Building construction wages: Minnehaha, South Dakota
Wage determination SD20260028 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/SD20260028 on · latest revision 2 · verify at sam.gov/wage-determination/SD20260028/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-16 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $41.90 | $4.94 | $46.84 |
| CARPENTER (DRYWALL FINISHING/TAPING, DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $36.34 | $17.15 | $53.49 |
| ELECTRICIAN | $36.32 | $16.83 | $53.15 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| PIPEFITTER | $34.90 | $15.70 | $50.60 |
| TRUCK DRIVER: DUMP TRUCK | $15.06 | $1.10 | $16.16 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.28 | $7.63 | $26.91 |
| ROOFER | $13.82 | $1.34 | $15.16 |
| PLUMBER | $21.12 | $9.00 | $30.12 |
| PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING | $23.61 | $17.90 | $41.51 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.90 | $0.00 | $17.90 |
| LABORER: MASON TENDER - BRICK | $20.96 | $0.00 | $20.96 |
| LABORER: COMMON OR GENERAL | $16.21 | $2.21 | $18.42 |
| IRONWORKER, STRUCTURAL | $23.91 | $12.05 | $35.96 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $15.20 | $0.00 | $15.20 |
| CEMENT MASON/CONCRETE FINISHER | $17.54 | $2.65 | $20.19 |
| CARPENTER (EXCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING AND METAL STUD INSTALLATION) | $17.61 | $8.53 | $26.14 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.