Carbon County, Pennsylvania: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building PA20260081 rev 3
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 | $69.81 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
| MASON - STONE | $33.24 | $17.78 | $51.02 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $33.24 | $17.78 | $51.02 |
| TILE SETTER | $31.12 | $21.11 | $52.23 |
| TILE FINISHER | $30.20 | $16.41 | $46.61 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FIRESTOPPING, FORM WORK, METAL FLASHING INSTALLATION, METAL ROOF INSTALLATION, SCAFFOLD BUILDING (EXCLUDING MASONRY/BRICK), SIDING INSTALLATION- METAL, ALUMINUM AND VINYL; EXCLUDING FLOOR LAYING- HARDWOOD, CARPET AND VINYL) | $39.74 | $28.09 | $67.83 |
| MILLWRIGHT | $51.22 | $36.72 | $87.94 |
| CARPENTER (FLOOR LAYING- HARDWOOD, CARPET AND VINYL ONLY) | $41.23 | $29.79 | $71.02 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, LOW VOLTAGE WIRING, AND SOLAR PANEL WIRING AND INSTALLATION) | $50.00 | $25.93 | $75.93 |
| ELEVATOR MECHANIC | $61.41 | $38.44 | $99.85 |
| POWER EQUIPMENT OPERATOR (PUMP) | $28.36 | $18.10 | $46.46 |
| POWER EQUIPMENT OPERATOR: ROLLER | $31.09 | $22.35 | $53.44 |
| POWER EQUIPMENT OPERATOR: CRANE | $37.49 | $24.23 | $61.72 |
| POWER EQUIPMENT OPERATOR (OILER) | $29.77 | $21.95 | $51.72 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | $32.23 | $22.68 | $54.91 |
| POWER EQUIPMENT OPERATOR (COMPRESSOR) | $31.09 | $22.35 | $53.44 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID/STEER/SKID LOADER,BOOM, BULLDOZER, CONCRETE PUMP, HOIST (WITH TWO TOWERS), MECHANIC, ROLLER (HIGH GRADE FINISHING), DRILL RIG CAISSONS, HEAT PLANER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $34.96 | $23.48 | $58.44 |
| IRONWORKER: ORNAMENTAL | $37.26 | $32.63 | $69.89 |
| LABORER (PLASTER TENDER) | $26.74 | $17.34 | $44.08 |
| LABORER (FORKLIFT (MASONRY WORK ONLY); SCAFFOLD BUILDER (BRICK AND MASONRY); MASON TENDER-BRICK) | $26.74 | $17.34 | $44.08 |
| LABORER (CONCRETE WORKER; TAMPER (HAND HELD)) | $25.39 | $17.34 | $42.73 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $26.45 | $16.30 | $42.75 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $27.01 | $16.30 | $43.31 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $59.65 | $42.78 | $102.43 |
| PLUMBER (HVAC MECHANIC- HVAC TEMPERATURE CONTROLS INSTALLATION ONLY) | $59.65 | $42.78 | $102.43 |
| PLUMBER | $56.28 | $35.51 | $91.79 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $40.33 | $32.62 | $72.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 |
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION | $43.09 | $42.52 | $85.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $36.13 | $30.32 | $66.45 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | $18.37 | $51.38 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 |
| OPERATOR: DRILL | $28.55 | $15.78 | $44.33 |
| LABORER: COMMON OR GENERAL | $23.55 | $8.67 | $32.22 |
| IRONWORKER, STRUCTURAL | $33.55 | $21.92 | $55.47 |
| IRONWORKER, REINFORCING | $26.24 | $14.49 | $40.73 |
| GLAZIER | $29.22 | $15.73 | $44.95 |
| CEMENT MASON/CONCRETE FINISHER | $24.55 | $16.19 | $40.74 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.89 | $19.81 | $47.70 |
Heavy PA20260018 rev 5
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
| BRICKLAYER (CARBON AND LEHIGH COUNTIES) | $32.14 | $17.81 | $49.95 |
| MARBLE & TILE SETTER (MONROE AND NORTHAMPTON COUNTIES) | $31.18 | $18.35 | $49.53 |
| MARBLE & TILE SETTER (ADAMS, BRADFORD, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LYCOMING, MONTOUR, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) | $32.85 | $17.56 | $50.41 |
| BRICKLAYER, STONEMASON (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, LEBANON, PERRY, UNION, AND YORK COUNTIES) | $33.99 | $16.87 | $50.86 |
| BRICKLAYER, STONEMASON (LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING COUNTIES) | $37.07 | $18.82 | $55.89 |
| MARBLE & TILE SETTER (LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $35.13 | $16.52 | $51.65 |
| BRICKLAYER (BERKS COUNTY) | $37.83 | $16.98 | $54.81 |
