Building construction wages: Carbon, Pennsylvania
Wage determination PA20260081 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/PA20260081 on · latest revision 3 · verify at sam.gov/wage-determination/PA20260081/3
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 3 | 2026-05-18 | diff vs rev 2 |
| rev 2 | 2026-05-17 | diff vs rev 1 |
| rev 1 | 2026-01-30 | diff vs rev 0 |
| rev 0 | 2026-01-09 | original |
Current rates (rev 3)
The CSV and the printed sheet are snapshots of rev 3. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 | $69.81 |
| BOILERMAKER | $55.00 | $35.48 | $90.48 |
| MASON - STONE | $33.24 | $17.78 | $51.02 |
| BRICKLAYER (INCLUDING POINTING, CAULKING, AND CLEANING) | $33.24 | $17.78 | $51.02 |
| TILE SETTER | $31.12 | $21.11 | $52.23 |
| TILE FINISHER | $30.20 | $16.41 | $46.61 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FIRESTOPPING, FORM WORK, METAL FLASHING INSTALLATION, METAL ROOF INSTALLATION, SCAFFOLD BUILDING (EXCLUDING MASONRY/BRICK), SIDING INSTALLATION- METAL, ALUMINUM AND VINYL; EXCLUDING FLOOR LAYING- HARDWOOD, CARPET AND VINYL) | $39.74 | $28.09 | $67.83 |
| MILLWRIGHT | $51.22 | $36.72 | $87.94 |
| CARPENTER (FLOOR LAYING- HARDWOOD, CARPET AND VINYL ONLY) | $41.23 | $29.79 | $71.02 |
| ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, LOW VOLTAGE WIRING, AND SOLAR PANEL WIRING AND INSTALLATION) | $50.00 | $25.93 | $75.93 |
| ELEVATOR MECHANIC | $61.41 | $38.44 | $99.85 |
| POWER EQUIPMENT OPERATOR (PUMP) | $28.36 | $18.10 | $46.46 |
| POWER EQUIPMENT OPERATOR: ROLLER | $31.09 | $22.35 | $53.44 |
| POWER EQUIPMENT OPERATOR: CRANE | $37.49 | $24.23 | $61.72 |
| POWER EQUIPMENT OPERATOR (OILER) | $29.77 | $21.95 | $51.72 |
| POWER EQUIPMENT OPERATOR (HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | $32.23 | $22.68 | $54.91 |
| POWER EQUIPMENT OPERATOR (COMPRESSOR) | $31.09 | $22.35 | $53.44 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID/STEER/SKID LOADER,BOOM, BULLDOZER, CONCRETE PUMP, HOIST (WITH TWO TOWERS), MECHANIC, ROLLER (HIGH GRADE FINISHING), DRILL RIG CAISSONS, HEAT PLANER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $34.96 | $23.48 | $58.44 |
| IRONWORKER: ORNAMENTAL | $37.26 | $32.63 | $69.89 |
| LABORER (PLASTER TENDER) | $26.74 | $17.34 | $44.08 |
| LABORER (FORKLIFT (MASONRY WORK ONLY); SCAFFOLD BUILDER (BRICK AND MASONRY); MASON TENDER-BRICK) | $26.74 | $17.34 | $44.08 |
| LABORER (CONCRETE WORKER; TAMPER (HAND HELD)) | $25.39 | $17.34 | $42.73 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $26.45 | $16.30 | $42.75 |
| PAINTER (DRYWALL FINISHING/TAPING ONLY) | $27.01 | $16.30 | $43.31 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $59.65 | $42.78 | $102.43 |
| PLUMBER (HVAC MECHANIC- HVAC TEMPERATURE CONTROLS INSTALLATION ONLY) | $59.65 | $42.78 | $102.43 |
| PLUMBER | $56.28 | $35.51 | $91.79 |
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $40.33 | $32.62 | $72.95 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 |
| SHEET METAL WORKER: EXCLUDING HVAC DUCT INSTALLATION | $43.09 | $42.52 | $85.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $36.13 | $30.32 | $66.45 |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 |
| ROOFER: WATERPROOFING ONLY | $28.60 | $18.02 | $46.62 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | $18.37 | $51.38 |
| OPERATOR: GRADER/BLADE | $32.51 | $17.98 | $50.49 |
| OPERATOR: GRADALL | $32.70 | $18.43 | $51.13 |
| OPERATOR: DRILL | $28.55 | $15.78 | $44.33 |
| LABORER: COMMON OR GENERAL | $23.55 | $8.67 | $32.22 |
| IRONWORKER, STRUCTURAL | $33.55 | $21.92 | $55.47 |
| IRONWORKER, REINFORCING | $26.24 | $14.49 | $40.73 |
| GLAZIER | $29.22 | $15.73 | $44.95 |
| CEMENT MASON/CONCRETE FINISHER | $24.55 | $16.19 | $40.74 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.89 | $19.81 | $47.70 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.