Laborer prevailing wages: Nevada, county by county
700 current laborer rates across 58 active Nevada wage determinations. Rates differ by county and construction type; click a determination for revision history, diffs, and change alerts.
| County / area | Classification | Rate | Fringe | Total | Determination |
|---|---|---|---|---|---|
| Carson City | LABORER ((1) COMMON OR GENERAL) | $33.95 | $16.30 | $50.25 | NV20260041 Residential |
| Carson City | LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $34.20 | $16.30 | $50.50 | NV20260041 Residential |
| Carson City | LABORER ((4) PIPELAYER) | $34.45 | $16.30 | $50.75 | NV20260041 Residential |
| Carson City | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260070 Heavy |
| Carson City | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260090 Building |
| Carson City | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260107 Highway |
| Carson City | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260070 Heavy |
| Carson City | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260090 Building |
| Carson City | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260107 Highway |
| Carson City | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260070 Heavy |
| Carson City | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260090 Building |
| Carson City | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260107 Highway |
| Carson City | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260070 Heavy |
| Carson City | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260090 Building |
| Carson City | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260070 Heavy |
| Carson City | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260090 Building |
| Carson City | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260107 Highway |
| Carson City | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260070 Heavy |
| Carson City | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260090 Building |
| Carson City | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260107 Highway |
| Carson City | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260070 Heavy |
| Carson City | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260090 Building |
| Carson City | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260107 Highway |
| Carson City | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 5A; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260090 Building |
| Carson City | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260070 Heavy |
| Carson City | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260107 Highway |
| Carson City | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260107 Highway |
| Carson City | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260070 Heavy |
| Carson City | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260090 Building |
| Carson City | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260070 Heavy |
| Carson City | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260090 Building |
| Carson City | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260107 Highway |
| Carson City | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260070 Heavy |
| Carson City | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260090 Building |
| Carson City | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260107 Highway |
| Carson City | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260090 Building |
| Carson City | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260070 Heavy |
| Carson City | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260107 Highway |
| Carson City | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260070 Heavy |
| Carson City | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260090 Building |
| Carson City | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260107 Highway |
| Churchill | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260060 Heavy |
| Churchill | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260077 Building |
| Churchill | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260094 Highway |
| Churchill | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260060 Heavy |
| Churchill | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260077 Building |
| Churchill | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260094 Highway |
| Churchill | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260060 Heavy |
| Churchill | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260077 Building |
| Churchill | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260094 Highway |
| Churchill | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260060 Heavy |
| Churchill | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260077 Building |
| Churchill | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260060 Heavy |
| Churchill | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260077 Building |
| Churchill | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260094 Highway |
| Churchill | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260060 Heavy |
| Churchill | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260077 Building |
| Churchill | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260094 Highway |
| Churchill | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260060 Heavy |
| Churchill | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260077 Building |
| Churchill | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260094 Highway |
| Churchill | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260060 Heavy |
| Churchill | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260077 Building |
| Churchill | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260094 Highway |
| Churchill | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260094 Highway |
| Churchill | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260060 Heavy |