| MARBLE & TILE SETTER (BERKS COUNTY) | $33.61 | $16.80 | $50.41 |
| BRICKLAYER, STONEMASON (COLUMBIA, MONTOUR, NORTHUMBERLAND, JUNIATA, MIFFLIN, SCHUYLKILL, SNYDER AND SULLIVAN COUNTIES) | $32.66 | $21.58 | $54.24 |
| BRICKLAYER (BRADFORD, TIOGA, LYCOMING AND UNION COUNTIES) | $34.17 | $17.20 | $51.37 |
| TERRAZZO WORKER/SETTER | $32.91 | $20.11 | $53.02 |
| TERRAZZO FINISHER | $32.26 | $18.48 | $50.74 |
| MARBLE & TILE SETTER (CARBON AND LEHIGH COUNTIES) | $31.12 | $21.11 | $52.23 |
| BRICKLAYER (MONROE AND NORTHAMPTON COUNTIES) | $37.07 | $18.82 | $55.89 |
| CARPENTER & SOFT FLOOR LAYER (MONTOUR, NORTHUMBERLAND, SNYDER AND UNION COUNTIES) | $27.03 | $11.43 | $38.46 |
| CARPENTER & SOFT FLOOR LAYER (COLUMBIA, SCHUYLKILL, AND LOWER PART OF LUZERNE COUNTY; IN CARBON COUNTY BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TOWNSHIPS AND THAT PART OF PENN FOREST TOWNSHIP, NORTH OF ROUTE 903) | $27.03 | $11.43 | $38.46 |
| PILEDRIVERMAN (LEHIGH AND NORTHAMPTON COUNTIES) | $43.45 | $34.47 | $77.92 |
| CARPENTER (YORK COUNTY) | $27.03 | $11.43 | $38.46 |
| ELECTRICIAN (BERKS COUNTY (REMAINDER)) | $46.02 | $27.98 | $74.00 |
| ELECTRICIAN (REMAINDER OF LANCASTER COUNTY) | $46.02 | $27.98 | $74.00 |
| MILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMENSING, PENN FOREST. EVERYTHING SOUTH OF ROUTE 903 AND EAST TO THE KIDDER TOWNSHIP LINE. BOROUGHS: HAUTO, NESQUEHONING, LANSFORD, SUMMIT HILL, JIM THORPE, WEISSPORT, BOWNMANSTOWN, PALMERTON, LEHIGHTON, AND PARRYVILLE) , LEHIGH AND NORTHAMPTON COUNTIES) | $50.22 | $35.03 | $85.25 |
| CARPENTER & SOFT FLOOR LAYER (LACKAWANNA, MONROE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING (EAST OF SUSQUEHANNA RIVER) COUNTIES) | $25.60 | $12.85 | $38.45 |
| PILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $36.87 | $20.49 | $57.36 |
| CARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $36.87 | $20.49 | $57.36 |
| CARPENTER & SOFT FLOOR LAYER (ADAMS, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LANCASTER, AND YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG AIRPORT)) | $24.77 | $8.69 | $33.46 |
| MILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND PART OF PENN FOREST TOWNSHIP NORTH OF ROUTE 903), COLUMBIA, CUMBERLAND, DAUPHIN, JUANIATA, LACKAWANNA, LANCASTER, LEBANON, LUZERNE (LOWER PART OF), LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY,PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG STATE AIRPORT) COUNTIES) | $43.00 | $23.44 | $66.44 |
| CARPENTER & SOFT FLOOR LAYER (BERKS) | $28.16 | $15.02 | $43.18 |
| MILLWRIGHT (BERKS COUNTY) | $34.00 | $17.05 | $51.05 |
| CARPENTER & SOFT FLOOR LAYER (LUZERNE (EXCEPT BLACK CREEK, BUTLER, DENNISON, FOSTER, FREELAND, HANLE, HAZLETON, HOLLENBACK, NESPECK, THE LOWER PART OF SALEM, AND SUGARLOAF), SULLIVAN, RED ROCK AIR BASE), AND WYOMING (WEST OF THE SUSQUEHANNA RIVER) COUNTIES) | $28.88 | $15.65 | $44.53 |
| CARPENTER & SOFT FLOOR LAYER (BRADFORD, LYCOMING, SULLIVAN (EXCEPT RED ROCK AIR FORCE BASE), AND TIOGA COUNTIES) | $28.88 | $15.65 | $44.53 |
| CARPENTER (LEHIGH, MONROE (EXCEPT TOBYHANNA ARMY DEPOT), AND NORTHAMPTON COUNTIES) | $32.14 | $24.09 | $56.23 |
| FLOOR LAYER: CARPET | $31.47 | $24.69 | $56.16 |
| ELECTRICIAN (BRADFORD (AREA EAST OF THE SUSQUEHANNA RIVER); LACKAWANNA; LUZERNE (AREA EAST OF A LINE FOLLOWING THE SUSQUEHANNA RIVER SOUTH TO THE CITY OF PITTSON, EAST AND SOUTH ON THE LIMITS OF PITTSON BUT EXCLUDING IT, TO U.S. HIGHWAY 11, EAST ON 11 TO DUPONT BUROUGH AND HIGHWAY 215, AND SOUTHEAST ON 215. ALSO THE PORTION OF LUZERNE COUNTY SOUTH AND EAST OF A LINE FOLLOWING THORNHURST ROAD, SOUTHWEST TO STATE HIGHWAY 115 AND SOUTHEAST ON 115 TO MONROE COUNTY LINE); MONROE (BARRETT, COOLBAU | $47.97 | $23.29 | $71.26 |
| ELECTRICIAN (MONROE (REMAINDER OF COUNTY), NORTHAMPTON (REMAINDER) AND PIKE (DELAWARE, LEHMAN, AND PORTER) COUNTIES) | $65.43 | $42.20 | $107.63 |
