistant to engineer (Brake; Fire tender; Heavy duty repair tender; Oiler; Deckhand; Signal; Switch; Tar pot fire tender) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$17.54$9.60$27.14
POWER EQUIPMENT OPERATORS: GROUP 7 Concrete conveyor or concrete pump, truck or equipment mounted (boom length to apply); Concrete conveyor, building site; Deck engineer; Dual drum mixer; Fuller Kenyon pump and similar types; Gantry rider (or similar); Hydra-hammer (or similar); Material hoist (2 or more drums); Mechanical finisher or spreader machine (asphalt, Barber-Greene and similar); Mine or shaft hoist; Mixermobile; Pavement breaker with or without compressor combination; Pipe bending machine (pipelines only); Pipe cleaning machine (tractor propelled and supported); Pipe wrapping machine (tractor propelled and supported); Refrigeration plant; Roller operator (finish asphalt); Self-propelled boom-type lifting device (center mount) (10 tons or less m.r.c.); Self-propelled elevating grader plane; Slusher operator; Small tractor (with boom); Soil tester; Truck- type loader; Welding machine (gasoline or diesel) AREA 2 (REMAINDER OF COUNTY)$21.08$9.60$30.68
POWER EQUIPMENT OPERATORS: GROUP 7 Concrete conveyor or concrete pump, truck or equipment mounted (boom length to apply); Concrete conveyor, building site; Deck engineer; Dual drum mixer; Fuller Kenyon pump and similar types; Gantry rider (or similar); Hydra-hammer (or similar); Material hoist (2 or more drums); Mechanical finisher or spreader machine (asphalt, Barber-Greene and similar); Mine or shaft hoist; Mixermobile; Pavement breaker with or without compressor combination; Pipe bending machine (pipelines only); Pipe cleaning machine (tractor propelled and supported); Pipe wrapping machine (tractor propelled and supported); Refrigeration plant; Roller operator (finish asphalt); Self-propelled boom-type lifting device (center mount) (10 tons or less m.r.c.); Self-propelled elevating grader plane; Slusher operator; Small tractor (with boom); Soil tester; Truck- type loader; Welding machine (gasoline or diesel) AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$19.08$9.60$28.68
POWER EQUIPMENT OPERATORS: GROUP 6 BLH Lima road pactor or similar; Boom truck or dual-purpose A-frame truck; Concrete batch plant (wet or dry); Concrete saw (self-propelled unit) on streets, highways, airports and canals; Drilling and boring machinery, vertical and horizontal (not to apply to waterliners, wagon drills or jackhammers); Gradesetter, grade checker (mechanical or otherwise); Highline cableway signal; Locomotive (steam of over 30 tons); Maginnis internal full slab vibrator (on airports, highways, canals and warehouses); Mechanical finisher (concrete) (Clary, Johnson, Bidwell Bridge deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt; Portable crusher; Post driver (M-1500 and similar); Power jumbo operator (setting slip forms, etc., in tunnels); Roller (except asphalt); Screed (Barber-Greene and similar) (asphaltic concrete paving); Self-propelled compactor (single engine); Self-propelled pipeline wrapping machine, Perault, CRC, or similar types; Slip form pump (lifting device for concrete forms); Small rubber-tired tractor; Surface heater; Self- propelled power sweeper; Self-propelled tape machine; Auger-type drilling equipment, up to and including 30 ft. depth digging capacity m.r.c. AREA 2 (REMAINDER OF COUNTY)$20.83$9.60$30.43
POWER EQUIPMENT OPERATORS: GROUP 6 BLH Lima road pactor or similar; Boom truck or dual-purpose A-frame truck; Concrete batch plant (wet or dry); Concrete saw (self-propelled unit) on streets, highways, airports and canals; Drilling and boring machinery, vertical and horizontal (not to apply to waterliners, wagon drills or jackhammers); Gradesetter, grade checker (mechanical or otherwise); Highline cableway signal; Locomotive (steam of over 30 tons); Maginnis internal full slab vibrator (on airports, highways, canals and warehouses); Mechanical finisher (concrete) (Clary, Johnson, Bidwell Bridge deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt; Portable crusher; Post driver (M-1500 and similar); Power jumbo operator (setting slip forms, etc., in tunnels); Roller (except asphalt); Screed (Barber-Greene and similar) (asphaltic concrete paving); Self-propelled compactor (single engine); Self-propelled pipeline wrapping machine, Perault, CRC, or similar types; Slip form pump (lifting device for concrete forms); Small rubber-tired tractor; Surface heater; Self- propelled power sweeper; Self-propelled tape machine; Auger-type drilling equipment, up to and including 30 ft. depth digging capacity m.r.c. AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$18.83$9.60$28.43
POWER EQUIPMENT OPERATORS: GROUP 5 Compressor operator (over 2); Concrete mixer (over 1 yd.); Concrete pump or pumpcrete gun; Generator; Grouting machine; Pressweld (air operated); Pumps (over 1); Welding machines (powered other than by electricity) AREA 2 (REMAINDER OF COUNTY)$20.60$9.60$30.20
POWER EQUIPMENT OPERATORS: GROUP 4 Ballast jack tamper; Ballast regulation; Ballast tamper multipurpose; Box (asphalt plant); Elevator operator (inside); Fork lift or lumber stacker (construction job site); Line master; Material hoist (1 drum); Shuttlecar; Tie spacer; Towermobile - AREA 2 (REMAINDER OF COUNTY$20.27$9.60$29.87
POWER EQUIPMENT OPERATORS: GROUP 4 Ballast jack tamper; Ballast regulation; Ballast tamper multipurpose; Box (asphalt plant); Elevator operator (inside); Fork lift or lumber stacker (construction job site); Line master; Material hoist (1 drum); Shuttlecar; Tie spacer; Towermobile RANGE 14E$18.27$9.60$27.87
POWER EQUIPMENT OPERATORS: GROUP 3 Box operator (bunker); Helicopter radio operator (signal); Motor operator; Locomotive (30 tons or under); Oiler; Ross Carrier (construction job site); Rotomist operator; Screed (except asphaltic concrete paving); Self-propelled, automatically applied concrete curing machine (on streets, highways, airports and canals); Trenching machine (maximum digging capacity 5 ft. depth); Tugger hoist, single drum; Truck crane oiler; Boiler tender AREA 2 (REMAINDER OF COUNTY)$19.42$9.60$29.02
POWER EQUIPMENT OPERATORS: GROUP 3 Box operator (bunker); Helicopter radio operator (signal); Motor operator; Locomotive (30 tons or under); Oiler; Ross Carrier (construction job site); Rotomist operator; Screed (except asphaltic concrete paving); Self-propelled, automatically applied concrete curing machine (on streets, highways, airports and canals); Trenching machine (maximum digging capacity 5 ft. depth); Tugger hoist, single drum; Truck crane oiler; Boiler tender AREA 1: AREA LYING WESTERLY OF THE EAST LINE OF RANGE 14E$16.42$9.60$26.02
POWER EQUIPMENT OPERATORS: GROUP 2 Compressor operator; Concrete mixer (up to and including 1 yd.); Conveyor belt operator (tunnel); Fire tender, hot plant; Hydraulic monitor; Mechanical conveyor (handling building materials); Mixer box operator (concrete plant); Pump operator; Spreader box (with screeds); Tar pot fire tender (power agitated) AREA 2 (REMAINDER OF COUNTY)$19.09$9.60$28.69
LABORERS 13 classifications · $15.02 to $19.34 total
ClassificationRateFringeTotal
LABORERS: WRECKING WORK GROUP 3 General laborer (includes all clean-up work, loading lumber, loading and burning of debris)$12.88$5.36$18.24
LABORERS: WRECKING WORK GROUP 2 Semi-skilled wrecker (salvaging of other building materials)$12.98$5.36$18.34
LABORERS: WRECKING WORK GROUP 1 Skilled wrecker (removing and salvaging of sash, windows, doors, plumbing and electric fixtures)$13.11$5.36$18.47
LABORERS: GROUP 4 Brick cleaner; Lumber cleaner$9.66$5.36$15.02
LABORERS: GROUP 3 All clean-up work of debris, grounds and buildings including but not limited to street cleaner; Cleaning and washing windows; Construction laborers including bridge and general laborer; Dump; Load spotter; Fire watcher; Street cleaner; Gardener, horticultural and landscape laborer; Jetting; Limber; Brush loader; Piler, maintenance landscape laborer on new construction; Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Fence erector; Guardrail erector; Pavement marker (button setter)$11.88$5.36$17.24
LABORERS: GROUP 2 Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and digger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Chuck tender; High pressure nozzle operator, adductor; Grout-crew; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Singlefoot, hand held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe under 12 inches$13.98$5.36$19.34
LABORERS: GROUP 1-F Wire winding machine in connection with guniting or shotcrete-aligner$13.62$5.36$18.98
LABORERS: GROUP 1-E Laborer on general construction work on or in bell hole footings and shaft$13.59$5.36$18.95
LABORERS: GROUP 1-D Repair track and road beds (cut and cover work of subway after the temporary cover has been placed)$13.36$5.36$18.72
LABORERS: GROUP 1-C Burning and welding in connection with laborers' work$13.76$5.36$19.12
LABORERS: GROUP 1-B Sewer cleaner receives an additional $4.00 per day; $5.00 per day on recently active large diameter sewers or sewer manholes$13.32$5.36$18.68
LABORERS: GROUP 1-A Joy drill model TWM-2A; Gardener-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Diamond driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Multiple unit drill; Blaster and powder; All work or loading, placing and blasting of all power and explosives of whatever type regardless of method used for such loading and placing; High scaler (including drilling of same); Tree topper; Bit grinder$13.32$5.36$18.68
LABORERS: GROUP 1 Asphalt ironer and raker; Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Chainsaw, faller, logloader and bucker; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete saw; Concrete sander; Cribber and/or shoring; Cut granite curb setter; Form raiser; Slip form; Green Cutter, headerboard, hubsetter, aligner; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactors; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials; Lagging, sheeting, whaling, bracing, trenchjacking, handguided lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); Perma curb; Precast-manhole setter; Cast-in-place manhole form setter; Pressure pipe tester; Pavement breaker and spader, including tool grinder; Pipelayer, caulker, bander, pipewrapper, conduit layer, plastic pipelayer, post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry); Rotary Scarifier, multiple head concrete chipper; Davis trencher, 300 or similar type (and all small trenchers); Roto and Ditch Witch; Roto-tiller; Sandblaster, pot, gun, nozzle operator; Signalling and rigging; Tank cleaner; Tree climber; Vibrascreed, bull float in connection with laborers' work; Vibrator; Dri-pak-it machine; High pressure blow pipe (1-1/2-inch. or over, 100 lbs. pressure and over); Hydro seeder and similar type; Laser beam in connection with laborers' work$13.31$5.36$18.67