| Churchill | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260077 Building |
| Churchill | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260060 Heavy |
| Churchill | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260077 Building |
| Churchill | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260094 Highway |
| Churchill | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260060 Heavy |
| Churchill | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260077 Building |
| Churchill | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260094 Highway |
| Churchill | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260077 Building |
| Churchill | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260060 Heavy |
| Churchill | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260094 Highway |
| Churchill | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260060 Heavy |
| Churchill | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260077 Building |
| Churchill | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260094 Highway |
| Clark | LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $30.30 | $15.02 | $45.32 | NV20260042 Residential |
| Clark | LABORER ((4) PIPELAYER) | $30.55 | $15.02 | $45.57 | NV20260042 Residential |
| Clark | LABORER: COMMON OR GENERAL | $15.65 | $0.00 | $15.65 | NV20260042 Residential |
| Clark | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, cardboard boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector-(ExcludesTenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub- Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260071 Heavy |
| Clark | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, cardboard boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector-(ExcludesTenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub- Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260091 Building |
| Clark | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, cardboard boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector-(ExcludesTenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub- Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260108 Highway |
| Clark | Laborers: Group 1-A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture; Polishing stainless steel in hotel kitchens; Sweeping and vacuuming hallways and finished rooms and completed casino areas; Washing windows on first floor and similar duties) | $39.53 | $34.24 | $73.77 | NV20260108 Highway |
| Clark | Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture; Polishing stainless steel in hotel kitchens; Sweeping and vacuuming hallways and finished rooms and completed casino areas; Washing windows on first floor and similar duties) | $39.53 | $34.24 | $73.77 | NV20260071 Heavy |
| Clark | Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture; Polishing stainless steel in hotel kitchens; Sweeping and vacuuming hallways and finished rooms and completed casino areas; Washing windows on first floor and similar duties) | $39.53 | $34.24 | $73.77 | NV20260091 Building |
| Clark | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for Is operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260071 Heavy |
| Clark | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for Is operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260091 Building |
| Clark | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for Is operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260108 Highway |
| Clark | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man.excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift - A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material.and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260071 Heavy |
| Clark | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man.excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift - A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material.and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260091 Building |
| Clark | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man.excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift - A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material.and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260108 Highway |
| Clark | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260071 Heavy |
| Clark | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260091 Building |
| Clark | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260108 Highway |
| Clark | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing;Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260071 Heavy |
| Clark | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing;Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260091 Building |
| Clark | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing;Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260108 Highway |
| Clark | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260071 Heavy |
| Clark | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260091 Building |
| Clark | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260108 Highway |
| Clark | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260071 Heavy |
| Clark | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260091 Building |
| Clark | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260108 Highway |
| Clark | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260071 Heavy |
| Clark | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260091 Building |
| Clark | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260108 Highway |
| Clark | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260071 Heavy |
| Clark | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260091 Building |
| Clark | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260108 Highway |
| Clark | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260071 Heavy |
| Clark | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260091 Building |
