Building construction wages: Carbon, Pennsylvania
Wage determination PA20260081 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260081 on · latest revision 3 · verify at sam.gov/wage-determination/PA20260081/3
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 3 | 2026-05-18 | diff vs rev 2 |
| rev 2 | 2026-05-17 | diff vs rev 1 |
| rev 1 | 2026-01-30 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 3)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 | $69.81 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
| MASON - STONE | $33.24 | $17.78 | $51.02 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $33.24 | $17.78 | $51.02 |
| TILE SETTER | $31.12 | $21.11 | $52.23 |
| TILE FINISHER | $30.20 | $16.41 | $46.61 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FIRESTOPPING, FORM WORK, METAL FLASHING INSTALLATION, METAL ROOF INSTALLATION, SCAFFOLD BUILDING (EXCLUDING MASONRY/BRICK), SIDING INSTALLATION- METAL, ALUMINUM AND VINYL; EXCLUDING FLOOR LAYING- HARDWOOD, CARPET AND VINYL) | $39.74 | $28.09 | $67.83 |
| MILLWRIGHT | $51.22 | $36.72 | $87.94 |
| CARPENTER (FLOOR LAYING- HARDWOOD, CARPET AND VINYL ONLY) | $41.23 | $29.79 | $71.02 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, LOW VOLTAGE WIRING, AND SOLAR PANEL WIRING AND INSTALLATION) | $50.00 | $25.93 | $75.93 |
| ELEVATOR MECHANIC | $61.41 | $38.44 | $99.85 |
| POWER EQUIPMENT OPERATOR (PUMP) | $28.36 | $18.10 | $46.46 |
| POWER EQUIPMENT OPERATOR: ROLLER | $31.09 | $22.35 | $53.44 |
| POWER EQUIPMENT OPERATOR: CRANE | $37.49 | $24.23 | $61.72 |
| POWER EQUIPMENT OPERATOR (OILER) | $29.77 | $21.95 | $51.72 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | $32.23 | $22.68 | $54.91 |
| POWER EQUIPMENT OPERATOR (COMPRESSOR) | $31.09 | $22.35 | $53.44 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID/STEER/SKID LOADER,BOOM, BULLDOZER, CONCRETE PUMP, HOIST (WITH TWO TOWERS), MECHANIC, ROLLER (HIGH GRADE FINISHING), DRILL RIG CAISSONS, HEAT PLANER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $34.96 | $23.48 | $58.44 |
| IRONWORKER: ORNAMENTAL | $37.26 | $32.63 | $69.89 |
| LABORER (PLASTER TENDER) | $26.74 | $17.34 | $44.08 |
| LABORER (FORKLIFT (MASONRY WORK ONLY); SCAFFOLD BUILDER (BRICK AND MASONRY); MASON TENDER-BRICK) | $26.74 | $17.34 | $44.08 |
| LABORER (CONCRETE WORKER; TAMPER (HAND HELD)) | $25.39 | $17.34 | $42.73 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $26.45 | $16.30 | $42.75 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $27.01 | $16.30 | $43.31 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $59.65 | $42.78 | $102.43 |
| PLUMBER (HVAC MECHANIC- HVAC TEMPERATURE CONTROLS INSTALLATION ONLY) | $59.65 | $42.78 | $102.43 |
| PLUMBER | $56.28 | $35.51 | $91.79 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $40.33 | $32.62 | $72.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 |
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION | $43.09 | $42.52 | $85.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $36.13 | $30.32 | $66.45 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | $18.37 | $51.38 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 |
| OPERATOR: DRILL | $28.55 | $15.78 | $44.33 |
| LABORER: COMMON OR GENERAL | $23.55 | $8.67 | $32.22 |
| IRONWORKER, STRUCTURAL | $33.55 | $21.92 | $55.47 |
| IRONWORKER, REINFORCING | $26.24 | $14.49 | $40.73 |
| GLAZIER | $29.22 | $15.73 | $44.95 |
| CEMENT MASON/CONCRETE FINISHER | $24.55 | $16.19 | $40.74 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.89 | $19.81 | $47.70 |