Heavy CA20260007 rev 5

ClassificationRateFringeTotal
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 2: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHEMA, TRINITY, YOLO, & YUBA COUNTIES)$64.56$25.07$89.63
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$35.31$12.75$48.06
BOILERMAKER: (2) REMAINING COUNTIES$45.60$38.99$84.59
MARBLE FINISHER$42.06$19.80$61.86
BRICKLAYER (SPECIALTY PAY: A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE.) (AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES)$52.76$25.01$77.77
TERRAZZO FINISHER$44.93$20.98$65.91
TERRAZZO WORKER/SETTER$60.58$29.79$90.37
TILE FINISHER (AREA 2: ALPINE, AMADOR)$34.76$19.22$53.98
TILE FINISHER (AREA 4: SONOMA)$35.78$19.23$55.01
TILE LAYER (AREA 2: ALPINE, AMADOR)$55.17$22.52$77.69
TILE LAYER (AREA 4: SONOMA)$56.79$22.54$79.33
MARBLE MASON$61.72$30.31$92.03
PILEDRIVER$54.10$34.69$88.79
DRYWALL INSTALLERS/LATHERS: (AREA 3- SACARAMENTO, WESTERN EL DORADO (TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND THE TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE), WESTERN PLACER (TERRIROTY WEST OF AND INCLUDING HIGHWAY 49), AND YOLO)$47.27$31.26$78.53
DRYWALL STOCKER/SCRAPPER: (AREA 3- SACARAMENTO, WESTERN EL DORADO (TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND THE TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE), WESTERN PLACER (TERRIROTY WEST OF AND INCLUDING HIGHWAY 49), AND YOLO)$23.64$18.22$41.86
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (AMADOR COUNTY)$52.65$30.82$83.47
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (AMADOR COUNTY)$45.57$30.82$76.39
CARPENTERS: JOURNEYMAN CARPENTER. (AMADOR COUNTY)$45.42$30.82$76.24
CARPENTERS: MILLWRIGHT. (AMADOR COUNTY)$47.92$32.41$80.33
COMMUNICATIONS SYSTEM: SOUND & COMMUNICATIONS INSTALLER. (SCOPE OF WORK: INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK SYSTEMS. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS: BACKGROUND FOREGROUND MUSIC INTERCOM AND TELEPHONE INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS, NURSE CALL SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE ALARM SYSTEMS: INSTALLATION, WIRE PULLING AND TESTING C. TELEVISION AND VIDEO SYSTEMS: TELEVISION MONITORING AND SURVEILLANCE SYSTEMS, VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY SYSTEMS: PERIMETER SECURITY SYSTEMS, VIBRATION SENSOR SYSTEMS, CARD ACCESS SYSTEMS, ACCESS CONTROL SYSTEMS, SONAR/INFRARED MONITORING EQUIPMENT E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS: SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION), PCM (PULSE CODE MODULATION), INVENTORY CONTROL SYSTEMS, DIGITAL DATA SYSTEMS, BROADBAND AND BASEBAND AND CARRIERS, POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS, DATA COMMUNICATION SYSTEMS, RF AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA SYSTEMS. WORK EXCLUDED: RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT. (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES)$40.00$25.50$65.50
COMMUNICATIONS SYSTEM: SOUND & COMMUNICATIONS TECHNICIAN. (SCOPE OF WORK: INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK SYSTEMS. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS: BACKGROUND FOREGROUND MUSIC INTERCOM AND TELEPHONE INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS, NURSE CALL SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE ALARM SYSTEMS: INSTALLATION, WIRE PULLING AND TESTING C. TELEVISION AND VIDEO SYSTEMS: TELEVISION MONITORING AND SURVEILLANCE SYSTEMS, VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY SYSTEMS: PERIMETER SECURITY SYSTEMS, VIBRATION SENSOR SYSTEMS, CARD ACCESS SYSTEMS, ACCESS CONTROL SYSTEMS, SONAR/INFRARED MONITORING EQUIPMENT E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS: SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION), PCM (PULSE CODE MODULATION), INVENTORY CONTROL SYSTEMS, DIGITAL DATA SYSTEMS, BROADBAND AND BASEBAND AND CARRIERS, POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS, DATA COMMUNICATION SYSTEMS, RF AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA SYSTEMS. WORK EXCLUDED: RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT. (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES)$46.00$25.68$71.68
ELECTRICIAN (REMAINING AREA) (CABLE SPLICER: RECEIVES 110% OF THE ELECTRICIAN BASIC HOURLY RATE.) (ALPINE (WEST OF SIERRA MT. WATERSHED), AMADOR, BUTTE, COLUSA, EL DORADO (WEST OF SIERRA MT. WATERSHED), GLENN, LASSEN, NEVADA (WEST OF SIERRA MT. WATERSHED), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF SIERRA MT. WATERSHED), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES)$52.70$38.68$91.38
ELECTRICIAN (SIERRA ARMY DEPOT, HERLONG) (CABLE SPLICER: RECEIVES 110% OF THE ELECTRICIAN BASIC HOURLY RATE.) (ALPINE (WEST OF SIERRA MT. WATERSHED), AMADOR, BUTTE, COLUSA, EL DORADO (WEST OF SIERRA MT. WATERSHED), GLENN, LASSEN, NEVADA (WEST OF SIERRA MT. WATERSHED), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF SIERRA MT. WATERSHED), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES)$48.83$18.54$67.37
ELECTRICIAN (TUNNEL WORK) (CABLE SPLICER: RECEIVES 110% OF THE ELECTRICIAN BASIC HOURLY RATE.) (ALPINE (WEST OF SIERRA MT. WATERSHED), AMADOR, BUTTE, COLUSA, EL DORADO (WEST OF SIERRA MT. WATERSHED), GLENN, LASSEN, NEVADA (WEST OF SIERRA MT. WATERSHED), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF SIERRA MT. WATERSHED), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES)$41.01$18.54$59.55
ELEVATOR MECHANIC ($84.05$38.44$122.49
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (1) LEVERMAN (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$62.61$39.55$102.16
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: REMAINDER. PLACER COUNTY: AREA 1: ALL BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. SISKIYOU COUNTY: AREA 1: CENTRAL PART, AREA 2: REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$57.65$39.55$97.20
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$56.53$39.55$96.08
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: REMAINDER. PLACER COUNTY: AREA 1: ALL BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. SISKIYOU COUNTY: AREA 1: CENTRAL PART, AREA 2: REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$53.23$39.55$92.78
IRONWORKER (AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, MARIN, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SOLANO, SONOMA, SUTTER, TEHAMA, YOLO, AND YUBA COUNTIES)$50.70$35.15$85.85
LABORER, ASBESTOS/MOLD/LEAD LABORER: MARIN AND NAPA COUNTIES$37.75$29.69$67.44
LABORER, ASBESTOS/MOLD/LEAD LABORER: REMAINING COUNTIES$36.75$29.69$66.44
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (AREA B: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE, EL DORADO, FRESNO, FLENN, HUMBOLDT, KINGS, LAKE, LASSEN, MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NEVADA, PALCER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, SIERRA, SHASTA, SISKIYOU, STANISLAUS, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO, AND YUBA COUNTIES)$36.26$27.32$63.58
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I (AREA B: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE, EL DORADO, FRESNO, FLENN, HUMBOLDT, KINGS, LAKE, LASSEN, MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NEVADA, PALCER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, SIERRA, SHASTA, SISKIYOU, STANISLAUS, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO, AND YUBA COUNTIES)$36.56$27.32$63.88
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II (AREA B: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE, EL DORADO, FRESNO, FLENN, HUMBOLDT, KINGS, LAKE, LASSEN, MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NEVADA, PALCER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, SIERRA, SHASTA, SISKIYOU, STANISLAUS, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO, AND YUBA COUNTIES)$34.06$27.32$61.38
TUNNEL AND SHAFT LABORERS: GROUP 2: RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL). (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$45.66$27.72$73.38
TUNNEL AND SHAFT LABORERS: GROUP 3: BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE. (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$45.41$27.72$73.13
TUNNEL AND SHAFT LABORERS: GROUP 4: VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD). (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$44.96$27.72$72.68
TUNNEL AND SHAFT LABORERS: GROUP 5: GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN. (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$44.42$27.72$72.14
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES$46.41$27.72$74.13
LABORER, WRECKING - GROUP 2: SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). ($35.35$27.30$62.65
PLASTERER TENDER (WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL.)$39.77$28.54$68.31
LABORER, WRECKING - GROUP 2: SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). ($36.35$27.30$63.65
PLASTERER TENDER (WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL.)$39.77$28.54$68.31
LABORER, WRECKING - GROUP 2: SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). ($35.35$27.30$62.65
PLASTERER TENDER (WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL.)$39.77$28.54$68.31
PAINTERS (SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR.) (ALPINE, AMADOR, BUTTE, COLUSA. EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS), GLENN, LASSEN (WEST OF HIGHWAY 395, EXCLUDING HONEY LAKE), MODOC, NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS), PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS), PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS), SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES)$43.45$22.80$66.25
PAINTERS: BRUSH AND ROLLER (PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR. SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR. SPECIAL COATING SPRAY STEEL = $1.25/HR. SWING STAGE = $2.00/HR$39.43$16.16$55.59
PAINTERS: PAPERHANGER (PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR. SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR. SPECIAL COATING SPRAY STEEL = $1.25/HR. SWING STAGE = $2.00/HR$42.19$16.16$58.35
PAINTERS: SPRAY PAINTER (PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR. SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR. SPECIAL COATING SPRAY STEEL = $1.25/HR. SWING STAGE = $2.00/HR$41.43$16.16$57.59
GLAZIER (PAID HOLIDYAS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDETN'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY) (EMPLOYEE REQUIRED TO WEAR A BODY HARNESS SHALL RECEIVE $1.50 PER HOUR ABOVE THE BASIC HOURLY RATE AT ANY ELEVATION) (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO (REMAINDER), SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)$43.25$35.62$78.87
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 - GAMECOURT & PLAYGROUND INSTALLER$34.71$17.62$52.33
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 - STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS$40.83$17.62$58.45
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 - PROTECTIVE COATING, PAVEMENT SEALING$35.11$17.62$52.73
PLASTERER (AREA 295: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SUTTER, TEHEMA, TRINITY, YOLO & YUBA COUNTIES)$32.70$31.68$64.38
PLASTERER (AREA 355: MARIN)$36.73$31.68$68.41
CEMENT MASON/CONCRETE FINISHER$32.15$23.27$55.42
PLUMBER/PIPEFITTER: ALL OTHER WORK ($71.60$38.38$109.98
PLUMBER/PIPEFITTER: LIGHT COMMERCIAL (DEFINITION OF LIGHT COMMERCIAL: WORK SHALL INCLUDE STRIP SHOPPING CENTERS, OFFICE BUILDINGS, SCHOOLS, AND OTHER COMMERCIAL STRUCTURES WHICH THE TOTAL PLUMBING BID DOES NOT EXCEED $250,000 AND THE TOTAL HEATING AND COOLING DOES NOT EXCEED $250,000; OR ANY PROJECTS BID IN PHASES SHALL NOT QUALIFY UNLESS THE TOTAL PROJECT IS LESS THAN $250,000 FOR THE PLUMBING BID; AND $250,000 FOR THE HEATING AND COOLING BID. EXCLUDED ARE HOSPITALS, JAILS, INSTITUTIONS AND INDUSTRIAL PROJECTS, REGARDLESS OF SIZE OF THE PROJECT) ($30.85$20.40$51.25
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$36.01$18.50$54.51
PLUMBER (AMADOR (SOUTH OF SAN JOAQUIN RIVER) AND ALPINE COUNTIES)$58.45$38.74$97.19
PLUMBER/PIPEFITTER: JOURNEYMAN (AMADOR (NORTH OF SAN JOAQUIN RIVER), EL DORADO (EXCLUDING LAKE TAHOE AREA), NEVADA (EXCLUDING LAKE TAHOE AREA); PLACER (EXCLUDING LAKE TAHOE AREA), SACRAMENTO, AND YOLO COUNTIES)$67.37$30.00$97.37
PLUMBER/PIPEFITTER: LIGHT COMMERCIAL WORK (AMADOR (NORTH OF SAN JOAQUIN RIVER), EL DORADO (EXCLUDING LAKE TAHOE AREA), NEVADA (EXCLUDING LAKE TAHOE AREA); PLACER (EXCLUDING LAKE TAHOE AREA), SACRAMENTO, AND YOLO COUNTIES)$55.58$24.02$79.60
SHEET METAL WORKER (AMADOR, COLUSA, EL DORADO, NEVADA, PLACER, SACRAMENTO, SUTTER, YOLO, AND YUBA COUNTIES)$59.82$41.52$101.34
TRUCK DRIVERS: GROUP 1 - DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES) ($43.26$34.28$77.54
TRUCK DRIVERS: GROUP 2 - DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND "A" FRAME DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED TRACTOR ($43.56$34.28$77.84
TRUCK DRIVERS: GROUP 3 - DUMP TRUCKS, 8 YDS. AND INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.; WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY TRANSPORT TILLER PERSON; SELF- PROPELLED STREET SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK - HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON AND ROAD OILER; DRY DISTRIBUTION TRUCK (A BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW ($43.86$34.28$78.14
TRUCK DRIVERS: GROUP 4 - DUMP TRUCKS, OVER 25 YDS. AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS (WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND TRUCK REPAIRMAN ($44.21$34.28$78.49
TRUCK DRIVERS: GROUP 5 - DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES ($44.56$34.28$78.84
DIVER 6 classifications · $88.79 to $138.31 total
ClassificationRateFringeTotal
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN. (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$54.10$34.69$88.79
DIVER: DIVER STANDBY. (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$60.51$34.69$95.20
DIVER: DIVER TENDER. (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$59.51$34.69$94.20
DIVER: DIVER WET. (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$103.62$34.69$138.31
DIVER: MANIFOLD OPERATOR (MIXED GAS). (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$64.51$34.69$99.20
DIVER: MANIFOLD OPERATOR (STANDBY). (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$59.51$34.69$94.20
OPERATOR 52 classifications · $73.65 to $101.34 total
ClassificationRateFringeTotal
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 - LANDSCAPE FINISH GRADE OPERATOR: ALL FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. CALAVERAS COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. FRESNO COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. MADERA COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART, AREA 2: SOUTHWESTERN PART. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART.)$57.85$28.56$86.41
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 - LANDSCAPE OPERATOR UP TO 65 HP; ALL EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP 3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S RATING IS 65 HP OR LESS; A-FRAME AND WINCH TRUCK, BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE, ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER 31 HP UP TO 65 HP. (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: AREA 2: EASTERN PART. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. ELDORADO COUNTY: FRESNO COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. MADERA COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. AREA 2: EASTERN PART. MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART, AREA 2: SOUTHWESTERN PART. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART.)$54.25$28.56$82.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 - LANDSCAPE UTILITY OPERATOR; SMALL RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. CALAVERAS COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. FRESNO COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. MADERA COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART, AREA 2: SOUTHWESTERN PART. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART.)$49.64$28.56$78.20
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 1 (Lifting devices) - DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 TONS. ($52.64$31.15$83.79
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 1 (Oiler) - DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 TONS. ($43.38$31.15$74.53
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 1 (Truck Crane Oiler) - DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 TONS. ($45.66$31.15$76.81
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 2 (Lifting devices) - DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AN INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE RIG. ($50.82$31.15$81.97
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 2 (Oiler) - DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AN INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE RIG. ($43.11$31.15$74.26
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 2 (Truck Crane Oiler) - DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AN INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE RIG. ($45.41$31.15$76.56
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 3 (Lifting devices) - DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 TONS AND UNDER. ($49.14$31.15$80.29
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 3 (Oiler) - DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 TONS AND UNDER. ($42.89$31.15$74.04
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 3 (Truck Crane Oiler) - DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 TONS AND UNDER. ($45.12$31.15$76.27
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 4 (Lifting devices) - ASSISTANT OPERATOR IN LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIRPERSON/WELDER ($47.37$31.15$78.52
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 5 (Lifting devices) - DECK ENGINEER ($44.73$31.15$75.88
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 6 (Lifting devices) - DECKHAND; FIRE TENDER ($42.50$31.15$73.65
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1 - OPERATOR OF HELICOPTER (WHEN USED IN ERECTION WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; POWER SHOVELS, OVER 7 CU. YDS. ($66.96$32.53$99.49
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2 - HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3-1/2 CU. YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR (FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS. M.R.C. ($65.43$32.53$97.96
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3 - ASPHALT MILLING MACHING; CABLE BACKHOE; COMBINATION BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE BACK MACHINE ASSISTANT TO ENGINEER OR MECHANIC; CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK MACHINE, TONNAGE TO APPLY; CRANE MOUNTED DRILL ATTACHMENT, TONNAGE TO APPLY; DOZER, SLOPE BRD; GRADALL; HYDRAULIC EXCAVATOR, UP TO 3 1/2 CU. YDS.; LOADER 4 CU. YDS. AND OVER; LONG REACH EXCAVATOR; MULTIPLE ENGINE SCRAPER (WHEN USED AS PUSH PULL); POWER SHOVELS, UP TO AND INCLUDING 1 CU. YD.; PRE-STRESS WIRE WRAPPING MACHINE; SIDE BOOM CAT, 572 OR LARGER; TRACK LOADER 4 CU. YDS. AND OVER; WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR). ($63.95$32.53$96.48
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4 - ASPHALT PLANT ENGINEER/BOX PERSON; CHICAGO BOOM; COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING 3/4 CU. YD.; CONCRETE BATCH PLANT (WET AND DRY); DOZER AND/OR PUSH CAT; PULL-TYPE ELEVATING LOADER; GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT, HUGHES, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY REPAIRPERSON AND/OR WELDER; LIME SPREADER; LODER UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER (MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR SPREADER MACHINE (ASPHALT, BARBER-GREENE AND SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR SIMILAR ;PORTABLE CRUSHING ANDS CREENING PLANTS; POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT; RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE WHEELS, ETC.); RUBBER-TIRED EARTHMOVING EQUIPMENT (SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL TRACTOR WITH DRAG; SOIL STABILIZER (P&H OR EQUAL); SPIDER PLOW AND SPIDER PULLER; TUBEX PILE RIG; UNLICENSED CONSTRUCTION WORK BOAT OPERATOR, ON SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.; TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR PUGMILL EQUIPMENT) ($62.57$32.53$95.10
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5 - CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE) (CLARY, JOHNSON, BIDWELL BRIDGE DECK OR SIMILAR TYPES); MECHANICAL BURM, CURB AND/OR CURB AND GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR (SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED (AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5 FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR. ($61.30$32.53$93.83
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6 - ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER; BOOM-TYPE BACKFILLING MACHINE; ASSISTANT PLANT ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); DECK ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHES 200 SERIES OR SIMILAR UP TO AND INCLUDING 30 FT. M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR; HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR (WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR SIMILAR; OILER, TRUCK MOUNTED EQUIPMENT; PAVEMENT BREAKER, TRUCK-MOUNTED, WITH COMPRESSOR COMBINATION; PAVING FABRIC INSTALLATION AND/OR LAYING MACHINE; PIPE BENDING MACHINE (PIPELINES ONLY); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND SUPPORTED); SCREED (EXCEPT ASPHALTIC CONCRETE PAVING); SELF-PROPELLED PIPELINE WRAPPING MACHINE; TRACTOR; SELF-LOADING CHIPPER; CONCRETE BARRIER MOVING MACHINE. ($59.98$32.53$92.51
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7 - BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR SIMILAR; COMBINATION SLURRY MIXER AND/OR CLEANER; DRILLING EQUIPMENT, 20 FT. AND UNDER M.R.C.; FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR; HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE (VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM); MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER (WITH OR WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL; SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE CURING MACHINE (ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER); SIGNAL PERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR CONCRETE FORMS); TIE SPACER; TOWER MOBILE; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY UP TO AND INCLUDING 5 FT. DEPTH; TRUCK-TYPE LOADER. ($58.84$32.53$91.37
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8 - BIT SHARPENER; BOILER TENDER; BOX OPERATOR; BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR (SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND; FIRE TENDER; FORKLIFT (UNDER 20 FT.); GENERATOR; GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC MONITOR; KEN SEAL MACHINE (OR SIMILAR); MIXERMOBILE; OILER; PUMP OPERATOR; REFRIGERATION PLANT;RESERVOIR-DEBRIS TUG (SELF-PROPELLED FLOATING); ROSS CARRIER (CONSTRUCTION SITE); ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE; SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR (INCLUDES VACUUM SWEEPER); SLUSHER OPERATOR; SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER; TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT; WELDING MACHIEN (POWERED OTHER THAN BY ELECTRICITY). ($57.70$32.53$90.23
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A - ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 SERIES OR SMALLER, AND SIMILAR (WITHOUT ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P. (BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER. ($55.49$32.53$88.02
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (CRANES) - CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. ($68.59$32.53$101.12
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (OILER) - CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. ($43.79$31.15$74.94
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (TRUCK CRANE OILER) - CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. ($46.08$31.15$77.23
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (CRANES) - CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE. ($66.08$32.53$98.61
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (OILER) - CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE. ($42.83$31.15$73.98
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (TRUCK CRANE OILER) - CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE. ($45.07$31.15$76.22
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (CRANES) - CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. ($64.34$32.53$96.87