| ELECTRICIAN (BERKS (BETHEL, MARION, AND TULPEHOCKEN TOWNSHIPS); CUMBERLAND; DAUPHIN; JUNIATA; LANCASTER (THAT PORTION NORTHWEST OF A LINE EXTENDING FROM THE SUSQUHANNA RIVER TO THE INTERSECTION OF STATE HIGHWAYS 441 AND 241 ALONG 241 TO THE BOROUGH OF ELIZABETHTOWN, AROUND THE LIMITS OF ELIZABETHTOWN ON THE WEST AND NORTH SIDE, INCLUDING THE MASONIC HOMES IN ELIZABETHTOWN, CONTINIUING ALONG STATE HIGHWAY 241 TO LEBANON COUNTY AND THAT PORTION NORTH OF THE PENNSYLVANIA TURNPIKE, INCLUDING ALL BUILDINGS ON THE TURNPIKE FROM LEBANON COUNTY LINE TO WEST COCALICO TOWNSHIP); LEBANON; PERRY; SCHUYKILL (PINE GROVE AND TREMONT TOWNSHIPS); AND SNYDER (SOUTH OF U.S. HIGHWAY 522) YORK COUNTY (FRANKLIN, CARROL, MONOGHAM AND FAIRVIEW TWPS.) | $40.00 | $27.42 | $67.42 |
| ELECTRICIAN (BRADFORD AND WYOMING (WEST OF THE SUSQUEHANNA RIVER) COLUMBIA COUNTY (BERWICK BOROUGH ONLY IN BRIAR CREEK TOWNSHIP),LACKAWANNA COUNTY: (THAT PORTION OF LEHIGH, WEST OF HIGHWAY 215 (DUPONT THORNHURST ROAD) AND NORTH OF THE THORNHURST STODDARTSVILLE ROAD; LUZERNE COUNTY: FAIRMONT, ROSS, LAKE, DALLA, NESCOPECK, DENISON, HOLLENBACH, BLACK CREEK, SUGARLOAF, HAZEL, BUTLER, FOSTER, FRANKLIN, EXETER, KINGSTON, JACKSON, LEHMAN, PLYMOUTH, HUNLOCK, UNION, HUNTINGTON, SALEM, CONYNGHAM, NEWPORT, SLOCUM, DORRANCE, HANOVER, RICE, WRIGHT, FAIRVIEW, WHITE HAVEN, WILKES BARRE AND PLAINS TOWNSHIPS IN THEIR ENTIRETY; THAT PORTION OF PITTSTON, JENKINS AND BEAR CREEK TOWNSHIPS, SOUTH AND WEST OF A LINE FOLLOWING U.S. HIGHWAY 11 FROM THE CITY OF PITTSTON TO STATE HIGHWAY 315 TO THE DUPONT THORNHURST ROAD, AND SOUTH ON THAT ROAD TO LACKAWANNA COUNTY; ALL OF BUCK TOWNSHIP, EXCEPT THAT PORTION SOUTH AND EAST OF A LINE FOLLOWING THE THORNHURST STODDARTSVILLE ROAD FROM LACKAWANNA COUNTY TO STATE HIGHWAY 115 AND CONTINUING ON 115 TO MONROE COUNTY. ALSO INCLUDED ARE THE CITIES OF WILKES BARRE, NATICOKE, HAZLETON AND PITTSTON, BUT THE BOROUGH OF DURYEA AND AVOCA ARE EXCLUDED; MONROE COUNTY: THAT PORTION OF TOBYHANNA AND TUNKANNOCK TOWNSHIPS WEST OF STATE HIGHWAY 115; SULLIVAN COUNTY: THAT PORTION EAST OF A LINE DRAWN SOUTH ON U.S. HIGHWYA 220 FROM THE BRADFORD SULLIVAN COUNTY LINE TO THE NORDMONT EMMENS ROAD, AND SOUTH OF THIS ROAD TO THE COLUMBIA COUNTY LINE. DUNSHORE BOROUGH IS INCLUDED, BUT LAPORTE BOROUGH IS EXCLUDED | $47.08 | $25.41 | $72.49 |
| ELECTRICIAN (ADAMS AND YORK (EXCEPT CARROLL, FAIRVIEW, FRANKLIN, AND MONAGHAN TOWNSHIPS) COUNTIES) | $40.31 | $23.93 | $64.24 |
| ELECTRICIAN (BERKS (HEREFORD, LONGSWAMP, AND WASHINGTON TOWNSHIPS; AND THE PORTION OF MAXATOWNEY TOWNSHIP EAST OF SACONY CREEK);(NORTHAMPTON (ALLEN, HANOVER, LEHIGH TOWNSHIPS BOROUGHS OF BATH, FREEMANSBURG, HELLERTOWN AND THE CITY OF BETHLEHEM, THE PORTION OF MOORE TOWNSHIP OF STATE HIGHWAY 946 AND WEST OF STATE HIGHWAY 987. CITY OF BETHLEHEM; THE PORTION OF MOORE TOWNSHIP SOUTH OF STATE HIGHWAY 946 AND WEST OF STATE HIGHWAY 987. EAST ALLEN TOWNSHIP EXCEPT THE PART NORTH OF BATH BOROUGH AND EAST OF STATE HIGHWAY 987 AND LOWER SAUCON TOWNSHIP WEST OF A LINE FOLLOWING THE HECKTOWN-BUTZTOWN ROAD. SOUTH FROM LOWER NAZARETH TOWNSHIP THROUGH BUTRZTOWN AND CONTINUING TO MIDDLETON, ALONG ALTERNATE U.S. HIGHWAY 22 TO THE EASTERN BOUNDARY OF THE BOROUGH OF FREEMANSBURG, ALONG THIS BOUNDARY IN A SOUTHERLY DIRECTION TO THE BETHLEHEM CITY LINE BETWEEN BETHLEHEM AND LOWER AUCON TOWNSHIP TO THE NORTHERN BOUNDARY OF HELLERTON AND LOWER SAUCON TOWNSHIP TO STATE HIGHWAY 412 TO BUCKS COUNTY), LEHIGH & CARBON COUNTIES | $50.00 | $25.93 | $75.93 |
| ELECTRICIAN (COLUMBIA (EXCEPT BERWICK BOROUGH); MONTOUR; NORTHUMBERLAND (REMAINDER); SCHUYLKILL (REMAINDER); SNYDER (NORTH OF HWY 522); AND UNION (EAST BUFFALO, LEWISBURG, AND UNION TWPS.) COUNTIES) | $41.00 | $31.06 | $72.06 |
| ELECTRICIAN (TIOGA COUNTY) | $40.47 | $26.51 | $66.98 |
| ELECTRICIAN: SULLIVAN COUNTY (BRADFORD (ARMENIA AND CANTON TOWNSHIPS); AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LINE TO THE DUSHORE BOROUGH, THEN WEST, SOUTH AND EAST AROUND THE WESTERN LIMITS OF DUSHORE AND WEST AROUND THE EASTERN LIMITS OF LAPORTS BACK TO HIGHWAY #220; HENCE SOUTH ON HIGHWAY #220 TO NORDMONT-EMMANS ROAD, (MARKED "55" ON THE 1931 DEPARTMENT OF HIGHWAY MAY OF SULLIVAN COUNTY;) THEN IN A SOUTHERLY DIRECTION TO THE SULLIVAN-COLUMBIA COUNTY LINE, LAPORTE BOROUGH IN THIS JURISDICTION) COUNTIES | $38.50 | $26.46 | $64.96 |
