Building construction wages: Beadle + 15 more counties, South Dakota
Wage determination SD20260021 · Active · Standard
BeadleClarkDayDeuelEdmundsFaulkGrantHamlinHandHydeJerauldKingsburyMarshallMcPhersonRobertsSpink
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-16 | original |
Current rates (rev 2) · download CSV · print this page for your bid file
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $55.34 | $34.03 | $89.37 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $36.34 | $17.15 | $53.49 |
| ELECTRICIAN | $36.32 | $16.83 | $53.15 |
| ELEVATOR MECHANIC | $56.30 | $38.44 | $94.74 |
| POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM TO THE TOP OF THE SHEAVE OR JIB SHEAVE. TOWER CRANE PREMIUM: FROM THE TOP OF THE TOWER CRANE FOUNDATION TO THE TOP OF THE TOWER CRANE APEX. IN THE CASE OF LUFFING CRANES, TO THE TOP OF GANTRY, PLUS BOOM LENGTH PER CLASSIFICATION: 250' TO 299' - $1.00 300' TO 349 - $1.50 350' TO 399' - $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 | $34.08 | $18.71 | $52.79 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM TO THE TOP OF THE SHEAVE OR JIB SHEAVE. TOWER CRANE PREMIUM: FROM THE TOP OF THE TOWER CRANE FOUNDATION TO THE TOP OF THE TOWER CRANE APEX. IN THE CASE OF LUFFING CRANES, TO THE TOP OF GANTRY, PLUS BOOM LENGTH PER CLASSIFICATION: 250' TO 299' - $1.00 300' TO 349 $2.50 450' AND OVER - $3.00 | $34.38 | $18.71 | $53.09 |
| IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 |
| CEMENT MASON/CONCRETE FINISHER | $33.01 | $15.08 | $48.09 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $30.93 | $17.22 | $48.15 |
| ROOFER | $14.52 | $2.09 | $16.61 |
| PLUMBER | $19.02 | $5.20 | $24.22 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $19.22 | $0.00 | $19.22 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | $0.00 | $16.14 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | $0.00 | $19.34 |
| LABORER: MASON TENDER - BRICK | $14.19 | $0.00 | $14.19 |
| LABORER: COMMON OR GENERAL | $11.45 | $2.28 | $13.73 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $17.28 | $3.37 | $20.65 |
| BRICKLAYER | $31.88 | $1.83 | $33.71 |