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (HYDRAULIC) - CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. ($60.61$32.53$93.14
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (OILER) - CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. ($42.55$31.15$73.70
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (TRUCK CRANE OILER) - CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. ($44.83$31.15$75.98
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 4 (CRANES)- BOOM TRUCK OR DUAL PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) - UNDER 15 TONS. ($61.30$32.53$93.83
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 1 - CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS ($68.81$32.53$101.34
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 2 - CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE. ($67.04$32.53$99.57
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 3 - CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER. ($65.56$32.53$98.09
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 4 - CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER ($63.54$32.53$96.07
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 5 - BOOM CAT. ($62.24$32.53$94.77
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 1 - HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE (RUBER TIRED, RAIL OR TRACK TYPE); RAISED BORE OPERATOR (TUNNELS); TUNNEL MOLE BORE OPERATOR. ($63.06$32.53$95.59
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 1-A - TUNNEL BORE MACHINE OPERATOR; 20; DIAMETER OR MORE ($65.53$32.53$98.06
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 2 - COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN; POWER JUMBO OPERATOR. ($61.80$32.53$94.33
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 3 - DRILL DOCTOR; MINE OR SHAFT HOIST. ($60.47$32.53$93.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 4 - COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR; MOTORMAN. ($59.33$32.53$91.86
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 5 - BIT SHARPENTER; BRAKEMAN; COMBINATION MIXER AND COMPRESSOR (GUNITE); COMPRESSOR OPERATOR; OILER; PUMP OPERATOR; SLUSHER OPERATOR. ($58.19$32.53$90.72
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 1 - HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE (RUBER TIRED, RAIL OR TRACK TYPE); RAISED BORE OPERATOR (TUNNELS); TUNNEL MOLE BORE OPERATOR. ($62.96$32.53$95.49
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 1-A - TUNNEL BORE MACHINE OPERATOR; 20; DIAMETER OR MORE. ($65.43$32.53$97.96
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 2 - COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN; POWER JUMBO OPERATOR. ($61.70$32.53$94.23
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 3 - DRILL DOCTOR; MINE OR SHAFT HOIST. ($60.37$32.53$92.90
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 4 - COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR; MOTORMAN. ($59.23$32.53$91.76
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 5 - BIT SHARPENTER; BRAKEMAN; COMBINATION MIXER AND COMPRESSOR (GUNITE); COMPRESSOR OPERATOR; OILER; PUMP OPERATOR; SLUSHER OPERATOR. ($58.09$32.53$90.62
LABORER 46 classifications · $53.57 to $64.76 total
ClassificationRateFringeTotal
LABORER: MASON TENDER-BRICK (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$36.29$25.55$61.84
LABORER: CONSTRUCTION CRAFT LABORERS - CONSTRUCTION SPECIALIST GROUP: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL. ($36.20$27.30$63.50
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER. ($35.50$27.30$62.80
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. (SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. "SEWER CLEANER" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES.) (MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED.) (AREA B: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)$35.72$27.30$63.02
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. ($35.55$27.30$62.85
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. ($36.05$27.30$63.35
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. ($30.37$23.20$53.57
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES. ($35.35$27.30$62.65
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY). ($35.25$27.30$62.55
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION". ($28.94$27.30$56.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - ESTABLISHED WARRANTY PERIOD. (AREA B: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)$28.94$27.30$56.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - NEW CONSTRUCTION (AREA B: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)$35.25$27.30$62.55
LABORER: GUNITE - GROUP 1: STRUCTURAL NOZZLEMAN. ($36.46$27.30$63.76
LABORER: GUNITE - GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. ($35.96$27.30$63.26
LABORER: GUNITE - GROUP 3: REBOUNDMAN ($35.37$27.30$62.67
LABORER: GUNITE - GROUP 4: GUNITE LABORER ($35.25$27.30$62.55
LABORER: WRECKING - GROUP 1: SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS AND MATERIALS). ($35.50$27.30$62.80
LABORER: CONSTRUCTION CRAFT LABORERS - CONSTRUCTION SPECIALIST GROUP: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL. ($37.20$27.30$64.50
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER. ($36.50$27.30$63.80
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. (SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. "SEWER CLEANER" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES.) (MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED.) (AREA A: MARIN COUNTY)$36.72$27.30$64.02
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. ($36.55$27.30$63.85
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. ($37.05$27.30$64.35
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. ($31.37$23.20$54.57
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES. ($36.35$27.30$63.65
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY). ($36.25$27.30$63.55
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION". ($29.94$27.30$57.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - ESTABLISHED WARRANTY PERIOD. (AREA A: MARIN COUNTY)$29.94$27.30$57.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - NEW CONSTRUCTION (AREA A: MARIN COUNTY)$36.25$27.30$63.55
LABORER: GUNITE - GROUP 1: STRUCTURAL NOZZLEMAN. ($37.46$27.30$64.76
LABORER: GUNITE - GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. ($36.96$27.30$64.26
LABORER: GUNITE - GROUP 3: REBOUNDMAN ($36.37$27.30$63.67
LABORER: GUNITE - GROUP 4: GUNITE LABORER ($36.25$27.30$63.55
LABORER: WRECKING - GROUP 1: SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS AND MATERIALS). ($36.50$27.30$63.80
LABORER: CONSTRUCTION CRAFT LABORERS - CONSTRUCTION SPECIALIST GROUP: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL. ($36.20$27.30$63.50
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER. ($35.50$27.30$62.80
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. ($35.55$27.30$62.85
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. ($36.05$27.30$63.35
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. ($36.08$27.30$63.38
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES. ($35.35$27.30$62.65
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY). ($35.25$27.30$62.55
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION". ($28.94$27.30$56.24
LABORER: GUNITE - GROUP 1: STRUCTURAL NOZZLEMAN. ($36.46$27.30$63.76
LABORER: GUNITE - GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. ($35.96$27.30$63.26
LABORER: GUNITE - GROUP 3: REBOUNDMAN ($35.37$27.30$62.67
LABORER: GUNITE - GROUP 4: GUNITE LABORER ($35.25$27.30$62.55
LABORER: WRECKING - GROUP 1: SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS AND MATERIALS). ($35.50$27.30$62.80
Scoped to other counties 123 classifications in CA20260007 that name counties other than Amador
ClassificationRateFringeTotal
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 1: MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$84.76$25.07$109.83
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2: MARIN AND NAPA COUNTIES)$44.73$12.75$57.48
BOILERMAKER: (1) MARIN & SOLANO COUNTIES$49.62$41.27$90.89
BRICKLAYER (SPECIALTY PAY: A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE.) (AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA, AND TRINITY COUNTIES)$57.02$28.50$85.52
TILE FINISHER (AREA 1: BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO, YUBA)$35.00$17.44$52.44
TILE FINISHER (AREA 3: MARIN, NAPA, SOLANO, SISKIYOU)$37.75$19.28$57.03
TILE LAYER (AREA 1: BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO, YUBA)$55.55$21.08$76.63
TILE LAYER (AREA 3: MARIN, NAPA, SOLANO, SISKIYOU)$59.92$22.62$82.54
DRYWALL INSTALLERS/LATHERS: (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA)$52.65$31.26$83.91
DRYWALL INSTALLERS/LATHERS: (AREA 4- ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN, LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, AND YUBA)$45.92$31.26$77.18
DRYWALL STOCKER/SCRAPPER: (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA)$26.33$18.22$44.55
DRYWALL STOCKER/SCRAPPER: (AREA 4- ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN, LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, AND YUBA)$22.97$18.22$41.19
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER (MARIN COUNTY)$52.65$30.82$83.47
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (MARIN COUNTY)$52.80$30.82$83.62
CARPENTER: JOURNEYMAN CARPENTER (MARIN COUNTY)$52.65$30.82$83.47
CARPENTER: MILLWRIGHT (MARIN COUNTY)$52.75$32.41$85.16
INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$28.76$22.53$51.29
INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 2- MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)$26.11$22.53$48.64
INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 3- ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$25.16$22.53$47.69
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$32.21$23.03$55.24
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 2- MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)$29.08$23.03$52.11
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 3- ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$27.96$23.03$50.99
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$36.43$23.03$59.46
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 2- MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)$32.71$23.03$55.74
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 3- ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$31.38$23.03$54.41
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES$60.39$33.52$93.91
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES$54.66$33.52$88.18
CARPENTERS: JOURNEYMAN CARPENTER. (EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE.)$54.51$33.52$88.03
CARPENTERS: MILLWRIGHT. (EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES$57.01$35.11$92.12
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES)$60.39$33.52$93.91
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES)$53.31$33.52$86.83
CARPENTERS: JOURNEYMAN CARPENTER. (ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES)$53.16$33.52$86.68
CARPENTERS: MILLWRIGHT. (ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES)$55.66$35.11$90.77
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (SOLANO COUNTY)$54.85$31.49$86.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (SOLANO COUNTY)$55.00$31.49$86.49
CARPENTERS: JOURNEYMAN CARPENTER. (SOLANO COUNTY)$54.85$31.49$86.34
CARPENTERS: MILLWRIGHT. (SOLANO COUNTY)$54.95$33.08$88.03
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (NAPA AND SONOMA COUNTIES)$54.85$31.49$86.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (NAPA AND SONOMA COUNTIES)$55.00$31.49$86.49
CARPENTERS: JOURNEYMAN CARPENTER. (NAPA AND SONOMA COUNTIES)$54.85$31.49$86.34
CARPENTERS: MILLWRIGHT. (NAPA AND SONOMA COUNTIES)$54.95$33.08$88.03
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES)$52.65$30.82$83.47
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES)$45.57$30.82$76.39
CARPENTERS: JOURNEYMAN CARPENTER. (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES)$45.42$30.82$76.24
CARPENTERS: MILLWRIGHT. (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES)$47.92$32.41$80.33
CABLE SPLICER. (NAPA AND SOLANO COUNTIES)$69.26$31.36$100.62
ELECTRICIAN. (NAPA AND SOLANO COUNTIES)$61.56$31.13$92.69
SOUND & COMMUNICATIONS: INSTALLER. (SCOPE OF WORK INCLUDES - SOUND & VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL, TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE. EXCLUDES ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDES ENERGY MANAGEMENT SYSTEMS.) (NAPA AND SOLANO COUNTIES)$53.08$30.84$83.92
SOUND & COMMUNICATIONS: TECHNICIAN. (SCOPE OF WORK INCLUDES - SOUND & VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL, TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE. EXCLUDES ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDES ENERGY MANAGEMENT SYSTEMS.) (NAPA AND SOLANO COUNTIES)$61.04$31.08$92.12
ELECTRICIAN (ZONE RATE: 70-90 MILES, $10.00 PER HOUR. 91+ MILES, $15.00 PER HOUR) (ALPINE (EAST OF THE MAIN WATERSHED DIVIDE), EL DORADO (EAST OF THE MAIN WATERSHED DIVIDE), NEVADA (EAST OF THE MAIN WATERSHED), PLACER (EAST OF THE MAIN WATERSHED DIVIDE) AND SIERRA (EAST OF THE MAIN WATERSHED DIVIDE) COUNTIES)$48.50$23.04$71.54
ELECTRICIAN (MARIN AND SONOMA COUNTIES)$59.17$32.04$91.21
SOUND & COMMUNICATIONS: INSTALLER. (SCOPE OF WORK INCLUDES - SOUND & VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL, TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE. EXCLUDES ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDES ENERGY MANAGEMENT SYSTEMS.) (MARIN & SONOMA COUNTIES)$53.08$30.84$83.92
SOUND & COMMUNICATIONS: TECHNICIAN. (SCOPE OF WORK INCLUDES - SOUND & VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL, TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE. EXCLUDES ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDES ENERGY MANAGEMENT SYSTEMS.) (MARIN & SONOMA COUNTIES)$61.04$31.08$92.12
ELECTRICIAN (MODOC AND SISKIYOU COUNTIES)$47.04$21.84$68.88
LINE CONSTRUCTION: (1) CABLE SPLICER (DEL NORTE, MODOC & SISKIYOU COUNTIES)$67.80$25.20$93.00
LINE CONSTRUCTION: (2) LINEMAN, POLE SPRAYER, HEAVY LINE EQUIPMENT MAN (DEL NORTE, MODOC & SISKIYOU COUNTIES)$60.54$24.87$85.41
LINE CONSTRUCTION: (3) TREE TRIMMER (DEL NORTE, MODOC & SISKIYOU COUNTIES)$37.84$16.00$53.84
LINE CONSTRUCTION: (4) LINE EQUIPMENT MAN (DEL NORTE, MODOC & SISKIYOU COUNTIES)$53.82$21.82$75.64
LINE CONSTRUCTION: (5) POWDERMEN, JACKHAMMERMEN (DEL NORTE, MODOC & SISKIYOU COUNTIES)$40.37$16.12$56.49
LINE CONSTRUCTION: (6) GROUNDMAN (DEL NORTE, MODOC & SISKIYOU COUNTIES)$33.37$15.80$49.17
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY) (ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU)$70.16$24.71$94.87
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY) (ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU)$53.30$22.26$75.56
LINE CONSTRUCTION: (3) GROUNDMAN (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY) (ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU)$40.76$21.76$62.52
LINE CONSTRUCTION: (4) POWDERMAN (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY) (ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU)$51.87$18.79$70.66
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (1) LEVERMAN (AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$60.61$39.55$100.16
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN (AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: REMAINDER. PLACER COUNTY: AREA 1: ALL BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. SISKIYOU COUNTY: AREA 1: CENTRAL PART, AREA 2: REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$55.65$39.55$95.20
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR (AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: REMAINDER. PLACER COUNTY: AREA 1: ALL BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. SISKIYOU COUNTY: AREA 1: CENTRAL PART, AREA 2: REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$54.53$39.55$94.08
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER (AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$51.23$39.55$90.78
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 - LANDSCAPE FINISH GRADE OPERATOR: ALL FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA DEFINITIONS - AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$55.85$28.56$84.41
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 - LANDSCAPE OPERATOR UP TO 65 HP; ALL EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP 3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S RATING IS 65 HP OR LESS; A-FRAME AND WINCH TRUCK, BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE, ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER 31 HP UP TO 65 HP. (AREA DEFINITIONS - AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$52.25$28.56$80.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 - LANDSCAPE UTILITY OPERATOR; SMALL RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA DEFINITIONS - AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$47.64$28.56$76.20
IRONWORKER (ALPINE, LASSEN, MODOC, SISKIYOU, AND TRINITY COUNTIES)$43.75$34.45$78.20
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (AREA A: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES)$37.26$27.32$64.58
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I (AREA A: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES)$37.56$27.32$64.88
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II (AREA A: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES)$35.06$27.32$62.38
TUNNEL AND SHAFT LABORERS: GROUP 1: DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN. LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)$45.89$27.72$73.61
LABORER: TRAFFIC CONTROL/LANE CLOSURE - ESCORT DRIVER, FLAG PERSON (MARIN COUNTY)$37.26$27.30$64.56
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON I - LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (MARIN COUNTY)$37.56$27.30$64.86
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON II - INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (MARIN COUNTY)$35.06$27.30$62.36
TUNNEL AND SHAFT LABORERS: GROUP 1 - DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (MARIN COUNTY)$45.89$27.72$73.61
TUNNEL AND SHAFT LABORERS: GROUP 2 - RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (MARIN COUNTY)$45.66$27.72$73.38
TUNNEL AND SHAFT LABORERS: GROUP 3 - BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (MARIN COUNTY)$45.41$27.72$73.13
TUNNEL AND SHAFT LABORERS: GROUP 4 - VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (MARIN COUNTY)$44.96$27.72$72.68
TUNNEL AND SHAFT LABORERS: GROUP 5 - GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (MARIN COUNTY)$44.42$27.72$72.14
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (MARIN COUNTY)$46.41$27.72$74.13
LABORER: MASON TENDER-BRICK (MARIN COUNTY)$37.54$25.55$63.09
LABORER: TRAFFIC CONTROL/LANE CLOSURE - ESCORT DRIVER, FLAG PERSON (NAPA, SOLANO, AND SONOMA COUNTIES)$36.26$27.30$63.56
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON I - LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (NAPA, SOLANO, AND SONOMA COUNTIES)$36.56$27.30$63.86
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON II - INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (NAPA, SOLANO, AND SONOMA COUNTIES)$34.06$27.30$61.36
TUNNEL AND SHAFT LABORERS: GROUP 1 - DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (NAPA, SOLANO, AND SONOMA COUNTIES)$45.89$27.72$73.61
TUNNEL AND SHAFT LABORERS: GROUP 2 - RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (NAPA, SOLANO, AND SONOMA COUNTIES)$45.66$27.72$73.38
TUNNEL AND SHAFT LABORERS: GROUP 3 - BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (NAPA, SOLANO, AND SONOMA COUNTIES)$45.41$27.72$73.13
TUNNEL AND SHAFT LABORERS: GROUP 4 - VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (NAPA, SOLANO, AND SONOMA COUNTIES)$44.96$27.72$72.68
TUNNEL AND SHAFT LABORERS: GROUP 5 - GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (NAPA, SOLANO, AND SONOMA COUNTIES)$44.42$27.72$72.14
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (NAPA, SOLANO, AND SONOMA COUNTIES)$46.41$27.72$74.13
LABORER: MASON TENDER-BRICK (SOLANO AND SONOMA COUNTIES)$36.84$26.24$63.08
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. (SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. "SEWER CLEANER" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES.) (MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED.) (AREA B: NAPA, SOLANO, AND SONOMA COUNTIES)$35.72$27.30$63.02
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - ESTABLISHED WARRANTY PERIOD. (AREA B: NAPA, SOLANO, AND SONOMA COUNTIES)$28.94$27.30$56.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - NEW CONSTRUCTION (AREA B: NAPA, SOLANO, AND SONOMA COUNTIES)$35.25$27.30$62.55
DRYWALL FINISHER/TAPER (ALPINE, BUTTE, COLUSA, EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS), GLENN, LASSEN (WEST OF HWY. 395, EXCLUDING HONEY LAKE); MARIN, MODOC, NAPA, NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS), PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS), PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS), SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$59.63$31.29$90.92
SOFT FLOOR LAYER (MARIN, NAPA, SOLANO AND SONOMA COUNTIES)$59.00$33.03$92.03
GLAZIER (MARIN , NAPA & SONOMA COUNTIES; SOLANO COUNTY (WEST OF A LINE DEFINED AS FOLLOWS: HWY. 80 CORRIDOR BEGINNING AT THE CITY OF FAIRFIELD, INCLUDING TRAVIS AIR FORCE BASE AND SUISUN CITY; GOING NORTH OF MANAKAS CORNER RD., CONTINUE NORTH ON SUISUN VALLEY RD. TO THE NAPA COUNTY LINE; HWY. 80 CORRIDOR SOUTH ON GRIZZLY ISLAND RD. TO THE GRIZZLY ISLAND MANAGEMENT AREA))$56.22$34.00$90.22
SOFT FLOOR LAYER (EL DORADO COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS) AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS))$34.27$16.47$50.74
DRYWALL: (1) TAPER (EL DORADO COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS))$42.79$16.12$58.91
DRYWALL: (2) STEEPLEJACK - TAPER, OVER 40 FT WITH OPEN SPACE BELOW (EL DORADO COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS))$44.29$16.12$60.41
SOFT FLOOR LAYER (ALPINE; COLUSA; EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS); GLENN; LASSEN (WEST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); MODOC; NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS); PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS); PLUMAS; SACRAMENTO; SHASTA; SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS); SISKIYOU; SUTTER; TEHAMA; TRINITY; YOLO AND YUBA COUNTIES)$48.54$26.59$75.13
PLASTERER (AREA 355: NAPA & SONOMA COUNTIES)$32.70$31.68$64.38
PLUMBER, STEAMFITTER, REFRIGERATION FITTER (ALL OTHER WORK - NEW CONSTRUCTION RATE) (MARIN AND SONOMA COUNTIES)$91.00$49.40$140.40
PLUMBER, STEAMFITTER, REFRIGERATION FITTER (WORK ON WODDEN FRAM STRUCTURES 5 STORIES OR LESS EXCLUDING HIGH-RISE BUILDINGS AND COMMERCIAL WORK SUCH AS HOSPITALS, PRISONS, HOTELS, SCHOOLS, CASINOS, WASTEWATER TREATMENT PLANTS, AND RESEARCH FACILITIES AS WELL AS REFRIGERATION PIPEFITTING, SERVICE AND REPAIR WORK- MARKET RECOVERY RATE. (MARIN AND SONOMA COUNTIES)$69.70$46.38$116.08
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER) (MARIN & SONOMA COUNTIES)$77.35$36.53$113.88
PLUMBER (BUTTE, COLUSA, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY & YUBA COUNTIES)$52.75$41.39$94.14
PLUMBER/PIPEFITTER (EL DORADO COUNTY (LAKE TAHOE AREA ONLY); NEVADA COUNTY (LAKE TAHOE AREA ONLY); AND PLACER COUNTY (LAKE TAHOE AREA ONLY))$52.14$18.71$70.85
ROOFER (MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$54.94$23.34$78.28
ROOFER (ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$46.73$21.36$68.09
SPRINKLER FITTER (FIRE SPRINKLERS) (MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$81.54$41.35$122.89
SPRINKLER FITTER (ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)$52.06$29.86$81.92
SHEET METAL WORKER: ALL OTHER WORK (MARIN, NAPA, SOLANO SONOMA & TRINITY COUNTIES)$86.31$46.75$133.06
SHEET METAL WORKER: MECHANICAL CONTRACTS $200,000 OR LESS (MARIN, NAPA, SOLANO SONOMA & TRINITY COUNTIES)$73.19$46.00$119.19
SHEET METAL WORKER (ALPINE COUNTY)$56.96$38.63$95.59
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY (BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, YOLO, AND YUBA COUNTIES)$44.45$35.55$80.00
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY (MARIN, NAPA, SOLANO, SONOMA AND TRINITY COUNTIES)$44.45$35.55$80.00
SHEET METAL WORKER: MECHANICAL JOBS $200,000 & UNDER (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU, AND TEHAMA COUNTIES)$72.71$38.92$111.63
SHEET METAL WORKER: MECHANICAL JOBS OVER $200,000 (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU, AND TEHAMA COUNTIES)$59.82$41.52$101.34