| ELECTRICIAN: BRADFORD COUNTY (BRADFORD (ARMENIA AND CANTON TOWNSHIPS); AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LINE TO THE DUSHORE BOROUGH, THEN WEST, SOUTH AND EAST AROUND THE WESTERN LIMITS OF DUSHORE AND WEST AROUND THE EASTERN LIMITS OF LAPORTS BACK TO HIGHWAY #220; HENCE SOUTH ON HIGHWAY #220 TO NORDMONT-EMMANS ROAD, (MARKED "55" ON THE 1931 DEPARTMENT OF HIGHWAY MAY OF SULLIVAN COUNTY;) THEN IN A SOUTHERLY DIRECTION TO THE SULLIVAN-COLUMBIA COUNTY LINE, LAPORTE BOROUGH IN THIS JURISDICTION) COUNTIES | $40.47 | $26.51 | $66.98 |
| ELECTRICIAN (NORTHUMBERLAND (DELAWARE, LEWIS, AND TURBOT TOWNSHIPS, AND THE BOROUGH OF MILTON) AND UNION (EXCEPT EAST BUFFALO AND UNION TOWNSHIPS AND LEWISBURG BOROUGH) COUNTIES) | $38.50 | $26.46 | $64.96 |
| ELECTRICIAN (LYCOMING COUNTY) | $38.50 | $26.46 | $64.96 |
| HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $37.10 | $27.62 | $64.72 |
| 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. | $37.97 | $27.89 | $65.86 |
| 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. | $38.42 | $28.02 | $66.44 |
| WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. | $39.57 | $28.34 | $67.91 |
| HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $44.54 | $29.82 | $74.36 |
| WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. | $42.29 | $29.15 | $71.44 |
| HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $44.82 | $29.90 | $74.72 |
| - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. | $42.57 | $29.24 | $71.81 |
| FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $38.26 | $28.46 | $66.72 |
| PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $39.13 | $28.73 | $67.86 |
| PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $39.59 | $28.85 | $68.44 |
| YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $40.73 | $29.18 | $69.91 |
| PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $45.70 | $30.66 | $76.36 |
| PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $43.45 | $29.99 | $73.44 |
| DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $45.98 | $30.74 | $76.72 |
| PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $43.73 | $30.08 | $73.81 |
| IRONWORKERS (ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, UNION AND YORK COUNTIES) | $37.26 | $32.63 | $69.89 |
| IRONWORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE, SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $37.26 | $32.63 | $69.89 |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $31.43 | $19.99 | $51.42 |
| ROCK SHAFTS) | $30.95 | $19.99 | $50.94 |
| TUNNELS AND ROCK SHAFTS) | $30.66 | $19.99 | $50.65 |
| LABORERS: BUILDER (BRADFORD, LYCOMING, MONTOUR, NORTHUMBERLAND (NORTHERN PART), TIOGA, AND UNION COUNTIES) | $20.22 | $12.93 | $33.15 |
| PLASTERER (PIKE AND MONROE (EXCEPT TOBYHANNA) COUNTIES) | $37.81 | $13.70 | $51.51 |
| CEMENT MASON/CONCRETE FINISHER (PIKE AND MONROE (EXCEPT TOBYHANNA) COUNTIES) | $37.13 | $14.30 | $51.43 |
| PLASTERER (COLUMBIA COUNTY) | $37.81 | $13.70 | $51.51 |
| CEMENT MASON/CONCRETE FINISHER (COLUMBIA COUNTY) | $37.13 | $14.30 | $51.43 |
| PLASTERER (ADAMS, BERKS (PORTIONS OF), LANCASTER, AND LEBANON COUNTIES) | $31.33 | $20.75 | $52.08 |
| CEMENT MASON/CONCRETE FINISHER (ADAMS, LANCASTER AND YORK COUNTIES) | $34.05 | $21.25 | $55.30 |
| PLASTERER (BERKS COUNTY) | $31.33 | $20.75 | $52.08 |
| CEMENT MASON/CONCRETE FINISHER (REMAINDER OF BERKS COUNTY) | $34.15 | $20.50 | $54.65 |
| CEMENT MASON/CONCRETE FINISHER (BERKS (NORTHEASTERN PART LYING NORTH OF A LINE STARTING FROM THE SOUTHERN BOUNDARY LINE OF LEHIGH COUNTY CONTINUING THROUGH HUFFS CHURCH, FREDERICKSVILLE, DRYVILLE, LYON STATION, KUTZTOWN, KRUMSVILLE, AND STONEY RUN IN BERKS COUNTY TO THE LEHIGH COUNTY LINE)) | $35.18 | $24.25 | $59.43 |
| STEAMFITTER (BERKS, LEHIGH, AND NORTHAMPTON COUNTIES) | $59.65 | $42.78 | $102.43 |
| PLUMBER AND STEAMFITTER (COLUMBIA (REMAINDER OF COUNTY), CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON (WEST OF ROUTE 501), MONTOUR, NORTHUMBERLAND, PERRY, SNYDER, YORK, BRADFORD COUNTY (WESTERN HALF), SULLIVAN, TIOGA AND UNION COUNTIES) | $41.36 | $29.45 | $70.81 |
