Heavy, Highway construction wages: Berks + 28 more counties, Pennsylvania

Wage determination PA20260006 · Active · Standard · verify on SAM.gov

BerksCumberlandDauphinJuniataLancasterLebanonMontourNorthumberlandPerrySnyderUnionLehighNorthamptonBradfordCarbonColumbiaLackawannaLuzerneLycomingMonroePikeSchuylkillSullivanSusquehannaTiogaWayneWyomingAdamsYork

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
BOILERMAKER$55.00$35.48$90.48
CARPENTER (LEHIGH AND NORTHAMPTON COUNTIES)$40.04$28.09$68.13
IRONWORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE, SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)$37.26$32.63$69.89
MILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMENSING, PENN FOREST. EVERYTHING SOUTH OF ROUTE 903 AND EAST TO THE KIDDER TOWNSHIP LINE. BOROUGHS: HAUTO, NESQUEHONING, LANSFORD, SUMMIT HILL, JIM THORPE, WEISSPORT, BOWNMANSTOWN, PALMERTON, LEHIGHTON, AND PARRYVILLE) , LEHIGH AND NORTHAMPTON COUNTIES)$50.22$35.03$85.25
PILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK)$36.87$20.49$57.36
CARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK)$36.87$20.49$57.36
MILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND PART OF PENN FOREST TOWNSHIP NORTH OF ROUTE 903) COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LUZERNE (LOWER PART OF) MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG STATE AIRPORT) COUNTIES)$43.00$23.44$66.44
MILLWRIGHT (BERKS AND LANCASTER COUNTIES)$43.00$23.44$66.44
PILEDRIVERMAN (LEHIGH AND NORTHAMPTON COUNTIES)$48.25$44.92$93.17
LINE CONSTRUCTION: WINCH TRUCK OPERATOR (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES)$37.24$24.25$61.49
LINE CONSTRUCTION: TRUCK DRIVER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES)$34.58$23.34$57.92
LINE CONSTRUCTION: LINEMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES)$53.20$29.72$82.92
LINE CONSTRUCTION: GROUNDMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES)$31.92$22.43$54.35
LINE CONSTRUCTION: CABLE SPLICER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES)$53.20$29.72$82.92
LINE CONSTRUCTION: TRUCK DRIVER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES)$44.24$16.21$60.45
LINE CONSTRUCTION: LINEMEN (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES)$68.06$31.43$99.49
LINE CONSTRUCTION: GROUNDMEN (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES)$42.20$16.02$58.22
LINE CONSTRUCTION: EQUIPMENT OPERATOR (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES)$68.06$31.43$99.49
POWER EQUIPMENT OPERATORS: HIGHWAY CONSTRUCTION AND 4 FIREMAN AND GREASE TRUCK BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED.$40.26$29.54$69.80
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 6A ALL MACHINES WITH BOOMS (INCLUDING JIBS, MASTS, LEADS, ETC.) 100 FEET 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED.$45.05$30.96$76.01
***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS$42.80$30.30$73.10
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 5 OILERS AND DECK HANDS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED.$39.73$29.41$69.14
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 3 WELDING MACHINE, WELL POINTS, COMPRESSORS, PUMP HEATERS, FARM TRACTORS, FORM LINE GRADERS, DITCH WITCH TYPE TRENCHER, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, MISCELLANEOUS EQUIPMENT OPERATOR, SEAMAN PULVERIZING MIXER, POWER BROOM, SEEDING SPREADER, TIREMAN - (FOR POWER EQUIPMENT ) CONVEYORS, LOADERS OTHER THAN EUC TYPE, CONVEYORS, DRILLER SECOND CLASS, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT, AND FORKLIFT UNDER 20 FT. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED.$40.70$29.68$70.38
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 2 SPREADERS, ASPHALT PLANT ENGINEERS, ROLLERS (HIGH GRADE FINISHING), MACHINE SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT, AND FORKLIFTS 20FT AND OVER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED.$41.39$29.89$71.28
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; SINGLE PERSON OPERATION TRUCK CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED.$44.81$30.92$75.73
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1 PILE DRIVERS, ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, PAVER (BLACKTOP AND CONCRETE), GRADALLS, ALL FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPES BACKHOES, BOAT CAPTAINS, BATCH PLANT WITH MIXER, DRILL SELF CONTAINED (DRILL-MASTER TYPE), CMI AUTOGRADE, MILLING MACHINE, VEMEER SAW, CONVEYOR LOADER (EUCLID TYPE) SCRAPER AND TOURNAPULLS, BULLDOZERS AND TRACTORS, CONCRETE PUMPS, MOTOR PATROLS, MECHANIC WELDERS, LOG SKIDDER, SIDE BOOM, BOBCAT TYPE (WITH ATTACHMENTS), BORING MACHINES INCLUDING DIRECTIONAL BORING MACHINES, CHIPPER WITH BOOM, HYDRO AX, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED.$42.56$30.24$72.80
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT.$37.80$28.82$66.62
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT.$38.67$29.09$67.76
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT.$39.12$29.22$68.34
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT.$40.26$29.55$69.81
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT.$45.43$31.08$76.51
FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS$43.18$30.41$73.59
POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLE WAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT.$45.71$31.16$76.87
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT.$43.46$30.50$73.96
IRONWORKERS (ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, UNION AND YORK COUNTIES)$37.26$32.63$69.89
LABORER: GROUP 8 MINERS, DRILLERS, BLASTERS, PNEUMATIC SHIELD OPERATORS, LINING, SPOTTING AND TIMBER WORKMEN, REBAR STEEL PLACER, BONDING AND SECURING, WELDERS, AND CONCRETE SURFACERS - (FREE AIR TUNNELS AND ROCK SHAFTS)$31.43$19.99$51.42
(FREE AIR TUNNELS AND ROCK SHAFTS)$30.95$19.99$50.94
AND ROCK SHAFTS)$30.66$19.99$50.65
LABORER: GROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH REBAR, AND CONCRETE SURFACER$31.24$19.99$51.23
LABORER: GROUP 4 CAISSON-OPEN AIR BELOW 8 FEET, COFFERDAM OPEN AIR BELOW 8 FEET WHERE EXCAVATIONS FOR CIRCULAR CAISSONS AND COFFERDAMS 8 FT AND BELOW LEVEL OF NATURAL GRADE ADJACENT TO STARTING POINT, FORM SETTERS (ROAD) WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, CONCRETE RUBBERS, BLASTER$30.57$19.99$50.56
LABORER: GROUP 3 ASPHALT TAMPER, CONCRETE PITMAN, PUDDLERS, HIGHWAY GUIDE RAIL RIGHT OF WAY AND PROPERTY FENCE SLAB REINFORCEMENT PLACERS, LABORERS, LANDSCAPER, SEEDERS, PLANTERS, MAGAZINE TENDERS, LASER BEAM MEN FOR PIPE LAYING AND PAVING MACHINES,, RAILROAD TRACKMAN, SIGNALMAN, ASPHALT RAKERS, LUTE OR SCREED MAN, PNEUMATIC AND ELECTRIC TOOL OPERATORS, JACKMAMMERS, PAVING BREAKERS, CONCRETE SAWS, WHACKER VIBRATOR, CHAINSAW, HIGHWAY CONCRETE BLOCK LAYERS, SHEET HAMMER, PIPE LAYERS, WALK BEHIND ROLLERS, WALK BEHIND TRENCHER$30.22$19.99$50.21
LABORER: GROUP 2 HAZARDOUS/TOXIC/ASBESTOS WASTE HANDLER, LEAD PAINT HANDLER$33.23$19.99$53.22
LABORER: GROUP 1 FLAG PERSON$26.61$19.99$46.60
PAINTERS: SPRAY, SANDBLAST (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES)$27.97$16.30$44.27
PAINTERS: BRUSH (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES)$25.84$16.30$42.14
PAINTERS: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES)$33.72$16.30$50.02
PAINTERS: SPRAY (JUNIATA COUNTY)$30.56$23.72$54.28
PAINTERS: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY)$36.01$23.72$59.73
PAINTERS: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY)$30.56$23.72$54.28
PAINTERS: BRIDGE, TOWERS (JUNIATA COUNTY)$38.33$23.72$62.05
PAINTERS: SPRAY AND SANDBLAST (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES)$27.55$14.80$42.35
PAINTERS: BRUSH AND ROLLER (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES)$26.55$14.80$41.35
PAINTERS: BRIDGE; SPRAY (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES)$31.85$14.80$46.65
PAINTERS: BRIDGE; BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES)$30.85$14.80$45.65
PAINTERS: SPRAY, SANDBLAST (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES)$23.75$12.05$35.80
PAINTERS: BRUSH AND ROLLER (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES)$22.75$12.05$34.80
PAINTERS: BRIDGE; SPRAY (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES)$26.60$12.05$38.65
PAINTERS: BRIDGE; BRUSH, ROLLER (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES)$25.60$12.05$37.65
CEMENT MASON/CONCRETE FINISHER (MONROE COUNTY; (EXCEPT TOBYHANNA DEPOT))$37.13$14.30$51.43
CEMENT MASON/CONCRETE FINISHER (COLUMBIA COUNTY)$37.13$14.30$51.43
CEMENT MASON/CONCRETE FINISHER (BERKS (NORTHEASTERN PART LYING NORTH OF A LINE STARTING FROM THE SOUTHERN BOUNDARY LINE OF LEHIGH COUNTY CONTINUING THROUGH HUFFS CHURCH, FREDERICKSVILLE, DRYVILLE, LYON STATION, KUTZTOWN, KRUMSVILLE, AND STONEY RUN IN BERKS COUNTY TO THE LEHIGH COUNTY LINE), CARBON, LEHIGH, NORTHAMPTON (NORTHWEST PART INCLUDING THE TOWNS OF WALNUTPORT, BATH, AND NORTHAMPTON) COUNTIES)$35.18$24.25$59.43
PLASTERER (ADAMS, BERKS (PORTIONS OF), LANCASTER, AND LEBANON COUNTIES)$31.33$20.75$52.08
CEMENT MASON/CONCRETE FINISHER (ADAMS, LANCASTER AND YORK COUNTIES)$34.05$21.25$55.30
CEMENT MASON/CONCRETE FINISHER (MONROE COUNTY (TOBYHANNA ARMY DEPOT))$37.13$14.30$51.43
COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE$26.03$15.91$41.94
TRUCK DRIVER: GROUP 3 EUCLID-TYPE, OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS), STRADDLE TRUCKS, PUSHER, ARTICULATE DUMPED TRUCKS, LOW BOY TRAILERS, SEMI TRAILERS WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE. (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES)$42.43$0.00$42.43
(BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE$26.52$15.91$42.43
TRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS), ASPHALT DISTRIBUTORS, TRANSIT MIX (UNDER 5 YDS), TRANSIT MIX (OVER 5 YDS.), FLAT OR STAKE BODY (TANDEM), FUEL TRUCK A-FRAME/WINCH TRUCKS, DRY BATCH TRUCK, TRUCK MOUNTED SWEEPER AND VAC TRUCKS, BUSES, DUMPSTER (TANDEM) (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES)$41.94$0.00$41.94
TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE-AXLE), DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE), STAKE BODY TRCK (SINGLE AXLE), DUMPSTER (SINGLE AXLE) (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES)$41.87$0.00$41.87
TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE$25.96$15.91$41.87