Highway CA20260007 rev 5

ClassificationRateFringeTotal
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 2: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHEMA, TRINITY, YOLO, & YUBA COUNTIES)$64.56$25.07$89.63
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$35.31$12.75$48.06
BOILERMAKER: (2) REMAINING COUNTIES$45.60$38.99$84.59
MARBLE FINISHER$42.06$19.80$61.86
BRICKLAYER (SPECIALTY PAY: A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE.) (AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES)$52.76$25.01$77.77
TERRAZZO FINISHER$44.93$20.98$65.91
TERRAZZO WORKER/SETTER$60.58$29.79$90.37
TILE FINISHER (AREA 2: ALPINE, AMADOR)$34.76$19.22$53.98
TILE FINISHER (AREA 4: SONOMA)$35.78$19.23$55.01
TILE LAYER (AREA 2: ALPINE, AMADOR)$55.17$22.52$77.69
TILE LAYER (AREA 4: SONOMA)$56.79$22.54$79.33
MARBLE MASON$61.72$30.31$92.03
PILEDRIVER$54.10$34.69$88.79
DRYWALL INSTALLERS/LATHERS: (AREA 3- SACARAMENTO, WESTERN EL DORADO (TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND THE TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE), WESTERN PLACER (TERRIROTY WEST OF AND INCLUDING HIGHWAY 49), AND YOLO)$47.27$31.26$78.53
DRYWALL STOCKER/SCRAPPER: (AREA 3- SACARAMENTO, WESTERN EL DORADO (TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND THE TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE), WESTERN PLACER (TERRIROTY WEST OF AND INCLUDING HIGHWAY 49), AND YOLO)$23.64$18.22$41.86
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (AMADOR COUNTY)$52.65$30.82$83.47
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (AMADOR COUNTY)$45.57$30.82$76.39
CARPENTERS: JOURNEYMAN CARPENTER. (AMADOR COUNTY)$45.42$30.82$76.24
CARPENTERS: MILLWRIGHT. (AMADOR COUNTY)$47.92$32.41$80.33
COMMUNICATIONS SYSTEM: SOUND & COMMUNICATIONS INSTALLER. (SCOPE OF WORK: INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK SYSTEMS. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS: BACKGROUND FOREGROUND MUSIC INTERCOM AND TELEPHONE INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS, NURSE CALL SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE ALARM SYSTEMS: INSTALLATION, WIRE PULLING AND TESTING C. TELEVISION AND VIDEO SYSTEMS: TELEVISION MONITORING AND SURVEILLANCE SYSTEMS, VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY SYSTEMS: PERIMETER SECURITY SYSTEMS, VIBRATION SENSOR SYSTEMS, CARD ACCESS SYSTEMS, ACCESS CONTROL SYSTEMS, SONAR/INFRARED MONITORING EQUIPMENT E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS: SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION), PCM (PULSE CODE MODULATION), INVENTORY CONTROL SYSTEMS, DIGITAL DATA SYSTEMS, BROADBAND AND BASEBAND AND CARRIERS, POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS, DATA COMMUNICATION SYSTEMS, RF AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA SYSTEMS. WORK EXCLUDED: RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT. (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES)$40.00$25.50$65.50
COMMUNICATIONS SYSTEM: SOUND & COMMUNICATIONS TECHNICIAN. (SCOPE OF WORK: INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE TRANSMISSION AND/OR TRANSFERENCE OF VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL, EDUCATION, SECURITY AND ENTERTAINMENT PURPOSES FOR THE FOLLOWING TV MONITORING AND SURVEILLANCE, BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL SYSTEM, RADIO PAGE, SCHOOL INTERCOM AND SOUND, BURGLAR ALARMS, AND LOW VOLTAGE MASTER CLOCK SYSTEMS. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS: BACKGROUND FOREGROUND MUSIC INTERCOM AND TELEPHONE INTERCONNECT SYSTEMS, TELEPHONE SYSTEMS, NURSE CALL SYSTEMS, RADIO PAGE SYSTEMS, SCHOOL INTERCOM AND SOUND SYSTEMS, BURGLAR ALARM SYSTEMS, LOW VOLTAGE MASTER CLOCK SYSTEMS, MULTI-MEDIA/MULTIPLEX SYSTEMS, SOUND AND MUSICAL ENTERTAINMENT SYSTEMS, RF SYSTEMS, ANTENNAS AND WAVE GUIDE. B. FIRE ALARM SYSTEMS: INSTALLATION, WIRE PULLING AND TESTING C. TELEVISION AND VIDEO SYSTEMS: TELEVISION MONITORING AND SURVEILLANCE SYSTEMS, VIDEO SECURITY SYSTEMS, VIDEO ENTERTAINMENT SYSTEMS, VIDEO EDUCATIONAL SYSTEMS, MICROWAVE TRANSMISSION SYSTEMS, CATV AND CCTV D. SECURITY SYSTEMS: PERIMETER SECURITY SYSTEMS, VIBRATION SENSOR SYSTEMS, CARD ACCESS SYSTEMS, ACCESS CONTROL SYSTEMS, SONAR/INFRARED MONITORING EQUIPMENT E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS: SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION), PCM (PULSE CODE MODULATION), INVENTORY CONTROL SYSTEMS, DIGITAL DATA SYSTEMS, BROADBAND AND BASEBAND AND CARRIERS, POINT OF SALE SYSTEMS, VSAT DATA SYSTEMS, DATA COMMUNICATION SYSTEMS, RF AND REMOTE CONTROL SYSTEMS, FIBER OPTIC DATA SYSTEMS. WORK EXCLUDED: RACEWAY SYSTEMS ARE NOT COVERED (EXCLUDING LADDER-RACK FOR THE PURPOSE OF THE ABOVE LISTED SYSTEMS). CHASES AND/OR NIPPLES (NOT TO EXCEED 10 FEET) MAY BE INSTALLED ON OPEN WIRING SYSTEMS. ENERGY MANAGEMENT SYSTEMS. SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) WHEN NOT INTRINSIC TO THE ABOVE LISTED SYSTEMS (IN THE SCOPE). FIRE ALARM SYSTEMS WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) SHALL BE PERFORMED AT THE ELECTRICIAN WAGE RATE, WHEN EITHER OF THE FOLLOWING TWO (2) CONDITIONS APPLY: 1. THE PROJECT INVOLVES NEW OR MAJOR REMODEL BUILDING TRADES CONSTRUCTION. 2. THE CONDUCTORS FOR THE FIRE ALARM SYSTEM ARE INSTALLED IN CONDUIT. (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS, SACRAMENTO, TRINITY, YOLO, YUBA COUNTIES)$46.00$25.68$71.68
ELECTRICIAN (REMAINING AREA) (CABLE SPLICER: RECEIVES 110% OF THE ELECTRICIAN BASIC HOURLY RATE.) (ALPINE (WEST OF SIERRA MT. WATERSHED), AMADOR, BUTTE, COLUSA, EL DORADO (WEST OF SIERRA MT. WATERSHED), GLENN, LASSEN, NEVADA (WEST OF SIERRA MT. WATERSHED), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF SIERRA MT. WATERSHED), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES)$52.70$38.68$91.38
ELECTRICIAN (SIERRA ARMY DEPOT, HERLONG) (CABLE SPLICER: RECEIVES 110% OF THE ELECTRICIAN BASIC HOURLY RATE.) (ALPINE (WEST OF SIERRA MT. WATERSHED), AMADOR, BUTTE, COLUSA, EL DORADO (WEST OF SIERRA MT. WATERSHED), GLENN, LASSEN, NEVADA (WEST OF SIERRA MT. WATERSHED), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF SIERRA MT. WATERSHED), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES)$48.83$18.54$67.37
ELECTRICIAN (TUNNEL WORK) (CABLE SPLICER: RECEIVES 110% OF THE ELECTRICIAN BASIC HOURLY RATE.) (ALPINE (WEST OF SIERRA MT. WATERSHED), AMADOR, BUTTE, COLUSA, EL DORADO (WEST OF SIERRA MT. WATERSHED), GLENN, LASSEN, NEVADA (WEST OF SIERRA MT. WATERSHED), PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF SIERRA MT. WATERSHED), SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES)$41.01$18.54$59.55
ELEVATOR MECHANIC ($84.05$38.44$122.49
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (1) LEVERMAN (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$62.61$39.55$102.16
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: REMAINDER. PLACER COUNTY: AREA 1: ALL BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. SISKIYOU COUNTY: AREA 1: CENTRAL PART, AREA 2: REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$57.65$39.55$97.20
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$56.53$39.55$96.08
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: REMAINDER. PLACER COUNTY: AREA 1: ALL BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. SISKIYOU COUNTY: AREA 1: CENTRAL PART, AREA 2: REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$53.23$39.55$92.78
IRONWORKER (AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, MARIN, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SOLANO, SONOMA, SUTTER, TEHAMA, YOLO, AND YUBA COUNTIES)$50.70$35.15$85.85
LABORER, ASBESTOS/MOLD/LEAD LABORER: MARIN AND NAPA COUNTIES$37.75$29.69$67.44
LABORER, ASBESTOS/MOLD/LEAD LABORER: REMAINING COUNTIES$36.75$29.69$66.44
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (AREA B: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE, EL DORADO, FRESNO, FLENN, HUMBOLDT, KINGS, LAKE, LASSEN, MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NEVADA, PALCER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, SIERRA, SHASTA, SISKIYOU, STANISLAUS, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO, AND YUBA COUNTIES)$36.26$27.32$63.58
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I (AREA B: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE, EL DORADO, FRESNO, FLENN, HUMBOLDT, KINGS, LAKE, LASSEN, MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NEVADA, PALCER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, SIERRA, SHASTA, SISKIYOU, STANISLAUS, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO, AND YUBA COUNTIES)$36.56$27.32$63.88
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II (AREA B: ALPINE, AMADOR, BUTTE, CALAVERAS, COLUSA, DEL NORTE, EL DORADO, FRESNO, FLENN, HUMBOLDT, KINGS, LAKE, LASSEN, MADERA, MARIPOSA, MENDOCINO, MERCED, MODOC, MONTEREY, NEVADA, PALCER, PLUMAS, SACRAMENTO, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, SIERRA, SHASTA, SISKIYOU, STANISLAUS, TEHAMA, TRINITY, TULARE, TUOLUMNE, YOLO, AND YUBA COUNTIES)$34.06$27.32$61.38
TUNNEL AND SHAFT LABORERS: GROUP 2: RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL). (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$45.66$27.72$73.38
TUNNEL AND SHAFT LABORERS: GROUP 3: BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE. (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$45.41$27.72$73.13
TUNNEL AND SHAFT LABORERS: GROUP 4: VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD). (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$44.96$27.72$72.68
TUNNEL AND SHAFT LABORERS: GROUP 5: GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN. (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$44.42$27.72$72.14
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES$46.41$27.72$74.13
LABORER, WRECKING - GROUP 2: SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). ($35.35$27.30$62.65
PLASTERER TENDER (WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL.)$39.77$28.54$68.31
LABORER, WRECKING - GROUP 2: SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). ($36.35$27.30$63.65
PLASTERER TENDER (WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL.)$39.77$28.54$68.31
LABORER, WRECKING - GROUP 2: SEMI-SKILLED WRECKER (SALVAGING OF OTHER BUILDING MATERIALS). ($35.35$27.30$62.65
PLASTERER TENDER (WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL.)$39.77$28.54$68.31
PAINTERS (SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR.) (ALPINE, AMADOR, BUTTE, COLUSA. EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS), GLENN, LASSEN (WEST OF HIGHWAY 395, EXCLUDING HONEY LAKE), MODOC, NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS), PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS), PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS), SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO & YUBA COUNTIES)$43.45$22.80$66.25
PAINTERS: BRUSH AND ROLLER (PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR. SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR. SPECIAL COATING SPRAY STEEL = $1.25/HR. SWING STAGE = $2.00/HR$39.43$16.16$55.59
PAINTERS: PAPERHANGER (PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR. SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR. SPECIAL COATING SPRAY STEEL = $1.25/HR. SWING STAGE = $2.00/HR$42.19$16.16$58.35
PAINTERS: SPRAY PAINTER (PREMIUMS: SPECIAL COATINGS (BRUSH), AND SANDBLASTING = $0.50/HR. SPECIAL COATINGS (SPRAY), AND STEEPLEJACK = $1.00/HR. SPECIAL COATING SPRAY STEEL = $1.25/HR. SWING STAGE = $2.00/HR$41.43$16.16$57.59
GLAZIER (PAID HOLIDYAS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDETN'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY) (EMPLOYEE REQUIRED TO WEAR A BODY HARNESS SHALL RECEIVE $1.50 PER HOUR ABOVE THE BASIC HOURLY RATE AT ANY ELEVATION) (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO (REMAINDER), SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)$43.25$35.62$78.87
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 - GAMECOURT & PLAYGROUND INSTALLER$34.71$17.62$52.33
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 - STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO PLASTIC; TAPE, TRAFFIC STRIPES AND MARKINGS$40.83$17.62$58.45
PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 - PROTECTIVE COATING, PAVEMENT SEALING$35.11$17.62$52.73
PLASTERER (AREA 295: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SUTTER, TEHEMA, TRINITY, YOLO & YUBA COUNTIES)$32.70$31.68$64.38
PLASTERER (AREA 355: MARIN)$36.73$31.68$68.41
CEMENT MASON/CONCRETE FINISHER$32.15$23.27$55.42
PLUMBER/PIPEFITTER: ALL OTHER WORK ($71.60$38.38$109.98
PLUMBER/PIPEFITTER: LIGHT COMMERCIAL (DEFINITION OF LIGHT COMMERCIAL: WORK SHALL INCLUDE STRIP SHOPPING CENTERS, OFFICE BUILDINGS, SCHOOLS, AND OTHER COMMERCIAL STRUCTURES WHICH THE TOTAL PLUMBING BID DOES NOT EXCEED $250,000 AND THE TOTAL HEATING AND COOLING DOES NOT EXCEED $250,000; OR ANY PROJECTS BID IN PHASES SHALL NOT QUALIFY UNLESS THE TOTAL PROJECT IS LESS THAN $250,000 FOR THE PLUMBING BID; AND $250,000 FOR THE HEATING AND COOLING BID. EXCLUDED ARE HOSPITALS, JAILS, INSTITUTIONS AND INDUSTRIAL PROJECTS, REGARDLESS OF SIZE OF THE PROJECT) ($30.85$20.40$51.25
UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$36.01$18.50$54.51
PLUMBER (AMADOR (SOUTH OF SAN JOAQUIN RIVER) AND ALPINE COUNTIES)$58.45$38.74$97.19
PLUMBER/PIPEFITTER: JOURNEYMAN (AMADOR (NORTH OF SAN JOAQUIN RIVER), EL DORADO (EXCLUDING LAKE TAHOE AREA), NEVADA (EXCLUDING LAKE TAHOE AREA); PLACER (EXCLUDING LAKE TAHOE AREA), SACRAMENTO, AND YOLO COUNTIES)$67.37$30.00$97.37
PLUMBER/PIPEFITTER: LIGHT COMMERCIAL WORK (AMADOR (NORTH OF SAN JOAQUIN RIVER), EL DORADO (EXCLUDING LAKE TAHOE AREA), NEVADA (EXCLUDING LAKE TAHOE AREA); PLACER (EXCLUDING LAKE TAHOE AREA), SACRAMENTO, AND YOLO COUNTIES)$55.58$24.02$79.60
SHEET METAL WORKER (AMADOR, COLUSA, EL DORADO, NEVADA, PLACER, SACRAMENTO, SUTTER, YOLO, AND YUBA COUNTIES)$59.82$41.52$101.34
TRUCK DRIVERS: GROUP 1 - DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK (2- AXLE UNIT); NIPPER TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP TRUCK (WHEN FLAT RACK TRUCK IS USED APPROPRIATE FLAT RACK SHALL APPLY); CONCRETE PUMP MACHINE; FORK LIFT AND LIFT JITNEYS; FUEL AND/OR GREASE TRUCK DRIVER OR FUEL PERSON; SNOW BUGGY; STEAM CLEANING; BUS OR PERSONHAUL DRIVER; ESCORT OR PILOT CAR DRIVER; PICKUP TRUCK; TEAMSTER OILER/GREASER AND/OR SERVICEPERSON; HOOK TENDER (INCLUDING LOADING AND UNLOADING); TEAM DRIVER; TOOL ROOM ATTENDANT (REFINERIES) ($43.26$34.28$77.54
TRUCK DRIVERS: GROUP 2 - DUMP TRUCKS, 6 YDS. AND UNDER 8 YDS.; TRANSIT MIXERS, THROUGH 10 YDS.; WATER TRUCKS, UNDER 7,000 GALS.; JETTING TRUCKS, UNDER 7,000 GALS.; SINGLE-UNIT FLAT RACK (3-AXLE UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR (NOT SELF-LOADED); RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND "A" FRAME DRIVERS; COMBINATION WINCH TRUCK WITH HOIST; ROAD OIL TRUCK OR BOOTPERSON; BUGGYMOBILE; ROSS, HYSTER AND SIMILAR STRADDLE CARRIERS; SMALL RUBBER-TIRED TRACTOR ($43.56$34.28$77.84
TRUCK DRIVERS: GROUP 3 - DUMP TRUCKS, 8 YDS. AND INCLUDING 24 YDS.; TRANSIT MIXERS, OVER 10 YDS.; WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAILERS; LOWBED HEAVY DUTY TRANSPORT; HEAVY DUTY TRANSPORT TILLER PERSON; SELF- PROPELLED STREET SWEEPER WITH SELF-CONTAINED REFUSE BIN; BOOM TRUCK - HYDRO-LIFT OR SWEDISH TYPE EXTENSION OR RETRACTING CRANE; P.B. OR SIMILAR TYPE SELF-LOADING TRUCK; TIRE REPAIRPERSON; COMBINATION BOOTPERSON AND ROAD OILER; DRY DISTRIBUTION TRUCK (A BOOTPERSON WHEN EMPLOYED ON SUCH EQUIPMENT, SHALL RECEIVE THE RATE SPECIFIED FOR THE CLASSIFICATION OF ROAD OIL TRUCKS OR BOOTPERSON); AMMONIA NITRATE DISTRIBUTOR, DRIVER AND MIXER; SNOW GO AND/OR PLOW ($43.86$34.28$78.14