| PLUMBER AND STEAMFITTER (CARBON, COLUMBIA (BERWICK TOWNSHIP), BRADFORD (EASTERN PART), LUZERNE, LACKAWANNA, MONROE, SCHUYLKILL, SUSQUEHANNA, WAYNE, WYOMING, AND PIKE COUNTIES) | $51.69 | $27.07 | $78.76 |
| PLUMBER (BERKS, LEHIGH, LEBANON (EAST OF ROUTE 501), AND NORTHAMPTON COUNTIES) | $56.28 | $35.51 | $91.79 |
| ROOFERS: COMPOSITION (REMAINING COUNTIES) | $39.50 | $31.80 | $71.30 |
| ROOFER (BRADFORD, LACKAWANNA, LUZERNE (NORTH OF INTERSTATE 80 WITH THE EXCEPTION OF WHITE HAVEN TWP.) MONROE (TOBYHANNA ARMY DEPOT ONLY), PIKE, SULLIVAN, TIOGA, WAYNE, AND WYOMING COUNTIES) | $34.25 | $21.89 | $56.14 |
| SHEET METAL WORKER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES). | $45.02 | $44.09 | $89.11 |
| SHEET METAL WORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMNING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $36.13 | $30.32 | $66.45 |
| COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $42.43 | $0.00 | $42.43 |
| TRUCK DRIVER: GROUP 3 EUCLID TYPE OFF-HIGHWAY EQUIPMENT - BACK OR BELLY DUMP TRUCKS AND DOUBLE-HITCHED EQUIPMENT, STRADDLE (ROSS) CARRIER, LOW-BED TRAILERS - (BRADFORD AND TIOGA COUNTIES) | $26.52 | $15.91 | $42.43 |
| COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.94 | $0.00 | $41.94 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, READY-MIX AND DUMPCRETE TYPE VEHICLES, ASPHALT DISTRIBUTORS (WHEN USED FOR TRANSPORTATION), STAKE BODY TRUCK (TANDEM) - (BRADFORD AND TIOGA COUNTIES) | $26.03 | $15.91 | $41.94 |
| COUNTIES) | $25.96 | $15.91 | $41.87 |
| DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.87 | $0.00 | $41.87 |
LABORER 12 classifications · $33.14 to $53.22 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: BUILDING (LACKAWANNA, PIKE, SUSQUEHANNA, WAYNE AND WYOMING (NORTHERN PART) COUNTIES) | $24.35 | $21.43 | $45.78 |
| LABORER: BUILDING (LUZERNE (NORTHERN PART), SULLIVAN AND WYOMING (SOUTHERN PART) COUNTIES) | $24.35 | $21.43 | $45.78 |
| LABORER: BUILDING (LUZERNE (SOUTHERN PART), COLUMBIA COUNTIES) | $24.35 | $21.43 | $45.78 |
| LABORER: HEAVY CONSTRUCTION: GROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH REBAR, AND CONCRETE SURFACER | $31.24 | $19.99 | $51.23 |
| LABORER: HEAVY CONSTRUCTION: GROUP 4 CAISSON-OPEN AIR BELOW 8 FEET, COFFERDAM OPEN AIR BELOW 8 FEET WHERE EXCAVATIONS FOR CIRCULAR CAISSONS AND COFFERDAMS 8 FT AND BELOW LEVEL OF NATURAL GRADE ADJACENT TO STARTING POINT, FORM SETTERS (ROAD) WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, WALK BEHIND ROLLERS AND CONCRETE RUBBERS, BLASTER | $30.57 | $19.99 | $50.56 |
| LABORER: HEAVY CONSTRUCTION: GROUP 3 CONCRETE PITMAN, PUDDLERS, HIGHWAY GUIDE RAIL RIGHT OF WAY AND PROPERTY FENCE SLAB REINFORCEMENT PLACERS, LABORERS, LANDSCAPER, SEEDERS, PLANTERS, MAGAZINE TENDERS, LASER BEAM MEN FOR PIPE LAYING AND PAVING MACHINES,, RAILROAD TRACKMAN, SIGNALMAN, ASPHALT RAKERS, ASPHALT TAMPER, LUTE OR SCREED MAN, PNEUMATIC AND ELECTRIC TOOL OPERATORS, JACKMAMMERS, PAVING BREAKERS, CONCRETE SAWS, WHACKER VIBRATOR, CHAINSAW, HIGHWAY CONCRETE BLOCK LAYERS, SHEET HAMMER, PIPE LAYERS, WALK BEHIND ROLLERS, WALK BEHIND TRENCHER | $30.22 | $19.99 | $50.21 |
| LABORER: HEAVY CONSTRUCTION: GROUP 2 HAZARDOUS/TOXIC/ASBESTOS WASTE HANDLER, LEAD PAINT HANDLER | $33.23 | $19.99 | $53.22 |
| LABORER: HEAVY CONSTRUCTION: GROUP 1 FLAG PERSON | $26.61 | $19.99 | $46.60 |
| LABORER: BUILDING (CARBON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES) | $25.39 | $22.29 | $47.68 |
| LABORER: BUILDING (BERKS, LEBANON AND SCHUYLKILL COUNTIES) | $21.57 | $15.04 | $36.61 |
| LABORER: BUILDING (CUMBERLAND, DAUPHIN, JUNIATA, NORTHUMBERLAND (SOUTH OF THE SUSQUEHANNA RIVER), PERRY, AND SNYDER COUNTIES) | $20.21 | $12.93 | $33.14 |
| LABORER: BUILDING (ADAMS, LANCASTER AND YORK COUNTIES) | $23.01 | $17.18 | $40.19 |
PAINTERS 10 classifications · $44.27 to $59.73 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: STRUCTURAL STEEL (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES) | $29.02 | $18.33 | $47.35 |
| PAINTERS: BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES) | $28.02 | $18.33 | $46.35 |
