Bricklayer prevailing wages: California, county by county

33 current bricklayer rates across 20 active California wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.

County / areaClassificationRateFringeTotalDetermination
AmadorBRICKLAYER, STONEMASON$17.57$4.04$21.61CA20260023 Building
Del Norte + 3 moreBRICKLAYER SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE$57.02$28.50$85.52CA20260004 Heavy, Highway
Del Norte + 3 moreBRICKLAYER, STONEMASON$22.45$8.60$31.05CA20260005 Building
ImperialBRICKLAYER; MARBLE SETTER$58.81$19.14$77.95CA20260002 Building, Heavy, Highway
Lassen + 23 moreBRICKLAYER (SPECIALTY PAY: A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE.) (AREA 1: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHAMA, YOLO AND YUBA COUNTIES)$52.76$25.01$77.77CA20260007 Building, Heavy, Highway
Lassen + 23 moreBRICKLAYER (SPECIALTY PAY: A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE.) (AREA 2: MARIN, NAPA, SISKIYOU, SOLANO, SONOMA, AND TRINITY COUNTIES)$57.02$28.50$85.52CA20260007 Building, Heavy, Highway
Los AngelesBRICKLAYER; MARBLE SETTER$45.53$20.29$65.82CA20260022 Building, Heavy, Highway
Los Angeles + 7 moreBRICKLAYER; MARBLE SETTER (IMPERIAL)$58.81$19.14$77.95CA20260017 Residential
Los Angeles + 7 moreBRICKLAYER; MARBLE SETTER (LOS ANGELES COUNTY)$50.07$20.29$70.36CA20260017 Residential
Los Angeles + 7 moreBRICKLAYER; MARBLE SETTER (ORANGE COUNTY)$50.07$20.29$70.36CA20260017 Residential
Los Angeles + 7 moreBRICKLAYER; MARBLE SETTER (RIVERSIDE & SAN BERNARDINO COUNTIES)$50.07$20.29$70.36CA20260017 Residential
Los Angeles + 7 moreBRICKLAYER; MARBLE SETTER (SAN LUIS OBISPO AND SANTA BARBARA COUNTIES)$50.07$20.29$70.36CA20260017 Residential
Los Angeles + 7 moreBRICKLAYER; MARBLE SETTER (VENTURA COUNTY)$50.07$20.29$70.36CA20260017 Residential
Madera + 16 moreBRICKLAYER ( 1) FRESNO, KINGS, MADERA, MARIPOSA, MERCED$51.17$25.80$76.97CA20260018 Building, Heavy, Highway
Madera + 16 moreBRICKLAYER ( 7) SAN FRANCISCO, SAN MATEO$57.02$28.50$85.52CA20260018 Building, Heavy, Highway
Madera + 16 moreBRICKLAYER ( 9) CALAVERAS, SAN JOAQUIN, STANISLAUS, TOULUMNE$52.76$25.01$77.77CA20260018 Building, Heavy, Highway
Madera + 16 moreBRICKLAYER (16) MONTEREY, SANTA CRUZ$54.18$27.82$82.00CA20260018 Building, Heavy, Highway
Madera + 16 moreBRICKLAYER (8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA)$56.94$26.28$83.22CA20260018 Building, Heavy, Highway
Madera + 6 moreBRICKLAYER$17.00$1.12$18.12CA20260009 Residential
Mono, Kern, InyoBRICKLAYER; MARBLE SETTER$45.53$20.29$65.82CA20260020 Building, Heavy, Highway
Monterey + 17 moreBRICKLAYER: ( 7) MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SOLANO, SONOMA SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) ABOVE THE REGULAR RATE$57.02$28.50$85.52CA20260019 Residential
Monterey + 17 moreBRICKLAYER: ( 8) ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE$56.94$26.28$83.22CA20260019 Residential
Monterey + 17 moreBRICKLAYER: ( 9) EL DORADO, PLACER, SACRAMENTO, SUTTER SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE$52.76$25.01$77.77CA20260019 Residential
Monterey + 17 moreBRICKLAYER: (16) MONTEREY, SANTA CRUZ SPECIALTY PAY: (A) UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CONDUIT SHALL BE PAID $1.25 PER HOUR ABOVE THE REGULAR RATE. WORK IN DIRECT CONTACT WITH RAW SEWAGE SHALL RECEIVE $1.25 PER HOUR IN ADDITION TO THE ABOVE. (B) OPERATING A SAW OR GRINDER SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE. (C) GUNITE NOZZLE PERSON SHALL RECEIVE $1.25 PER HOUR ABOVE THE REGULAR RATE$54.18$27.82$82.00CA20260019 Residential
OrangeBRICKLAYER; MARBLE SETTER$45.53$20.29$65.82CA20260024 Building, Heavy, Highway
RiversideBRICKLAYER; MARBLE SETTER$45.53$20.29$65.82CA20260025 Building, Heavy, Highway
San BernardinoBRICKLAYER; MARBLE SETTER$45.53$20.29$65.82CA20260026 Building, Heavy, Highway
San DiegoBRICKLAYER; MARBLE SETTER$46.73$19.02$65.75CA20260001 Building, Heavy, Highway, Residential
San Luis ObispoBRICKLAYER; MARBLE SETTER$45.53$20.29$65.82CA20260012 Building, Heavy, Highway
Santa BarbaraBRICKLAYER; MARBLE SETTER$45.53$20.29$65.82CA20260014 Building, Heavy, Highway
TulareBRICKLAYER$15.18$0.00$15.18CA20260016 Building
TulareBRICKLAYER; MARBLE SETTER$45.53$20.29$65.82CA20260021 Heavy, Highway
VenturaBRICKLAYER; MARBLE SETTER$50.07$20.29$70.36CA20260015 Building, Heavy, Highway

Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All California trades.