TRUCK DRIVERS: GROUP 4 - DUMP TRUCKS, OVER 25 YDS. AND UNDER 65 YDS.; WATER PULLS - DW 10'S, 20'S, 21'S AND OTHER SIMILAR EQUIPMENT WHEN PULLING AQUA/PAK OR WATER TANK TRAILERS; HELICOPTER PILOTS (WHEN TRANSPORTING MEN AND MATERIALS); LOWBEDK HEAVY DUTY TRANSPORT UP TO INCLUDING 7 AXLES; DW10'S, 20'S, 21'S AND OTHER SIMILAR CAT TYPE, TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TRAILERS; VACUUM TRUCKS 7500 GALS AND OVER AND TRUCK REPAIRMAN ($44.21$34.28$78.49
TRUCK DRIVERS: GROUP 5 - DUMP TRUCKS, 65 YDS. AND OVER; HOLLAND HAULER; LOW BED HEAVY DUTY TRANSPORT OVER 7 AXLES ($44.56$34.28$78.84
DIVER 6 classifications · $88.79 to $138.31 total
ClassificationRateFringeTotal
DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN. (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$54.10$34.69$88.79
DIVER: DIVER STANDBY. (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$60.51$34.69$95.20
DIVER: DIVER TENDER. (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$59.51$34.69$94.20
DIVER: DIVER WET. (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$103.62$34.69$138.31
DIVER: MANIFOLD OPERATOR (MIXED GAS). (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$64.51$34.69$99.20
DIVER: MANIFOLD OPERATOR (STANDBY). (DEPTH PAY (SURFACE DIVING): 050 TO 100 FT, $2.00 PER FOOT. 101 TO 150 FT, $3.00 PER FOOT. 151 TO 220 FT, $4.00 PER FOOT. 221 FT.-DEEPER, $5.00 PER FOOT.) (SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS.) (DIVING IN ENCLOSURES: WHERE IT IS NECESSARY FOR DIVERS TO ENTER PIPES OR TUNNELS, OR OTHER ENCLOSURES WHERE THERE IS NO VERTICAL ASCENT, THE FOLLOWING PREMIUM SHALL BE PAID: DISTANCE TRAVELED FROM ENTRANCE 26 FEET TO 300 FEET, $1.00 PER FOOT. WHEN IT IS NECESSARY FOR A DIVER TO ENTER ANY PIPE, TUNNEL OR OTHER ENCLOSURE LESS THAN 48" IN HEIGHT, THE PREMIUM WILL BE $1.00 PER FOOT.) (WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT.)$59.51$34.69$94.20
OPERATOR 52 classifications · $73.65 to $101.34 total
ClassificationRateFringeTotal
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 - LANDSCAPE FINISH GRADE OPERATOR: ALL FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. CALAVERAS COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. FRESNO COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. MADERA COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART, AREA 2: SOUTHWESTERN PART. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART.)$57.85$28.56$86.41
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 - LANDSCAPE OPERATOR UP TO 65 HP; ALL EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP 3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S RATING IS 65 HP OR LESS; A-FRAME AND WINCH TRUCK, BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE, ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER 31 HP UP TO 65 HP. (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: AREA 2: EASTERN PART. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. ELDORADO COUNTY: FRESNO COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. MADERA COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. AREA 2: EASTERN PART. MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART, AREA 2: SOUTHWESTERN PART. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART.)$54.25$28.56$82.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 - LANDSCAPE UTILITY OPERATOR; SMALL RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA 2: MODOC COUNTY. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. CALAVERAS COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. ELDORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. FRESNO COUNTY: AREA 1: REMAINDER, AREA 2: EASTERN PART. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. MADERA COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART. MONTERREY COUNTY AREA 1: EXCEPT SOUTHWESTERN PART, AREA 2: SOUTHWESTERN PART. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. TUOLUMNE COUNTY: AREA 1: EXCEPT EASTERN PART, AREA 2: EASTERN PART.)$49.64$28.56$78.20
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 1 (Lifting devices) - DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 TONS. ($52.64$31.15$83.79
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 1 (Oiler) - DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 TONS. ($43.38$31.15$74.53
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 1 (Truck Crane Oiler) - DERRICK BARGE PEDESTAL MOUNTED OVER 100 TONS; CLAMSHELL OVER 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED OVER 100 TONS. ($45.66$31.15$76.81
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 2 (Lifting devices) - DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AN INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE RIG. ($50.82$31.15$81.97
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 2 (Oiler) - DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AN INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE RIG. ($43.11$31.15$74.26
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 2 (Truck Crane Oiler) - DERRICK BARGE PEDESTAL MOUNTED 45 TONS TO AN INCLUDING 100 TONS; CLAMSHELL UP TO AND INCLUDING 7 CU. YDS.; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED, OVER 45 TONS UP TO AND INCLUDING 100 TONS; FUNDEX F-12 HYDRAULIC PILE RIG. ($45.41$31.15$76.56
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 3 (Lifting devices) - DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 TONS AND UNDER. ($49.14$31.15$80.29
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 3 (Oiler) - DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 TONS AND UNDER. ($42.89$31.15$74.04
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 3 (Truck Crane Oiler) - DERRICK BARGE PEDESTAL MOUNTED UNDER 45 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER; SKID/SCOW PILEDRIVER, ANY TONNAGE; TRUCK CRANE OR CRAWLER, LAND OR BARGE MOUNTED 45 TONS AND UNDER. ($45.12$31.15$76.27
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 4 (Lifting devices) - ASSISTANT OPERATOR IN LIEU OF ASSISTANT TO ENGINEER; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIRPERSON/WELDER ($47.37$31.15$78.52
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 5 (Lifting devices) - DECK ENGINEER ($44.73$31.15$75.88
OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1: GROUP 6 (Lifting devices) - DECKHAND; FIRE TENDER ($42.50$31.15$73.65
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1 - OPERATOR OF HELICOPTER (WHEN USED IN ERECTION WORK); HYDRAULIC EXCAVATOR, 7 CU. YDS. AND OVER; POWER SHOVELS, OVER 7 CU. YDS. ($66.96$32.53$99.49
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2 - HIGHLINE CABLEWAY; HYDRAULIC EXCAVATOR, 3-1/2 CU. YDS. UP TO 7 CU. YDS.; LICENSED CONSTRUCTION WORK BOAT OPERATOR, ON SITE; POWER BLADE OPERATOR (FINISH); POWER SHOVELS, OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS. M.R.C. ($65.43$32.53$97.96
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 3 - ASPHALT MILLING MACHING; CABLE BACKHOE; COMBINATION BACKHOE AND LOADER OVER 3/4 CU. YDS.; CONTINUOUS FLIGHT TIE BACK MACHINE ASSISTANT TO ENGINEER OR MECHANIC; CRANE MOUNTED CONTINUOUS FLIGHT TIE BACK MACHINE, TONNAGE TO APPLY; CRANE MOUNTED DRILL ATTACHMENT, TONNAGE TO APPLY; DOZER, SLOPE BRD; GRADALL; HYDRAULIC EXCAVATOR, UP TO 3 1/2 CU. YDS.; LOADER 4 CU. YDS. AND OVER; LONG REACH EXCAVATOR; MULTIPLE ENGINE SCRAPER (WHEN USED AS PUSH PULL); POWER SHOVELS, UP TO AND INCLUDING 1 CU. YD.; PRE-STRESS WIRE WRAPPING MACHINE; SIDE BOOM CAT, 572 OR LARGER; TRACK LOADER 4 CU. YDS. AND OVER; WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR). ($63.95$32.53$96.48
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4 - ASPHALT PLANT ENGINEER/BOX PERSON; CHICAGO BOOM; COMBINATION BACKHOE AND LOADER UP TO AND INCLUDING 3/4 CU. YD.; CONCRETE BATCH PLANT (WET AND DRY); DOZER AND/OR PUSH CAT; PULL-TYPE ELEVATING LOADER; GRADESETTER, GRADE CHECKER (GPS, MECHANICAL OR OTHERWISE); GROOVING AND GRINDING MACHINE; HEADING SHIELD OPERATOR; HEAVY-DUTY DRILLING EQUIPMENT, HUGHES, LDH, WATSON 3000 OR SIMILAR; HEAVY-DUTY REPAIRPERSON AND/OR WELDER; LIME SPREADER; LODER UNDER 4 CU. YDS.; LUBRICATION AND SERVICE ENGINEER (MOBILE AND GREASE RACK); MECHANICAL FINISHERS OR SPREADER MACHINE (ASPHALT, BARBER-GREENE AND SIMILAR); MILLER FORMLESS M-9000 SLOPE PAVER OR SIMILAR ;PORTABLE CRUSHING ANDS CREENING PLANTS; POWER BLADE SUPPORT; ROLLER OPERATOR, ASPHALT; RUBBER-TIRED SCRAPER, SELF-LOADING (PADDLE WHEELS, ETC.); RUBBER-TIRED EARTHMOVING EQUIPMENT (SCRAPERS); SLIP FORM PAVER (CONCRETE); SMALL TRACTOR WITH DRAG; SOIL STABILIZER (P&H OR EQUAL); SPIDER PLOW AND SPIDER PULLER; TUBEX PILE RIG; UNLICENSED CONSTRUCTION WORK BOAT OPERATOR, ON SITE; TIMBER SKIDDER; TRACK LOADER UP TO 4 YDS.; TRACTOR-DRAWN SCRAPER; TRACTOR, COMPRESSOR DRILL COMBINATION; WELDER; WOODS-MIXER (AND OTHER SIMILAR PUGMILL EQUIPMENT) ($62.57$32.53$95.10
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5 - CAST-IN-PLACE PIPE LAYING MACHINE; COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE CONVEYOR OR CONCRETE PUMP, TRUCK OR EQUIPMENT MOUNTED; CONCRETE CONVEYOR, BUILDING SITE; CONCRETE PUMP OR PUMPCRETE GUN; DRILLING EQUIPMENT, WATSON 2000, TEXOMA 700 OR SIMILAR; DRILLING AND BORING MACHINERY, HORIZONTAL (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACKHAMMERS); CONCRETE MIXER/ALL; PERSON AND/OR MATERIAL HOIST; MECHANICAL FINISHERS (CONCRETE) (CLARY, JOHNSON, BIDWELL BRIDGE DECK OR SIMILAR TYPES); MECHANICAL BURM, CURB AND/OR CURB AND GUTTER MACHINE, CONCRETE OR ASPHALT); MINE OR SHAFT HOIST; PORTABLE CRUSHER; POWER JUMBO OPERATOR (SETTING SLIP-FORMS, ETC., IN TUNNELS); SCREED (AUTOMATIC OR MANUAL); SELF-PROPELLED COMPACTOR WITH DOZER; TRACTOR WITH BOOM D6 OR SMALLER; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY OVER 5 FT. DEPTH; VERMEER T-600B ROCK CUTTER OR SIMILAR. ($61.30$32.53$93.83
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 6 - ARMOR-COATER (OR SIMILAR); BALLAST JACK TAMPER; BOOM-TYPE BACKFILLING MACHINE; ASSISTANT PLANT ENGINEER; BRIDGE AND/OR GANTRY CRANE; CHEMICAL GROUTING MACHINE, TRUCK-MOUNTED; CHIP SPREADING MACHINE OPERATOR; CONCRETE SAW (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); DECK ENGINEER; DRILLING EQUIPMENT TEXOMA 600, HUGHES 200 SERIES OR SIMILAR UP TO AND INCLUDING 30 FT. M.R.C.; DRILL DOCTOR; HELICOPTER RADIO OPERATOR; HYDRO-HAMMER OR SIMILAR; LINE MASTER; SKIDSTEER LOADER, BOBCAT LARGER THAN 743 SERIES OR SIMILAR (WITH ATTACHMENTS); LOCOMOTIVE; LULL HI-LIFT OR SIMILAR; OILER, TRUCK MOUNTED EQUIPMENT; PAVEMENT BREAKER, TRUCK-MOUNTED, WITH COMPRESSOR COMBINATION; PAVING FABRIC INSTALLATION AND/OR LAYING MACHINE; PIPE BENDING MACHINE (PIPELINES ONLY); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND SUPPORTED); SCREED (EXCEPT ASPHALTIC CONCRETE PAVING); SELF-PROPELLED PIPELINE WRAPPING MACHINE; TRACTOR; SELF-LOADING CHIPPER; CONCRETE BARRIER MOVING MACHINE. ($59.98$32.53$92.51
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7 - BALLAST REGULATOR; BOOM TRUCK OR DUAL-PURPOSE A-FRAME TRUCK, NON-ROTATING - UNDER 15 TONS; CARY LIFT OR SIMILAR; COMBINATION SLURRY MIXER AND/OR CLEANER; DRILLING EQUIPMENT, 20 FT. AND UNDER M.R.C.; FIRETENDER (HOT PLANT); GROUTING MACHINE OPERATOR; HIGHLINE CABLEWAY SIGNALPERSON; STATIONARY BELT LOADER (KOLMAN OR SIMILAR); LIFT SLAB MACHINE (VAGTBORG AND SIMILAR TYPES); MAGINNES INTERNAL FULL SLAB VIBRATOR; MATERIAL HOIST (1 DRUM); MECHANICAL TRENCH SHIELD; PAVEMENT BREAKER (WITH OR WITHOUT COMPRESSOR COMBINATION); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); POST DRIVER; ROLLER (EXCEPT ASPHALT); CHIP SEAL; SELF-PROPELLED AUTOMATICALLY APPLIED CONCRETE CURING MACHINE (ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); SELF-PROPELLED COMPACTOR (WITHOUT DOZER); SIGNAL PERSON; SLIP-FORM PUMPS (LIFTING DEVICE FOR CONCRETE FORMS); TIE SPACER; TOWER MOBILE; TRENCHING MACHINE, MAXIMUM DIGGING CAPACITY UP TO AND INCLUDING 5 FT. DEPTH; TRUCK-TYPE LOADER. ($58.84$32.53$91.37
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8 - BIT SHARPENER; BOILER TENDER; BOX OPERATOR; BRAKEPERSON; COMBINATION MIXER AND COMPRESSOR (SHOTCRETE/GUNITE); COMPRESSOR OPERATOR; DECKHAND; FIRE TENDER; FORKLIFT (UNDER 20 FT.); GENERATOR; GUNITE/SHOTCRETE EQUIPMENT OPERATOR; HYDRAULIC MONITOR; KEN SEAL MACHINE (OR SIMILAR); MIXERMOBILE; OILER; PUMP OPERATOR; REFRIGERATION PLANT;RESERVOIR-DEBRIS TUG (SELF-PROPELLED FLOATING); ROSS CARRIER (CONSTRUCTION SITE); ROTOMIST OPERATOR; SELF-PROPELLED TAPE MACHINE; SHUTTLECAR; SELF-PROPELLED POWER SWEEPER OPERATOR (INCLUDES VACUUM SWEEPER); SLUSHER OPERATOR; SURFACE HEATER; SWITCHPERSON; TAR POT FIRETENDER; TUGGER HOIST, SINGLE DRUM; VACUUM COOLING PLANT; WELDING MACHIEN (POWERED OTHER THAN BY ELECTRICITY). ($57.70$32.53$90.23
OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8-A - ELEVATOR OPERATOR; SKIDSTEER LOADER-BOBCAT 743 SERIES OR SMALLER, AND SIMILAR (WITHOUT ATTACHMENTS); MINI EXCAVATOR UNDER 25 H.P. (BACKHOE-TRENCHER); TUB GRINDER WOOD CHIPPER. ($55.49$32.53$88.02
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (CRANES) - CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. ($68.59$32.53$101.12
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (OILER) - CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. ($43.79$31.15$74.94
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1 (TRUCK CRANE OILER) - CLAMSHELL AND DRAGLINE OVER 7 CU. YDS.; CRANE, OVER 100 TONS; DERRICK, OVER 100 TONS; DERRICK BARGE PEDESTAL-MOUNTED, OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 100 TONS. ($46.08$31.15$77.23
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (CRANES) - CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE. ($66.08$32.53$98.61
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (OILER) - CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE. ($42.83$31.15$73.98
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2 (TRUCK CRANE OILER) - CLAMSHELL AND DRAGLINE OVER 1 CU. YD. UP TO AND INCLUDING 7 CU. YDS.; CRANE, OVER 45 TONS UP TO AND INCLUDING 100 TONS; DERRICK BARGE, 100 TONS AND UNDER; SELF PROPELLED BOOM-TYPE LIFTING DEVICE, OVER 45 TONS; TOWER CRANE. ($45.07$31.15$76.22
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (CRANES) - CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. ($64.34$32.53$96.87
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (HYDRAULIC) - CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. ($60.61$32.53$93.14
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (OILER) - CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. ($42.55$31.15$73.70
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3 (TRUCK CRANE OILER) - CLAMSHELL AND DRAGLINE UP TO AND INCLUDING 1 CU. YD.; CRANES 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE 45 TONS AND UNDER. ($44.83$31.15$75.98
OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 4 (CRANES)- BOOM TRUCK OR DUAL PURPOSE A-FRAME TRUCK, NON-ROTATING OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) OVER 15 TONS; TRUCK-MOUNTED ROTATING TELESCOPIC BOOM TYPE LIFTING DEVICE, MANITEX OR SIMILAR (BOOM TRUCK) - UNDER 15 TONS. ($61.30$32.53$93.83
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 1 - CRANE OVER 100 TONS; DERRICK OVER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 100 TONS ($68.81$32.53$101.34
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 2 - CRANE OVER 45 TONS TO 100 TONS; DERRICK UNDER 100 TONS; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE OVER 45 TONS TO 100 TONS; TOWER CRANE. ($67.04$32.53$99.57
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 3 - CRANE, 45 TONS AND UNDER; SELF-PROPELLED BOOM-TYPE LIFTING DEVICE, 45 TONS AND UNDER. ($65.56$32.53$98.09
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 4 - CHICAGO BOOM; FORKLIFT, 10 TONS AND OVER; HEAVY-DUTY REPAIR PERSON/WELDER ($63.54$32.53$96.07
OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1: GROUP 5 - BOOM CAT. ($62.24$32.53$94.77
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 1 - HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE (RUBER TIRED, RAIL OR TRACK TYPE); RAISED BORE OPERATOR (TUNNELS); TUNNEL MOLE BORE OPERATOR. ($63.06$32.53$95.59
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 1-A - TUNNEL BORE MACHINE OPERATOR; 20; DIAMETER OR MORE ($65.53$32.53$98.06
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 2 - COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN; POWER JUMBO OPERATOR. ($61.80$32.53$94.33
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 3 - DRILL DOCTOR; MINE OR SHAFT HOIST. ($60.47$32.53$93.00
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 4 - COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR; MOTORMAN. ($59.33$32.53$91.86
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (SHAFTS, STOPES, RAISES) GROUP 5 - BIT SHARPENTER; BRAKEMAN; COMBINATION MIXER AND COMPRESSOR (GUNITE); COMPRESSOR OPERATOR; OILER; PUMP OPERATOR; SLUSHER OPERATOR. ($58.19$32.53$90.72
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 1 - HEADING SHIELD OPERATOR; HEAVY-DUTY REPAIRPERSON; MUCKING MACHINE (RUBER TIRED, RAIL OR TRACK TYPE); RAISED BORE OPERATOR (TUNNELS); TUNNEL MOLE BORE OPERATOR. ($62.96$32.53$95.49
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 1-A - TUNNEL BORE MACHINE OPERATOR; 20; DIAMETER OR MORE. ($65.43$32.53$97.96
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 2 - COMBINATION SLUSHER AND MOTOR OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN; POWER JUMBO OPERATOR. ($61.70$32.53$94.23
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 3 - DRILL DOCTOR; MINE OR SHAFT HOIST. ($60.37$32.53$92.90
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 4 - COMBINATION SLURRY MIXER CLEANER; GROUTING MACHINE OPERATOR; MOTORMAN. ($59.23$32.53$91.76
OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1: (UNDERGROUND) GROUP 5 - BIT SHARPENTER; BRAKEMAN; COMBINATION MIXER AND COMPRESSOR (GUNITE); COMPRESSOR OPERATOR; OILER; PUMP OPERATOR; SLUSHER OPERATOR. ($58.09$32.53$90.62
LABORER 46 classifications · $53.57 to $64.76 total
ClassificationRateFringeTotal
LABORER: MASON TENDER-BRICK (ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$36.29$25.55$61.84
LABORER: CONSTRUCTION CRAFT LABORERS - CONSTRUCTION SPECIALIST GROUP: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL. ($36.20$27.30$63.50
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER. ($35.50$27.30$62.80
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. (SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. "SEWER CLEANER" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES.) (MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED.) (AREA B: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)$35.72$27.30$63.02
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. ($35.55$27.30$62.85
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. ($36.05$27.30$63.35
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. ($30.37$23.20$53.57
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES. ($35.35$27.30$62.65
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY). ($35.25$27.30$62.55
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION". ($28.94$27.30$56.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - ESTABLISHED WARRANTY PERIOD. (AREA B: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)$28.94$27.30$56.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - NEW CONSTRUCTION (AREA B: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHIASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, YUBA COUNTIES)$35.25$27.30$62.55
LABORER: GUNITE - GROUP 1: STRUCTURAL NOZZLEMAN. ($36.46$27.30$63.76
LABORER: GUNITE - GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. ($35.96$27.30$63.26
LABORER: GUNITE - GROUP 3: REBOUNDMAN ($35.37$27.30$62.67
LABORER: GUNITE - GROUP 4: GUNITE LABORER ($35.25$27.30$62.55
LABORER: WRECKING - GROUP 1: SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS AND MATERIALS). ($35.50$27.30$62.80
LABORER: CONSTRUCTION CRAFT LABORERS - CONSTRUCTION SPECIALIST GROUP: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL. ($37.20$27.30$64.50
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER. ($36.50$27.30$63.80
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. (SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. "SEWER CLEANER" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES.) (MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED.) (AREA A: MARIN COUNTY)$36.72$27.30$64.02
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. ($36.55$27.30$63.85
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. ($37.05$27.30$64.35
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. ($31.37$23.20$54.57
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES. ($36.35$27.30$63.65
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY). ($36.25$27.30$63.55
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION". ($29.94$27.30$57.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - ESTABLISHED WARRANTY PERIOD. (AREA A: MARIN COUNTY)$29.94$27.30$57.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - NEW CONSTRUCTION (AREA A: MARIN COUNTY)$36.25$27.30$63.55
LABORER: GUNITE - GROUP 1: STRUCTURAL NOZZLEMAN. ($37.46$27.30$64.76
LABORER: GUNITE - GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. ($36.96$27.30$64.26
LABORER: GUNITE - GROUP 3: REBOUNDMAN ($36.37$27.30$63.67
LABORER: GUNITE - GROUP 4: GUNITE LABORER ($36.25$27.30$63.55
LABORER: WRECKING - GROUP 1: SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS AND MATERIALS). ($36.50$27.30$63.80
LABORER: CONSTRUCTION CRAFT LABORERS - CONSTRUCTION SPECIALIST GROUP: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM SETTER; PRESSURE PIPELAYER; DAVIS TRENCHER - 300 OR SIMILAR TYPE (AND ALL SMALL TRENCHERS); BLASTER; DIAMOND DRILLER; MULTIPLE UNIT DRILL; HYDRAULIC DRILL. ($36.20$27.30$63.50
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1: ASPHALT SPREADER BOXES (ALL TYPES); BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDING LEADE ABATEMENT; COMPACTORS OF ALL TYPES; CONCRETE AND MAGNESITE MIXER, 1/2 YD. AND UNDER; CONCRETE PAN WORK; CONCRETE SANDER; CONCRETE SAW; CRIBBER AND/OR SHORING; CUT GRANITE CURB SETTER; DRI-PAK-IT MACHINE; FALLER, LOGLOADER AND BUCKER; FORM RAISER, SLIP FORMS; GREEN CUTTER; HEADERBOARD, HUBSETTER, ALIGNER, BY ANY METHOD; HIGH PRESSURE BLOW PIPE (1-1/2" OR OVER, 100 LBS. PRESSURE/OVER); HYDRO SEEDER AND SIMILAR TYPE; JACKHAMMER OPERATOR; JACKING OF PIPE OVER 12 INCHES; JACKSON AND SIMILAR TYPE COMPACTOR; KETTLE TENDER, POT AND WORKER APPLYING ASPHALT, LAY-KOLD, CREOSOTE, LIME, CAUSTIC AND SIMILAR TYPE MATERIALS (APPLYING MEANS APPLYING, DIPPING OR HANDLING OF SUCH MATERIALS); LAGGING, SHEETING, WHALING, BRACING, TRENCHJACKING, LAGGING HAMMER; MAGNESITE, EPOXYRESIN, FIBERGLASS, MASTIC WORKER (WET OR DRY); NO JOINT PIPE AND STRIPPING OF SAME, INCLUDING REPAIR OF VOIDS; PAVEMENT BREAKER AND SPADER, INCLUDING TOOL GRINDER; PERMA CURB; PIPELAYER (INCLUDING GRADE CHECKING IN CONNECTION WITH PIPELAYING); PRECAST-MANHOLE SETTER; PRESSURE PIPE TESTER; POST HOLE DIGGER, AIR, GAS AND ELECTRIC; POWER BROOM SWEEPER; POWER TAMPERS OF ALL TYPES (EXCEPT AS SHOWN IN GROUP 2); RAM SET GUN AND STUD GUN; RIPRAP STONEPAVER AND ROCK-SLINGER, INCLUDING PLACING OF SACKED CONCRETE AND/OR SAND (WET OR DRY) AND GABIONS AND SIMILAR TYPE; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; ROTO AND DITCH WITCH; ROTOTILLER; SANDBLASTER, POT, GUN, NOZZLE OPERATORS; SIGNALLING AND RIGGING; TANK CLEANER; TREE CLIMBER; TURBO BLASTER; VIBRASCREED, BULL FLOAT IN CONNECTION WITH LABORERS' WORK; VIBRATOR; HAZARDOUS WASTE WORKER (LEAD REMOVAL); ASBESTOS AND MOLD REMOVAL WORKER. ($35.50$27.30$62.80
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING. ($35.55$27.30$62.85
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-E: WORK ON AND/OR IN BELL HOLE FOOTINGS AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. (A DEEP FOOTING IS A HOLE 15 FEET OR MORE IN DEPTH.) IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DEPTH EXCEEDS 15 FEET, THE DEEP FOOTING WAGE RATE WOULD APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. ($36.05$27.30$63.35
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-F: WIRE WINDING MACHINE IN CONNECTION WITH GUNITING OR SHOT CRETE. ($36.08$27.30$63.38
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER (CLEARING WORK); CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER (WET OR DRY); DRILLER TENDER, CHUCK TENDER, NIPPER; GUINEA CHASER (STAKE), GROUT CREW; HIGH PRESSURE NOZZLE, ADDUCTOR; HYDRAULIC MONITOR (OVER 100 LBS. PRESSURE); LOADING AND UNLOADING, CARRYING AND HAULING OF ALL RODS AND MATERIALS FOR USE IN REINFORCING CONCRETE CONSTRUCTION; PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDERS; SLOPER; SINGLE FOOT, HAND-HELD, PNEUMATIC TAMPER; ALL PNEUMATIC, AIR, GAS AND ELECTRIC TOOLS NOT LISTED IN GROUPS 1 THROUGH 1-F; JACKING OF PIPE - UNDER 12 INCHES. ($35.35$27.30$62.65
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTING; LIMBER, BRUSH LOADER AND PILER; PAVEMENT MARKER (BUTTON SETTER); MAINTENANCE, REPAIR TRACK AND ROAD BEDS; STREETCAR AND RAILROAD CONSTRUCTION TRACK LABORER; TEMPORARY AIR AND WATER LINES, VICTAULIC OR SIMILAR; TOOL ROOM ATTENDANT (JOBSITE ONLY). ($35.25$27.30$62.55
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 4: FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER (JOBSITE ONLY); MATERIAL CLEANER (JOBSITE ONLY). THE CLASSIFICATION "MATERIAL CLEANER" IS TO BE UTILIZED UNDER THE FOLLOWING CONDITIONS: A: AT DEMOLITION SITE FOR THE SALVAGE OF THE MATERIAL. MATERIAL IS TO BE SALVAGED AND STOCKED TO BE REUSED ON ANOTHER JOB. C: FOR THE CLEANING OF SALVAGE MATERIAL AT THE JOBSITE OR TEMPORARY JOBSITE YARD. THE MATERIAL CLEANER CLASSIFICATION SHOULD NOT BE USED IN THE PERFORMANCE OF "FORM STRIPPING, CLEANING AND OILING AND MOVING TO THE NEXT POINT OF ERECTION". ($28.94$27.30$56.24
LABORER: GUNITE - GROUP 1: STRUCTURAL NOZZLEMAN. ($36.46$27.30$63.76
LABORER: GUNITE - GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN. ($35.96$27.30$63.26
LABORER: GUNITE - GROUP 3: REBOUNDMAN ($35.37$27.30$62.67
LABORER: GUNITE - GROUP 4: GUNITE LABORER ($35.25$27.30$62.55
LABORER: WRECKING - GROUP 1: SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS AND MATERIALS). ($35.50$27.30$62.80
Scoped to other counties 123 classifications in CA20260007 that name counties other than Amador
ClassificationRateFringeTotal
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (AREA 1: MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$84.76$25.07$109.83
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2: MARIN AND NAPA COUNTIES)$44.73$12.75$57.48
BOILERMAKER: (1) MARIN & SOLANO COUNTIES$49.62$41.27$90.89
BRICKLAYER (SPECIALTY PAY: A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE.) (AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA, AND TRINITY COUNTIES)$57.02$28.50$85.52
TILE FINISHER (AREA 1: BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO, YUBA)$35.00$17.44$52.44
TILE FINISHER (AREA 3: MARIN, NAPA, SOLANO, SISKIYOU)$37.75$19.28$57.03
TILE LAYER (AREA 1: BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO, YUBA)$55.55$21.08$76.63
TILE LAYER (AREA 3: MARIN, NAPA, SOLANO, SISKIYOU)$59.92$22.62$82.54
DRYWALL INSTALLERS/LATHERS: (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA)$52.65$31.26$83.91
DRYWALL INSTALLERS/LATHERS: (AREA 4- ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN, LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, AND YUBA)$45.92$31.26$77.18
DRYWALL STOCKER/SCRAPPER: (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA)$26.33$18.22$44.55
DRYWALL STOCKER/SCRAPPER: (AREA 4- ALPINE, BUTTE, COLUSA, EASTERN EL DORADO, GLENN, LASSEN, MODOC, NEVADA, EASTERN PLACER, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, AND YUBA)$22.97$18.22$41.19
CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER (MARIN COUNTY)$52.65$30.82$83.47
CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER (MARIN COUNTY)$52.80$30.82$83.62
CARPENTER: JOURNEYMAN CARPENTER (MARIN COUNTY)$52.65$30.82$83.47
CARPENTER: MILLWRIGHT (MARIN COUNTY)$52.75$32.41$85.16
INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$28.76$22.53$51.29
INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 2- MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)$26.11$22.53$48.64
INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 3- ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$25.16$22.53$47.69
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$32.21$23.03$55.24
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 2- MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)$29.08$23.03$52.11
LEAD INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 3- ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$27.96$23.03$50.99
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 1- MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$36.43$23.03$59.46
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 2- MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES)$32.71$23.03$55.74
MASTER INSTALLER (MODULAR FURNITURE INSTALLER) (AREA 3- ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$31.38$23.03$54.41
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES$60.39$33.52$93.91
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES$54.66$33.52$88.18
CARPENTERS: JOURNEYMAN CARPENTER. (EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND EL DORADO COUNTY (WEST) INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND TERRITORY INSIDE THE CITY LIMITS OF PLACERVILLE.)$54.51$33.52$88.03
CARPENTERS: MILLWRIGHT. (EL DORADO (WEST), PLACER (WEST), SACRAMENTO AND YOLO COUNTIES$57.01$35.11$92.12
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES)$60.39$33.52$93.91
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES)$53.31$33.52$86.83
CARPENTERS: JOURNEYMAN CARPENTER. (ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES)$53.16$33.52$86.68
CARPENTERS: MILLWRIGHT. (ALPINE, COLUSA, EL DORADO (EAST), NEVADA, PLACER (EAST), SIERRA, SUTTER AND YUBA COUNTIES)$55.66$35.11$90.77
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (SOLANO COUNTY)$54.85$31.49$86.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (SOLANO COUNTY)$55.00$31.49$86.49
CARPENTERS: JOURNEYMAN CARPENTER. (SOLANO COUNTY)$54.85$31.49$86.34
CARPENTERS: MILLWRIGHT. (SOLANO COUNTY)$54.95$33.08$88.03
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (NAPA AND SONOMA COUNTIES)$54.85$31.49$86.34
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (NAPA AND SONOMA COUNTIES)$55.00$31.49$86.49
CARPENTERS: JOURNEYMAN CARPENTER. (NAPA AND SONOMA COUNTIES)$54.85$31.49$86.34
CARPENTERS: MILLWRIGHT. (NAPA AND SONOMA COUNTIES)$54.95$33.08$88.03
CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER. (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES)$52.65$30.82$83.47
CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER. (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES)$45.57$30.82$76.39
CARPENTERS: JOURNEYMAN CARPENTER. (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES)$45.42$30.82$76.24
CARPENTERS: MILLWRIGHT. (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES)$47.92$32.41$80.33
CABLE SPLICER. (NAPA AND SOLANO COUNTIES)$69.26$31.36$100.62
ELECTRICIAN. (NAPA AND SOLANO COUNTIES)$61.56$31.13$92.69
SOUND & COMMUNICATIONS: INSTALLER. (SCOPE OF WORK INCLUDES - SOUND & VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL, TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE. EXCLUDES ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDES ENERGY MANAGEMENT SYSTEMS.) (NAPA AND SOLANO COUNTIES)$53.08$30.84$83.92
