Ironworker prevailing wages: South Dakota, county by county
30 current ironworker rates across 29 active South Dakota wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Aurora | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260004 Building |
| Beadle + 15 more | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260021 Building |
| Bennett + 65 more | IRONWORKER: Group 1 - Position and secure steel bars or mesh in concrete for reinforcement, steel tyers, saw. Carrying, placing, tying, reinforcing steel under supervision, cutting. Placing steel or prefabricated reinforcement assembly for placement in concrete forms | $26.93 | $0.00 | $26.93 | SD20260001 Heavy, Highway |
| Bennett + 65 more | IRONWORKER: Group 2 - Erect, place and join steel girders, columns, structural framework, air wrenches, spud bars, grinders, drills, sledgehammers, tag lines, plumb bobs, lasers, levels, bolts, wire, welds, shears, rod-bending machines | $28.97 | $0.00 | $28.97 | SD20260001 Heavy, Highway |
| Bennett + 8 more | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260022 Building |
| Bon Homme + 9 more | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260023 Building |
| Brookings | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260005 Building |
| Brown | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260006 Building |
| Buffalo | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260007 Building |
| Butte | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260008 Building |
| Campbell | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260009 Building |
| Charles Mix | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260010 Building |
| Codington | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260011 Building |
| Corson + 5 more | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260024 Building |
| Custer | IRONWORKER, STRUCTURAL | $23.91 | $12.05 | $35.96 | SD20260025 Building |
| Dewey | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260012 Building |
| Haakon | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260013 Building |
| Harding | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260014 Building |
| Hughes | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260015 Building |
| Lawrence | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260016 Building |
| Lincoln | IRONWORKER, STRUCTURAL | $23.91 | $12.05 | $35.96 | SD20260026 Building |
| McCook, Turner | IRONWORKER, STRUCTURAL | $23.91 | $12.05 | $35.96 | SD20260031 Building |
| Meade | IRONWORKER, STRUCTURAL | $23.91 | $12.05 | $35.96 | SD20260027 Building |
| Minnehaha | IRONWORKER, STRUCTURAL | $23.91 | $12.05 | $35.96 | SD20260028 Building |
| Oglala Lakota | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260017 Building |
| Pennington | IRONWORKER, STRUCTURAL | $23.91 | $12.05 | $35.96 | SD20260029 Building |
| Todd | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260018 Building |
| Union | IRONWORKER, STRUCTURAL | $23.91 | $12.05 | $35.96 | SD20260030 Building |
| Walworth | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260019 Building |
| Yankton | IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | SD20260020 Building |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All South Dakota trades.