| PAINTERS: STRUCTURAL STEEL (BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $30.02 | $21.14 | $51.16 |
| PAINTERS: SPRAY (BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $30.02 | $21.14 | $51.16 |
| PAINTERS: BRUSH AND ROLLER (BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $29.02 | $21.14 | $50.16 |
| PAINTERS: SPRAY (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 |
| PAINTERS: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY) | $36.01 | $23.72 | $59.73 |
| PAINTERS: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 |
| PAINTERS: INDUSTRIAL (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES) | $27.97 | $16.30 | $44.27 |
| PAINTERS: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES) | $33.72 | $16.30 | $50.02 |
Highway PA20260006 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
| CARPENTER (LEHIGH AND NORTHAMPTON COUNTIES) | $40.04 | $28.09 | $68.13 |
| IRONWORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE, SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $37.26 | $32.63 | $69.89 |
| MILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMENSING, PENN FOREST. EVERYTHING SOUTH OF ROUTE 903 AND EAST TO THE KIDDER TOWNSHIP LINE. BOROUGHS: HAUTO, NESQUEHONING, LANSFORD, SUMMIT HILL, JIM THORPE, WEISSPORT, BOWNMANSTOWN, PALMERTON, LEHIGHTON, AND PARRYVILLE) , LEHIGH AND NORTHAMPTON COUNTIES) | $50.22 | $35.03 | $85.25 |
| PILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $36.87 | $20.49 | $57.36 |
| CARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $36.87 | $20.49 | $57.36 |
| MILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND PART OF PENN FOREST TOWNSHIP NORTH OF ROUTE 903) COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LUZERNE (LOWER PART OF) MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG STATE AIRPORT) COUNTIES) | $43.00 | $23.44 | $66.44 |
| MILLWRIGHT (BERKS AND LANCASTER COUNTIES) | $43.00 | $23.44 | $66.44 |
| PILEDRIVERMAN (LEHIGH AND NORTHAMPTON COUNTIES) | $48.25 | $44.92 | $93.17 |
| POWER EQUIPMENT OPERATORS: HIGHWAY CONSTRUCTION AND 4 FIREMAN AND GREASE TRUCK BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. | $40.26 | $29.54 | $69.80 |
| ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $42.80 | $30.30 | $73.10 |
| HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. | $37.80 | $28.82 | $66.62 |
| YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. | $38.67 | $29.09 | $67.76 |
| YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. | $39.12 | $29.22 | $68.34 |
| DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. | $40.26 | $29.55 | $69.81 |
| INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. | $45.43 | $31.08 | $76.51 |
| FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $43.18 | $30.41 | $73.59 |
| YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. | $43.46 | $30.50 | $73.96 |
| IRONWORKERS (ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, UNION AND YORK COUNTIES) | $37.26 | $32.63 | $69.89 |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $30.95 | $19.99 | $50.94 |
| AND ROCK SHAFTS) | $30.66 | $19.99 | $50.65 |
| CEMENT MASON/CONCRETE FINISHER (MONROE COUNTY; (EXCEPT TOBYHANNA DEPOT)) | $37.13 | $14.30 | $51.43 |
| CEMENT MASON/CONCRETE FINISHER (COLUMBIA COUNTY) | $37.13 | $14.30 | $51.43 |
| CEMENT MASON/CONCRETE FINISHER (BERKS (NORTHEASTERN PART LYING NORTH OF A LINE STARTING FROM THE SOUTHERN BOUNDARY LINE OF LEHIGH COUNTY CONTINUING THROUGH HUFFS CHURCH, FREDERICKSVILLE, DRYVILLE, LYON STATION, KUTZTOWN, KRUMSVILLE, AND STONEY RUN IN BERKS COUNTY TO THE LEHIGH COUNTY LINE), CARBON, LEHIGH, NORTHAMPTON (NORTHWEST PART INCLUDING THE TOWNS OF WALNUTPORT, BATH, AND NORTHAMPTON) COUNTIES) | $35.18 | $24.25 | $59.43 |
| PLASTERER (ADAMS, BERKS (PORTIONS OF), LANCASTER, AND LEBANON COUNTIES) | $31.33 | $20.75 | $52.08 |
| CEMENT MASON/CONCRETE FINISHER (ADAMS, LANCASTER AND YORK COUNTIES) | $34.05 | $21.25 | $55.30 |
| CEMENT MASON/CONCRETE FINISHER (MONROE COUNTY (TOBYHANNA ARMY DEPOT)) | $37.13 | $14.30 | $51.43 |
| COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $26.03 | $15.91 | $41.94 |