SOUND & COMMUNICATIONS: TECHNICIAN. (SCOPE OF WORK INCLUDES - SOUND & VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL, TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE. EXCLUDES ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDES ENERGY MANAGEMENT SYSTEMS.) (NAPA AND SOLANO COUNTIES)$61.04$31.08$92.12
ELECTRICIAN (ZONE RATE: 70-90 MILES, $10.00 PER HOUR. 91+ MILES, $15.00 PER HOUR) (ALPINE (EAST OF THE MAIN WATERSHED DIVIDE), EL DORADO (EAST OF THE MAIN WATERSHED DIVIDE), NEVADA (EAST OF THE MAIN WATERSHED), PLACER (EAST OF THE MAIN WATERSHED DIVIDE) AND SIERRA (EAST OF THE MAIN WATERSHED DIVIDE) COUNTIES)$48.50$23.04$71.54
ELECTRICIAN (MARIN AND SONOMA COUNTIES)$59.17$32.04$91.21
SOUND & COMMUNICATIONS: INSTALLER. (SCOPE OF WORK INCLUDES - SOUND & VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL, TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE. EXCLUDES ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDES ENERGY MANAGEMENT SYSTEMS.) (MARIN & SONOMA COUNTIES)$53.08$30.84$83.92
SOUND & COMMUNICATIONS: TECHNICIAN. (SCOPE OF WORK INCLUDES - SOUND & VOICE TRANSMISSION (MUSIC, INTERCOM, NURSE CALL, TELEPHONE); FIRE ALARM SYSTEMS [EXCLUDING FIRE ALARM WORK WHEN INSTALLED IN RACEWAYS (INCLUDING WIRE AND CABLE PULLING) AND WHEN PERFORMED ON NEW OR MAJOR REMODEL BUILDING PROJECTS OR JOBS], TELEVISION & VIDEO SYSTEMS, SECURITY SYSTEMS, COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE. EXCLUDES ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDES INSTALLATION OF RACEWAY SYSTEMS, LINE VOLTAGE WORK, INDUSTRIAL WORK, LIFE-SAFETY SYSTEMS (ALL BUILDINGS HAVING FLOORS LOCATED MORE THAN 75' ABOVE THE LOWEST FLOOR LEVEL HAVING BUILDING ACCESS); EXCLUDES ENERGY MANAGEMENT SYSTEMS.) (MARIN & SONOMA COUNTIES)$61.04$31.08$92.12
ELECTRICIAN (MODOC AND SISKIYOU COUNTIES)$47.04$21.84$68.88
LINE CONSTRUCTION: (1) CABLE SPLICER (DEL NORTE, MODOC & SISKIYOU COUNTIES)$67.80$25.20$93.00
LINE CONSTRUCTION: (2) LINEMAN, POLE SPRAYER, HEAVY LINE EQUIPMENT MAN (DEL NORTE, MODOC & SISKIYOU COUNTIES)$60.54$24.87$85.41
LINE CONSTRUCTION: (3) TREE TRIMMER (DEL NORTE, MODOC & SISKIYOU COUNTIES)$37.84$16.00$53.84
LINE CONSTRUCTION: (4) LINE EQUIPMENT MAN (DEL NORTE, MODOC & SISKIYOU COUNTIES)$53.82$21.82$75.64
LINE CONSTRUCTION: (5) POWDERMEN, JACKHAMMERMEN (DEL NORTE, MODOC & SISKIYOU COUNTIES)$40.37$16.12$56.49
LINE CONSTRUCTION: (6) GROUNDMAN (DEL NORTE, MODOC & SISKIYOU COUNTIES)$33.37$15.80$49.17
LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY) (ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU)$70.16$24.71$94.87
LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE EQUIPMENT (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY) (ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU)$53.30$22.26$75.56
LINE CONSTRUCTION: (3) GROUNDMAN (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY) (ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU)$40.76$21.76$62.52
LINE CONSTRUCTION: (4) POWDERMAN (HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY) (ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU)$51.87$18.79$70.66
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (1) LEVERMAN (AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$60.61$39.55$100.16
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (2) DREDGE DOZER; HEAVY DUTY REPAIRMAN (AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: REMAINDER. PLACER COUNTY: AREA 1: ALL BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. SISKIYOU COUNTY: AREA 1: CENTRAL PART, AREA 2: REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$55.65$39.55$95.20
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (3) BOOSTER PUMP OPERATOR; DECK ENGINEER; DECK MATE; DREDGE TENDER; WINCH OPERATOR (AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: REMAINDER. PLACER COUNTY: AREA 1: ALL BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. SISKIYOU COUNTY: AREA 1: CENTRAL PART, AREA 2: REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$54.53$39.55$94.08
DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING (4) BARGEMAN; DECKHAND; FIREMAN; LEVEEHAND; OILER (AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$51.23$39.55$90.78
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 - LANDSCAPE FINISH GRADE OPERATOR: ALL FINISH GRADE WORK REGARDLESS OF EQUIPMENT USED, AND ALL EQUIPMENT WITH A RATING MORE THAN 65 HP. (AREA DEFINITIONS - AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$55.85$28.56$84.41
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 - LANDSCAPE OPERATOR UP TO 65 HP; ALL EQUIPMENT WITH A MANUFACTURER'S RATING OF 65 HP OR LESS EXCEPT EQUIPMENT COVERED BY GROUP 1 OR GROUP 3. THE FOLLOWING EQUIPMENT SHALL BE INCLUDED EXCEPT WHEN USED FOR FINISH WORK AS LONG AS MANUFACTURER'S RATING IS 65 HP OR LESS; A-FRAME AND WINCH TRUCK, BACKHOE, FORKLIFT, HYDRAGRAPHIC SEEDER MACHINE, ROLLER, RUBBER-TIRED AND TRACK EARTHMOVING EQUIPMENT, SKIPLOADER, STRAW BLOWERS, AND TRENCHER 31 HP UP TO 65 HP. (AREA DEFINITIONS - AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. EL DORADO COUNTY: AREA 1: NORTH CENTRAL PART, AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, BUT THE CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$52.25$28.56$80.81
OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 - LANDSCAPE UTILITY OPERATOR; SMALL RUBBER-TIRED TRACTOR, TRENCHER UNDER 31 HP. (AREA DEFINITIONS - AREA 1: BUTTE, MARIN, NAPA, SACRAMENTO, SOLANO, SUTTER, YOLO, AND YUBA COUNTIES. COUNTIES SPLIT BETWEEN AREA 1 AND AREA 2 NOTED AS FOLLOWS: ALPINE COUNTY: AREA 1: NORTHERNMOST PART, AREA 2: REMAINDER. COLUSA COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. AREA 2: REMAINDER. GLENN COUNTY: AREA 1: EASTERN PART, AREA 2: REMAINDER. LASSEN COUNTY: AREA 1: WESTERN PART ALONG THE SOUTHERN PORTION OF BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER. NEVADA COUNTY: AREA 1: ALL BUT THE NORTHERN PORTION ALONG THE BORDER OF SIERRA COUNTY, AREA 2: CENTRAL PORTION, AREA 2: REMAINDER. PLUMAS COUNTY: AREA 1: WESTERN PORTION, AREA 2: REMAINDER. SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER, AREA 2: REMAINDER. SIERRA COUNTY: AREA 1: WESTERN PART, AREA 2: REMAINDER. REMAINDER. SONOMA COUNTY: AREA 1: ALL BUT THE NORTHWESTERN CORNER, AREA 2: REMAINDER. TEHAMA COUNTY: AREA 1: ALL BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES, AREA 2: REMAINDER. TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH SHASTA COUNTY, AREA 2: REMAINDER.)$47.64$28.56$76.20
IRONWORKER (ALPINE, LASSEN, MODOC, SISKIYOU, AND TRINITY COUNTIES)$43.75$34.45$78.20
LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON (AREA A: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES)$37.26$27.32$64.58
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I (AREA A: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES)$37.56$27.32$64.88
LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II (AREA A: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES)$35.06$27.32$62.38
TUNNEL AND SHAFT LABORERS: GROUP 1: DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN. LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)$45.89$27.72$73.61
LABORER: TRAFFIC CONTROL/LANE CLOSURE - ESCORT DRIVER, FLAG PERSON (MARIN COUNTY)$37.26$27.30$64.56
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON I - LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (MARIN COUNTY)$37.56$27.30$64.86
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON II - INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (MARIN COUNTY)$35.06$27.30$62.36
TUNNEL AND SHAFT LABORERS: GROUP 1 - DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (MARIN COUNTY)$45.89$27.72$73.61
TUNNEL AND SHAFT LABORERS: GROUP 2 - RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (MARIN COUNTY)$45.66$27.72$73.38
TUNNEL AND SHAFT LABORERS: GROUP 3 - BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (MARIN COUNTY)$45.41$27.72$73.13
TUNNEL AND SHAFT LABORERS: GROUP 4 - VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (MARIN COUNTY)$44.96$27.72$72.68
TUNNEL AND SHAFT LABORERS: GROUP 5 - GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (MARIN COUNTY)$44.42$27.72$72.14
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (MARIN COUNTY)$46.41$27.72$74.13
LABORER: MASON TENDER-BRICK (MARIN COUNTY)$37.54$25.55$63.09
LABORER: TRAFFIC CONTROL/LANE CLOSURE - ESCORT DRIVER, FLAG PERSON (NAPA, SOLANO, AND SONOMA COUNTIES)$36.26$27.30$63.56
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON I - LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. (NAPA, SOLANO, AND SONOMA COUNTIES)$36.56$27.30$63.86
LABORER: TRAFFIC CONTROL/LANE CLOSURE - TRAFFIC CONTROL PERSON II - INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH CUSHIONS. (NAPA, SOLANO, AND SONOMA COUNTIES)$34.06$27.30$61.36
TUNNEL AND SHAFT LABORERS: GROUP 1 - DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN (NAPA, SOLANO, AND SONOMA COUNTIES)$45.89$27.72$73.61
TUNNEL AND SHAFT LABORERS: GROUP 2 - RODMEN; SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL) (NAPA, SOLANO, AND SONOMA COUNTIES)$45.66$27.72$73.38
TUNNEL AND SHAFT LABORERS: GROUP 3 - BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUNNEL; CONCRETE SCREEDMAN; GROUT PUMPMAN AND POTMAN; GUNITE & SHOTCRETE GUNMAN & POTMAN; HEADERMEN; HIGH PRESSURE NOZZLEMAN; MINER - TUNNEL, INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK; NIPPER; NOZZLEMAN ON SLICK LINE; SANDBLASTER - POTMAN, ROBOTIC SHOTCRETE PLACER, SEGMENT ERECTOR, TUNNEL MUCK HAULER, STEEL FORM RAISER AND SETTER; TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREFORE); TUGGER (FOR TUNNEL LABORER WORK); CABLE TENDER; CHUCK TENDER; POWDERMAN - PRIMER HOUSE (NAPA, SOLANO, AND SONOMA COUNTIES)$45.41$27.72$73.13
TUNNEL AND SHAFT LABORERS: GROUP 4 - VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING, DUMPMEN (ANY METHOD) (NAPA, SOLANO, AND SONOMA COUNTIES)$44.96$27.72$72.68
TUNNEL AND SHAFT LABORERS: GROUP 5 - GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN (NAPA, SOLANO, AND SONOMA COUNTIES)$44.42$27.72$72.14
TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST (NAPA, SOLANO, AND SONOMA COUNTIES)$46.41$27.72$74.13
LABORER: MASON TENDER-BRICK (SOLANO AND SONOMA COUNTIES)$36.84$26.24$63.08
LABORER: CONSTRUCTION CRAFT LABORERS - GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; MECHANICAL PIPE LAYERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF POWER; BLASTER AND POWDER; ALL WORK OF LOADING, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE REGARDLESS OF METHOD USED FOR SUCH LOADING AND PLACING; HIGH SCALERS (INCLUDING DRILLING OF SAME); TREE TOPPER; BIT GRINDER. (SEWER CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. "SEWER CLEANER" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL RECENTLY ACTIVE SEWER MANHOLES SHAL RECEIVE $5.00 PER DAY ABOVE GROUP 1 WAGE RATES.) (MAINTENANCE AND REPAIR TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUND STRUCTURES NOT SPECIFICALLY COVERED HEREIN. THIS PARAGRAPH SHALL NOT BE CONSTRUED TO APPLY TO WORK BELOW GROUND LEVEL IN OPEN CUT. IT SHALL APPLY TO CUT AND COVER WORK OF SUBWAY CONSTRUCTION AFTER THE TEMPORARY COVER HAS BEEN PLACED.) (AREA B: NAPA, SOLANO, AND SONOMA COUNTIES)$35.72$27.30$63.02
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - ESTABLISHED WARRANTY PERIOD. (AREA B: NAPA, SOLANO, AND SONOMA COUNTIES)$28.94$27.30$56.24
LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - NEW CONSTRUCTION (AREA B: NAPA, SOLANO, AND SONOMA COUNTIES)$35.25$27.30$62.55
DRYWALL FINISHER/TAPER (ALPINE, BUTTE, COLUSA, EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS), GLENN, LASSEN (WEST OF HWY. 395, EXCLUDING HONEY LAKE); MARIN, MODOC, NAPA, NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS), PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS), PLUMAS, SACRAMENTO, SHASTA, SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS), SISKIYOU, SOLANO, SONOMA, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$59.63$31.29$90.92
SOFT FLOOR LAYER (MARIN, NAPA, SOLANO AND SONOMA COUNTIES)$59.00$33.03$92.03
GLAZIER (MARIN , NAPA & SONOMA COUNTIES; SOLANO COUNTY (WEST OF A LINE DEFINED AS FOLLOWS: HWY. 80 CORRIDOR BEGINNING AT THE CITY OF FAIRFIELD, INCLUDING TRAVIS AIR FORCE BASE AND SUISUN CITY; GOING NORTH OF MANAKAS CORNER RD., CONTINUE NORTH ON SUISUN VALLEY RD. TO THE NAPA COUNTY LINE; HWY. 80 CORRIDOR SOUTH ON GRIZZLY ISLAND RD. TO THE GRIZZLY ISLAND MANAGEMENT AREA))$56.22$34.00$90.22
SOFT FLOOR LAYER (EL DORADO COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS) AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS))$34.27$16.47$50.74
DRYWALL: (1) TAPER (EL DORADO COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS))$42.79$16.12$58.91
DRYWALL: (2) STEEPLEJACK - TAPER, OVER 40 FT WITH OPEN SPACE BELOW (EL DORADO COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); LASSEN COUNTY (EAST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); NEVADA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); PLACER COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS); AND SIERRA COUNTY (EAST OF THE SIERRA NEVADA MOUNTAINS))$44.29$16.12$60.41
SOFT FLOOR LAYER (ALPINE; COLUSA; EL DORADO (WEST OF THE SIERRA NEVADA MOUNTAINS); GLENN; LASSEN (WEST OF HIGHWAY 395, BEGINNING AT STACEY AND INCLUDING HONEY LAKE); MODOC; NEVADA (WEST OF THE SIERRA NEVADA MOUNTAINS); PLACER (WEST OF THE SIERRA NEVADA MOUNTAINS); PLUMAS; SACRAMENTO; SHASTA; SIERRA (WEST OF THE SIERRA NEVADA MOUNTAINS); SISKIYOU; SUTTER; TEHAMA; TRINITY; YOLO AND YUBA COUNTIES)$48.54$26.59$75.13
PLASTERER (AREA 355: NAPA & SONOMA COUNTIES)$32.70$31.68$64.38
PLUMBER, STEAMFITTER, REFRIGERATION FITTER (ALL OTHER WORK - NEW CONSTRUCTION RATE) (MARIN AND SONOMA COUNTIES)$91.00$49.40$140.40
PLUMBER, STEAMFITTER, REFRIGERATION FITTER (WORK ON WODDEN FRAM STRUCTURES 5 STORIES OR LESS EXCLUDING HIGH-RISE BUILDINGS AND COMMERCIAL WORK SUCH AS HOSPITALS, PRISONS, HOTELS, SCHOOLS, CASINOS, WASTEWATER TREATMENT PLANTS, AND RESEARCH FACILITIES AS WELL AS REFRIGERATION PIPEFITTING, SERVICE AND REPAIR WORK- MARKET RECOVERY RATE. (MARIN AND SONOMA COUNTIES)$69.70$46.38$116.08
LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER) (MARIN & SONOMA COUNTIES)$77.35$36.53$113.88
PLUMBER (BUTTE, COLUSA, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY & YUBA COUNTIES)$52.75$41.39$94.14
PLUMBER/PIPEFITTER (EL DORADO COUNTY (LAKE TAHOE AREA ONLY); NEVADA COUNTY (LAKE TAHOE AREA ONLY); AND PLACER COUNTY (LAKE TAHOE AREA ONLY))$52.14$18.71$70.85
ROOFER (MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$54.94$23.34$78.28
ROOFER (ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO, AND YUBA COUNTIES)$46.73$21.36$68.09
SPRINKLER FITTER (FIRE SPRINKLERS) (MARIN, NAPA, SOLANO, AND SONOMA COUNTIES)$81.54$41.35$122.89
SPRINKLER FITTER (ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, YOLO AND YUBA COUNTIES)$52.06$29.86$81.92
SHEET METAL WORKER: ALL OTHER WORK (MARIN, NAPA, SOLANO SONOMA & TRINITY COUNTIES)$86.31$46.75$133.06
SHEET METAL WORKER: MECHANICAL CONTRACTS $200,000 OR LESS (MARIN, NAPA, SOLANO SONOMA & TRINITY COUNTIES)$73.19$46.00$119.19
SHEET METAL WORKER (ALPINE COUNTY)$56.96$38.63$95.59
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY (BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, YOLO, AND YUBA COUNTIES)$44.45$35.55$80.00
SHEET METAL WORKER: METAL DECKING AND SIDING ONLY (MARIN, NAPA, SOLANO, SONOMA AND TRINITY COUNTIES)$44.45$35.55$80.00
SHEET METAL WORKER: MECHANICAL JOBS $200,000 & UNDER (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU, AND TEHAMA COUNTIES)$72.71$38.92$111.63
SHEET METAL WORKER: MECHANICAL JOBS OVER $200,000 (BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU, AND TEHAMA COUNTIES)$59.82$41.52$101.34