| TRUCK DRIVER: GROUP 3 EUCLID-TYPE, OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS), STRADDLE TRUCKS, PUSHER, ARTICULATE DUMPED TRUCKS, LOW BOY TRAILERS, SEMI TRAILERS WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE. (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $42.43 | $0.00 | $42.43 |
| (BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $26.52 | $15.91 | $42.43 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS), ASPHALT DISTRIBUTORS, TRANSIT MIX (UNDER 5 YDS), TRANSIT MIX (OVER 5 YDS.), FLAT OR STAKE BODY (TANDEM), FUEL TRUCK A-FRAME/WINCH TRUCKS, DRY BATCH TRUCK, TRUCK MOUNTED SWEEPER AND VAC TRUCKS, BUSES, DUMPSTER (TANDEM) (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.94 | $0.00 | $41.94 |
| TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE-AXLE), DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE), STAKE BODY TRCK (SINGLE AXLE), DUMPSTER (SINGLE AXLE) (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.87 | $0.00 | $41.87 |
| TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $25.96 | $15.91 | $41.87 |
LINE CONSTRUCTION 9 classifications · $54.35 to $99.49 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: WINCH TRUCK OPERATOR (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $37.24 | $24.25 | $61.49 |
| LINE CONSTRUCTION: TRUCK DRIVER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $34.58 | $23.34 | $57.92 |
| LINE CONSTRUCTION: LINEMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $53.20 | $29.72 | $82.92 |
| LINE CONSTRUCTION: GROUNDMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $31.92 | $22.43 | $54.35 |
| LINE CONSTRUCTION: CABLE SPLICER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $53.20 | $29.72 | $82.92 |
| LINE CONSTRUCTION: TRUCK DRIVER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $44.24 | $16.21 | $60.45 |
| LINE CONSTRUCTION: LINEMEN (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $68.06 | $31.43 | $99.49 |
| LINE CONSTRUCTION: GROUNDMEN (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $42.20 | $16.02 | $58.22 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $68.06 | $31.43 | $99.49 |
POWER EQUIPMENT OPERATOR 7 classifications · $69.14 to $76.87 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 6A ALL MACHINES WITH BOOMS (INCLUDING JIBS, MASTS, LEADS, ETC.) 100 FEET 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. | $45.05 | $30.96 | $76.01 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 5 OILERS AND DECK HANDS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. | $39.73 | $29.41 | $69.14 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 3 WELDING MACHINE, WELL POINTS, COMPRESSORS, PUMP HEATERS, FARM TRACTORS, FORM LINE GRADERS, DITCH WITCH TYPE TRENCHER, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, MISCELLANEOUS EQUIPMENT OPERATOR, SEAMAN PULVERIZING MIXER, POWER BROOM, SEEDING SPREADER, TIREMAN - (FOR POWER EQUIPMENT ) CONVEYORS, LOADERS OTHER THAN EUC TYPE, CONVEYORS, DRILLER SECOND CLASS, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT, AND FORKLIFT UNDER 20 FT. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. | $40.70 | $29.68 | $70.38 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 2 SPREADERS, ASPHALT PLANT ENGINEERS, ROLLERS (HIGH GRADE FINISHING), MACHINE SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT, AND FORKLIFTS 20FT AND OVER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. | $41.39 | $29.89 | $71.28 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; SINGLE PERSON OPERATION TRUCK CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. | $44.81 | $30.92 | $75.73 |
| POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1 PILE DRIVERS, ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, PAVER (BLACKTOP AND CONCRETE), GRADALLS, ALL FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPES BACKHOES, BOAT CAPTAINS, BATCH PLANT WITH MIXER, DRILL SELF CONTAINED (DRILL-MASTER TYPE), CMI AUTOGRADE, MILLING MACHINE, VEMEER SAW, CONVEYOR LOADER (EUCLID TYPE) SCRAPER AND TOURNAPULLS, BULLDOZERS AND TRACTORS, CONCRETE PUMPS, MOTOR PATROLS, MECHANIC WELDERS, LOG SKIDDER, SIDE BOOM, BOBCAT TYPE (WITH ATTACHMENTS), BORING MACHINES INCLUDING DIRECTIONAL BORING MACHINES, CHIPPER WITH BOOM, HYDRO AX, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. | $42.56 | $30.24 | $72.80 |
| POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLE WAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. | $45.71 | $31.16 | $76.87 |
LABORER 6 classifications · $46.60 to $53.22 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GROUP 8 MINERS, DRILLERS, BLASTERS, PNEUMATIC SHIELD OPERATORS, LINING, SPOTTING AND TIMBER WORKMEN, REBAR STEEL PLACER, BONDING AND SECURING, WELDERS, AND CONCRETE SURFACERS - (FREE AIR TUNNELS AND ROCK SHAFTS) | $31.43 | $19.99 | $51.42 |
| LABORER: GROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH REBAR, AND CONCRETE SURFACER | $31.24 | $19.99 | $51.23 |
| LABORER: GROUP 4 CAISSON-OPEN AIR BELOW 8 FEET, COFFERDAM OPEN AIR BELOW 8 FEET WHERE EXCAVATIONS FOR CIRCULAR CAISSONS AND COFFERDAMS 8 FT AND BELOW LEVEL OF NATURAL GRADE ADJACENT TO STARTING POINT, FORM SETTERS (ROAD) WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, CONCRETE RUBBERS, BLASTER | $30.57 | $19.99 | $50.56 |
| LABORER: GROUP 3 ASPHALT TAMPER, CONCRETE PITMAN, PUDDLERS, HIGHWAY GUIDE RAIL RIGHT OF WAY AND PROPERTY FENCE SLAB REINFORCEMENT PLACERS, LABORERS, LANDSCAPER, SEEDERS, PLANTERS, MAGAZINE TENDERS, LASER BEAM MEN FOR PIPE LAYING AND PAVING MACHINES,, RAILROAD TRACKMAN, SIGNALMAN, ASPHALT RAKERS, LUTE OR SCREED MAN, PNEUMATIC AND ELECTRIC TOOL OPERATORS, JACKMAMMERS, PAVING BREAKERS, CONCRETE SAWS, WHACKER VIBRATOR, CHAINSAW, HIGHWAY CONCRETE BLOCK LAYERS, SHEET HAMMER, PIPE LAYERS, WALK BEHIND ROLLERS, WALK BEHIND TRENCHER | $30.22 | $19.99 | $50.21 |
| LABORER: GROUP 2 HAZARDOUS/TOXIC/ASBESTOS WASTE HANDLER, LEAD PAINT HANDLER | $33.23 | $19.99 | $53.22 |
| LABORER: GROUP 1 FLAG PERSON | $26.61 | $19.99 | $46.60 |
PAINTERS 15 classifications · $34.80 to $62.05 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS: SPRAY, SANDBLAST (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES) | $27.97 | $16.30 | $44.27 |
| PAINTERS: BRUSH (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES) | $25.84 | $16.30 | $42.14 |
| PAINTERS: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES) | $33.72 | $16.30 | $50.02 |
| PAINTERS: SPRAY (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 |
| PAINTERS: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY) | $36.01 | $23.72 | $59.73 |
| PAINTERS: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 |
| PAINTERS: BRIDGE, TOWERS (JUNIATA COUNTY) | $38.33 | $23.72 | $62.05 |
| PAINTERS: SPRAY AND SANDBLAST (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $27.55 | $14.80 | $42.35 |
| PAINTERS: BRUSH AND ROLLER (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $26.55 | $14.80 | $41.35 |
| PAINTERS: BRIDGE; SPRAY (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $31.85 | $14.80 | $46.65 |
| PAINTERS: BRIDGE; BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $30.85 | $14.80 | $45.65 |
| PAINTERS: SPRAY, SANDBLAST (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES) | $23.75 | $12.05 | $35.80 |
| PAINTERS: BRUSH AND ROLLER (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES) | $22.75 | $12.05 | $34.80 |
| PAINTERS: BRIDGE; SPRAY (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES) | $26.60 | $12.05 | $38.65 |
| PAINTERS: BRIDGE; BRUSH, ROLLER (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES) | $25.60 | $12.05 | $37.65 |
Residential PA20260119 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $45.45 | $30.16 | $75.61 |
| CARPENTER | $45.13 | $29.04 | $74.17 |
| ELECTRICIAN (INCLUDES COMMUNICATION TECHNICIAN AND LOW VOLTAGE WIRING) | $50.00 | $25.93 | $75.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $50.80 | $28.89 | $79.69 |
| LABORER: COMMON OR GENERAL | $39.10 | $26.69 | $65.79 |
| PAINTER: BRUSH AND ROLLER ONLY | $29.51 | $20.15 | $49.66 |
| PLUMBER | $64.73 | $37.21 | $101.94 |
| ROOFER | $31.25 | $21.75 | $53.00 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.