Residential CA20260029 rev 2

ClassificationRateFringeTotal
IRONWORKER (AMADOR, CALVERAS AND MARIPOSA COUNTIES)$50.70$35.15$85.85
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$57.06$42.15$99.21
CARPENTER$29.28$0.00$29.28
CEMENT MASON/CONCRETE FINISHER$27.66$9.50$37.16
ELECTRICIAN$31.70$9.70$41.40
LABORER: COMMON OR GENERAL$20.49$0.00$20.49
PAINTER (BRUSH AND ROLLER)$26.37$9.81$36.18
PLUMBER$23.06$11.81$34.87
ROOFER$23.00$0.00$23.00
Scoped to other counties 1 classifications in CA20260029 that name counties other than Amador
ClassificationRateFringeTotal
IRONWORKER (ALPINE, INYO AND MONO COUNTIES)$43.75$34.45$78.20

Get an email when rates change here

One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.

Recent rate changes here

CA20260007 rev 4 → 5 · published 2026-09-03 · 6 rate changes, 46 added, 28 removed diff
CA20260029 rev 1 → 2 · published 2026-09-03 · 1 rate change diff
CA20260023 rev 0 → 1 · published 2026-05-18 · 5 rate changes diff
CA20260007 rev 3 → 4 · published 2026-05-18 · 4 rate changes, 6 added, 32 removed diff
CA20260007 rev 1 → 2 · published 2026-01-23 · 1 rate change diff

All recent changes across covered states

California state prevailing wages (state-funded projects)

Public works funded by the State of California use these DIR determinations instead of the federal Davis-Bacon rates above. Totals are the full hourly package including employer payments; rates past an expiration date have a predetermined increase on file.

CraftClassificationAreaBasicTotalExpires
#TRAFFIC CONTROL/LANE CLOSURE (LABORER)TRAFFIC CONTROL AND RELATED CLASSIFICATIONS Traffic Control Person IArea 1$41.71$74.022027-06-30
Traffic Control Person IIArea 1$39.21$71.52
Construction Zone Traffic Control Pilot Car, Flag PersonArea 1$41.41$73.72
TRAFFIC CONTROL AND RELATED CLASSIFICATIONS Traffic Control Person IArea 2$40.71$73.02
Traffic Control Person IIArea 2$38.21$70.52
Construction Zone Traffic Control Pilot Car, Flag PersonArea 2$40.41$72.72
STRIPER AND RELATED CLASSIFICATIONS Group 1$44.60$76.27
Group 2$43.10$74.77
Group 3$41.35$73.02
Group 4$39.25$70.92
Asbestos Removal Worker (Laborer)Asbestos and Lead Removal Worker (Area 1)$40.65$72.962027-06-30
Asbestos and Lead Removal Worker (Area 2)$39.65$71.96
Asbestos Worker, Heat and Frost InsulatorMechanic (Zone 1)$98.16$125.972027-08-01
Mechanic (Zone 2)$74.91$102.72
Basic Health Pension Vacation Training Otherk Hours h Total Overtime Overtime (Journeyperson) Rate g (1 ½ X) i (2 X) j Hazardous Material Handler Worker (Zone 1)$46.69$72.96
Hazardous Material Handler Worker (Zone 2)$45.69$71.96
Building/Construction Inspector and Field Soils and Material TesterClassification a Basic Health Pension Vacation/ Training Other Hours Total Daily Saturday Sunday/Holiday (Journeyperson) Hourly and Holiday Payments HourlyOvertime Overtime Overtime Group 1$65.89$101.992027-06-30
Group 2$63.89$99.99
Group 3$55.70$91.80
Group 4 Building/Construction Inspector and Field Soils and Material Tester$48.91$85.01
Classificationa Basic Health Pension Vacation/ Training Other Hours Total Daily Saturday Sunday/Holiday (Journeyperson) Hourly and Holiday Payments Hourly Overtime Overtime Overtime Group Rate Welfareb Rate Hourly Hourly Hourly Rate Group 1$74.13$110.23
Group 2$71.88$107.98
Group 3$62.66$98.76
Group 4 Building/Construction Inspector and Field Soils and Material Tester$55.02$91.12
CarpenterCarpenter (Area Hardwood$70.26$109.412027-06-30
And Steel Shoring Erector Carpenter (Area$64.38$103.53
And Steel Shoring Erector Carpenter (Area Hardwood$64.38$103.53
And Steel Shoring Erector Carpenter (Area Hardwood$63.03$102.18
Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel ScaffoldArea 4$63.18$102.33
Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel ScaffoldArea 4$67.39$106.54
Floorlayer, Power Saw Operator, Saw Filer, Shingler, Steel ScaffoldArea 4$72.21$111.36
Bridge Builder/ Highway Carpenter$70.26$109.41
Bridge Builder/ Highway Carpenter (Special Single$79.04$118.19
Millwright$66.88$107.63
MillwrightArea 4$65.53$106.28
Millwright MillwrightArea 4$71.34$112.09
MillwrightArea 4$74.89$115.64
Cement MasonCement Mason Mastic Magnesite Gypsum,$51.35$83.562027-06-30
composition masons, swing or$52.35$84.56
Cement Mason Mastic Magnesite Gypsum,$54.35$86.56
composition masons, swing or$55.35$87.56
DREDGER OPERATING ENGINEERGroup 1Area 1$62.61$106.672026-07-31
Group 2Area 1$57.65$101.71
Group 3Area 1$56.53$100.59
Group 4Area 1$53.23$97.29
Group 1Area 2$64.61$108.67
Group 2Area 2$59.65$103.71
Group 3Area 2$58.53$102.59
Group 4Area 2$55.23$99.29
Group 1Area 1 – Special Single & Second Shift$70.44$114.50
Group 2Area 1 – Special Single & Second Shift$64.86$108.92
Group 3Area 1 – Special Single & Second Shift$63.60$107.66
Group 4Area 1 – Special Single & Second Shift$59.88$103.94
Group 1Area 2 – Special Single & Second Shift$72.44$116.50
Group 2Area 2 – Special Single & Second Shift$66.86$110.92
Group 3Area 2 – Special Single & Second Shift$65.60$109.66
Group 4Area 2 – Special Single & Second Shift$61.88$105.94
Driver (On/Off-Hauling To/From Construction Site)Driver: Dump Truck $0 8.0 $20.94 $29.44 c$17.00$0.002021-03-31
DRIVER (ON/OFF-HAULING TO/FROM CONSTRUCTION SITE)Driver: Mixer Truck$20.10$24.202021-03-31
Drywall Installer/Lather (Carpenter)Stocker/Scrapper (Area 1) d$35.13$65.262027-06-30
Stocker/Scrapper (Area 2)d$32.19$62.32
Stocker/Scrapper (Area 3)d$32.44$62.57
Drywall Installer/LatherArea 4$63.53$104.05
Stocker/Scrapper (Area 4)d$31.77$61.90
Stocker/ScrapperArea 4$31.77$56.22
Drywall Installer/LatherArea 4$67.77$108.29
Stocker/ScrapperArea 4$33.89$58.34
Drywall Installer/LatherArea 4$72.61$113.13
Stocker/ScrapperArea 4$36.31$60.76
Elevator ConstructorMechanic Mechanic (Employed in$87.48$133.622026-12-31
industry more than 5 years)$87.48$135.37
Helper e Helper (Employed in$61.24$105.80
industry more than 5 years)$61.24$107.03
Iron WorkerIron Worker (Ornamental, Reinforcing, Structural)Area 5$51.85$90.972026-12-31
Fence Erector (All Areas)$46.50$74.95
Landscape/Irrigation LaborerLandscape/Irrigation Technician I # d$39.11$77.832027-06-30
Landscape/Irrigation Technician II d$29.56$58.50
Landscape/Irrigation Technician III d$27.31$55.01
Landscape/Irrigation Technician IV d$23.90$49.89
Metal Roofing Systems InstallerAmador County: Metal Roofing Systems Installer$20.41$32.99
El Dorado County: Metal Roofing Systems Installer$18.81$30.64
Modular Furniture Installer (Carpenter)Master Installer (Area 1) d$47.47$77.342027-06-30
Lead Installer (Area 1)d$43.25$73.12
Installer (Area 1)d$39.80$69.17
Master Installer (Area 2)d$43.75$73.62
Lead Installer (Area 2)d$40.12$69.99
Installer (Area 2)d$37.15$66.52
Master Installer (Area 3)d$42.42$72.29
Lead Installer (Area 3)d$39.00$68.87
Installer (Area 3)d$36.20$65.57
Operating Engineer (Landscape Construction)Group IArea 1$59.26$92.472027-06-27
Group IIArea 1$55.66$88.87
Group IIIArea 1$51.05$84.26
Group IVArea 1$48.34$81.55
Group IArea 2$61.26$94.47
Group IIArea 2$57.66$90.87
Group IIIArea 2$53.05$86.26
Group IVArea 2$50.34$83.55
Group IArea 1$66.26$99.47
Group IIArea 1$62.66$95.87
Group IIIArea 1$58.05$91.26
Group IVArea 1$55.34$88.55
Group 1Area 2$68.26$101.47
Group 2Area 2$64.66$97.87
Group 3Area 2$60.05$93.26
Group 4Area 2$57.34$90.55
Pile Driver (Carpenter)Pile Driver, Wharf, and Dock Buildere$69.51$111.872027-06-30
Diver (wet) up to 50 ft depth f g$119.03$161.39
Diver’s Tenderf$76.46$118.82
Assistant Tender$69.51$111.87
Diver (stand-by)$77.46$119.82
Slurry Seal Worker (Laborer)Basic Health Pension Vacation Training Hours Total Daily Saturday Sunday/Holiday Mixer Operator$46.87$76.422027-06-30
Shuttle/Line Driver$40.87$70.42
Squeegee/Sealer$39.37$68.92
Utility-Maintenance Man$38.37$67.92
STEEL ERECTOR AND FABRICATOR (OPERATING ENGINEER-BUILDING CONSTRUCTION) #aTruck Crane Assistant to Engineer$63.75$100.042027-06-27
Assistant to Engineer$61.61$97.90
Group 2$69.03$105.32
Truck Crane Assistant to Engineer$63.53$99.82
Assistant to Engineer$61.36$97.65
Group 3$67.64$103.93
Truck Crane Assistant to Engineer$63.28$99.57
Hydraulic$62.90$99.19
Assistant to Engineer$61.13$97.42
Group 4$65.71$102.00
Group 5$64.46$100.75
(Special Single and Second Shift) Group A-1$78.49$114.78
Truck Crane Assistant to Engineer$71.50$107.79
Assistant to Engineer$69.36$105.65
Group 1$77.74$114.03
Truck Crane Assistant to Engineer$70.75$107.04
Assistant to Engineer$68.61$104.90
Group 2$76.03$112.32
(Special Single and Second Shift) Truck Crane Assistant to Engineer$70.53$106.82
Assistant to Engineer$68.36$104.65
Group 3$74.64$110.93
Truck Crane Assistant to Engineer$70.28$106.57
Hydraulic$69.90$106.19
Assistant to Engineer$68.13$104.42
Group 4$72.71$109.00
Group 5$71.46$107.75
Group A-1$71.49$107.78
Truck Crane Assistant to Engineer$64.50$100.79
Assistant to Engineer$62.36$98.65
Group 1$70.74$107.03
STEEL ERECTOR AND FABRICATOR (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK) #aGroup A-1$72.97$109.262027-06-27
Truck Crane Assistant to Engineer$65.65$101.94
Assistant to Engineer$63.42$99.71
Group 1$72.22$108.51
Truck Crane Assistant to Engineer$64.90$101.19
Assistant to Engineer$62.67$98.96
Group 2$70.45$106.74
Truck Crane Assistant to Engineer$64.68$100.97
Assistant to Engineer$62.40$98.69
Group 3$68.97$105.26
Truck Crane Assistant to Engineer$64.41$100.70
Hydraulic$64.02$100.31
Assistant to Engineer$62.18$98.47
Group 4$66.95$103.24
Group 5$65.65$101.94
(Special Single and Second Shift) Group A-1$79.97$116.26
Truck Crane Assistant to Engineer$72.65$108.94
Assistant to Engineer$70.42$106.71
Group 1$79.22$115.51
Truck Crane Assistant to Engineer$71.90$108.19
Assistant to Engineer$69.67$105.96
Group 2$77.45$113.74
Truck Crane Assistant to Engineer$71.68$107.97
(Special Single and Second Shift) Assistant to Engineer$69.40$105.69
Group 3$75.97$112.26
Truck Crane Assistant to Engineer$71.41$107.70
Hydraulic$71.02$107.31
Assistant to Engineer$69.18$105.47
Group 4$73.95$110.24
Group 5$72.65$108.94
Tree Maintenance (Laborer) 1Classification(s) a Rate Welfare Holiday Rate Hourly Overtime Senior Tree Trimmer (Area 1)c$32.40$44.572027-06-30
Tree Trimmer (Area 1)c$29.20$41.37
Groundsperson (Area 1)c$26.05$38.22
Senior Tree Trimmer (Area 2)c$27.90$40.07
Tree Trimmer (Area 2)c$26.20$38.37
Groundsperson (Area 2)c$24.05$36.22
Tree Trimmer (High Voltage Line Clearance)Basic Health Pension b Vacation Holiday Training Otherc Hours Total Daily/Saturday/ Tree Trimmer$45.37$67.132026-12-31
Trimmer Trainee: Start (0-6 Months)$31.76$49.18
Trimmer Trainee: 6-12 Months$36.30$55.17
Trimmer Trainee: After 12 Months$40.84$61.16
Ground person First 6 Months$27.22$38.59
Ground person After 6 Months$29.49$41.67
TUNNEL/UNDERGROUND (OPERATING ENGINEER-HEAVY AND HIGHWAY WORK)Classification Group a Rate Welfare Holiday b (1½ x) d (2 x) Underground Rate Group 1-AArea 1$68.84$105.132027-06-27
Underground Rate Group 1Area 1$66.37$102.66
Underground Rate Group 2Area 1$65.11$101.40
Underground Rate Group 3Area 1$63.78$100.07
Underground Rate Group 4Area 1$62.64$98.93
Underground Rate Group 5Area 1$61.50$97.79
Shafts Stopes & Raises Group 1-AArea 1$68.94$105.23
Classification Group a (1½ x) d (2 x) Shafts Stopes & Raises Group 1Area 1$66.47$102.76
Shafts Stopes & Raises Group 2Area 1$65.21$101.50
Shafts Stopes & Raises Group 3Area 1$63.88$100.17
Shafts Stopes & Raises Group 4Area 1$62.74$99.03
Shafts Stopes & Raises Group 5Area 1$61.60$97.89
Classification Groupa (1½ x)d (2 x) Underground Rate Group 1-AArea 2$70.84$107.13
Underground Rate Group 1Area 2$68.37$104.66
Underground Rate Group 2Area 2$67.11$103.40
Underground Rate Group 3Area 2$65.78$102.07
Underground Rate Group 4Area 2$64.64$100.93
Underground Rate Group 5Area 2$63.50$99.79
Shafts Stopes & Raises Group 1-AArea 2$70.94$107.23
Shafts Stopes & Raises Group 1Area 2$68.47$104.76
Shafts Stopes & Raises Group 2Area 2$67.21$103.50
Shafts Stopes & Raises Group 3Area 2$65.88$102.17
Shafts Stopes & Raises Group 4Area 2$64.74$101.03
Shafts Stopes & Raises Group 5Area 2$63.60$99.89
(Special Single and Second Shift) Classification Groupa (1½ x)d (2 x) Underground Rate Group 1-AArea 1$75.84$112.13
Underground Rate Group 1Area 1$73.37$109.66
Underground Rate Group 2Area 1$72.11$108.40
Underground Rate Group 3Area 1$70.78$107.07
Underground Rate Group 4Area 1$69.64$105.93
(Special Single and Second Shift) Classification Groupa (1½ x)d (2 x) Underground Rate Group 5Area 1$68.50$104.79
Shafts Stopes & Raises Group 1-AArea 1$75.94$112.23
Shafts Stopes & Raises Group 1Area 1$73.47$109.76
Shafts Stopes & Raises Group 2Area 1$72.21$108.50
Shafts Stopes & Raises Group 3Area 1$70.88$107.17
Shafts Stopes & Raises Group 4Area 1$69.74$106.03
Shafts Stopes & Raises Group 5Area 1$68.60$104.89
(Special Single and Second Shift) Hourly Classification Groupa Rate (1½ (2 x) x)d Underground Rate Group 1-AArea 2$77.84$114.13
Underground Rate Group 1Area 2$75.37$111.66
Underground Rate Group 2Area 2$74.11$110.40
Underground Rate Group 3Area 2$72.78$109.07
Underground Rate Group 4Area 2$71.64$107.93
Underground Rate Group 5Area 2$70.50$106.79
Shafts Stopes & Raises Group 1-AArea 2$77.94$114.23
Shafts Stopes & Raises Group 1Area 2$75.47$111.76
Shafts Stopes & Raises Group 2Area 2$74.21$110.50
Shafts Stopes & Raises Group 3Area 2$72.88$109.17
Shafts Stopes & Raises Group 4Area 2$71.74$108.03
Shafts Stopes & Raises Group 5Area 2$70.60$106.89

Craft names link to the official DIR determination PDF. Apprentice rates, shift differentials, travel, and subsistence provisions are in the linked determinations.