| Clark | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260108 Highway |
| Clark | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260071 Heavy |
| Clark | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260091 Building |
| Clark | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260108 Highway |
| Clark | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260071 Heavy |
| Clark | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260091 Building |
| Clark | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260108 Highway |
| Clark | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; Employees shall be properly certified and/or licensed at time of dispatch) | $41.34 | $34.24 | $75.58 | NV20260071 Heavy |
| Clark | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; Employees shall be properly certified and/or licensed at time of dispatch) | $41.34 | $34.24 | $75.58 | NV20260091 Building |
| Clark | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; Employees shall be properly certified and/or licensed at time of dispatch) | $41.34 | $34.24 | $75.58 | NV20260108 Highway |
| Clark | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260091 Building |
| Clark | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher: Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260071 Heavy |
| Clark | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher: Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260108 Highway |
| Clark, Lincoln, Nye | LABORER GROUP 1 BUILDING/OFFICE CLEANUP: CESSPOOL DIGGER & INSTALLER; DRINKING WATER; FENCE BUILDER; FINE GRADER, HIGHWAY & STREET; FLAGPERSON; GAS & OIL PIPELINE LABORER; GAS & OIL PIPELINE WRAPPER - POT TENDER AND FORM MAN; GUINEA CHASER; PACKING ROD STEEL AND PLANS; GENERAL (CONSTRUCTION CLEANUP); DEMOLITION; LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER; MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS; RIP RAP STONE PAVER; ROTO-SCRAPER; SCALER; SEPTIC TANK DIGGER & INSTALLER (LEADMAN); TANK SCALER AND CLEANER; TOOL ATTENDANT (JOBSITE ONLY); TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE OF BRUSH SHEDDERS; WINDOW CLEANER (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT | $41.13 | $27.22 | $68.35 | NV20260002 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER GROUP 1: BUILDING/OFFICE CLEANUP, FLAGPERSON; ZONE PAY: $3.75 FOOT | $46.40 | $29.35 | $75.75 | NV20260001 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER GROUP 2 ASPHALT RAKER, IRONER, SPREADER; BUGGYMOBILE MAN; CEMENT DUMPER; CONCRETE CORE CUTTER, SAWMAN AND CEMENT GRINDING OPERATOR; CONCRETE CURER; CRIBBER OR SHORER; CUTTING TORCH OPERATOR (DEMOLITION); DRILLER; DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES; GAS & OIL PIPELINE WRAPPER; HEAD ROCK SLINGER; JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER; LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE; MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECTRIC TOOLS, VIBRATING MACHINES AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN, INCLUDING HAND GUIDED DITCH WITCH AND HAND-TYPE ROLLER); PAVING, AIRPORT RUNWAYS & SIMILAR WORK; PESTICIDE, HERBICIDE, INSECTICIDE APPLICATOR; POTHOLER; POWDERMAN; ROCK SLINGER; SANDBLASTER (NOZZLEMAN); SANDBLASTER (POT TENDER); SHOTCRETE (NOZZLEMAN); SHOTCRETE (POT TENDER); STEEL HEADERBOARD MAN. (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT | $41.39 | $27.22 | $68.61 | NV20260002 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER GROUP 2: LABORER - GENERAL (CONSTRUCTION CLEANUP, ETC.), DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT (JOBSITE ONLY), GAS & OIL PIPELINE, WINDOW CLEANERS, FINE GRADER, HIGHWAY & STREET PAVING, AIRPORT RUNWAYS & SIMILAR WORK, GUINEA CHASER, LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER, PACKING ROD STEEL AND PANS; ZONE PAY: $3.75 FOOT | $47.34 | $29.35 | $76.69 | NV20260001 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER GROUP 3 ASBESTOS ABATEMENT; HAZARDOUS WASTE; LEAD ABATEMENT; MICROBIAL REMEDIATION WHICH INCLUDES HANTAVIRUS; PETROCHEMICAL HANDLER; RADIATION WORKER. (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT | $41.57 | $27.22 | $68.79 | NV20260002 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER GROUP 3: ASBESTOS ABATEMENT, CHUCKTENDER (EXCEPT TUNNELS), GAS & OIL PIPELINE WRAPPER-POT TENDER AND FORM MAN, OPERATOR OF CEMENT GRINDING MACHINE, ROTO-SCRAPER, SANDBLASTER (POT TENDER), SCALER, SEPTIC TANK DIGGER & INSTALLER (LEADMAN),MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS, TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHEDDERS, TANK SCALER AND CLEANER, CONCRETE SAWMAN, CONCRETE CORE CUTTER, MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECTRIC TOOLS, VIBRATING MACHINES AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN, INCLUDING HANDGUIDED DITCH WITCH AND HAND-TYPE ROLLER), ASPHALT RAKER, IRONER, SPREADER, SLURRY SEALER, BUGGYMOBILE MAN, CEMENT DUMPER, CONCRETE CURER, CESSPOOL DIGGER & INSTALLER, RIP RAP STONE PAVER; ZONE PAY: $3.75 FOOT | $47.55 | $29.35 | $76.90 | NV20260001 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER GROUP 4: JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER, ROCK SLINGER, LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE, GAS AND OIL PIPELINE WRAPPER, CUTTING TORCH OPERATOR (DEMOLLITION); ZONE PAY: $3.75 FOOT | $47.79 | $29.35 | $77.14 | NV20260001 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER GROUP 5: DRILLER, HEAD ROCK SLINGER, SANDBLASTER (NOZZLEMAN), STEEL HEADERBOARD MAN, POWDERMAN, CRIBBER OR SHORER; ZONE PAY: $3.75 FOOT | $48.05 | $29.35 | $77.40 | NV20260001 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER GROUP 6: HERBICIDE, PESTICIDE, HANTAVIRUS SUPPRESSION; ZONE PAY: $3.75 FOOT | $48.35 | $29.35 | $77.70 | NV20260001 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER: BULLGANG, MUCKER, TRACKMAN (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT | $46.44 | $27.27 | $73.71 | NV20260002 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER: MINER-TUNNEL HARDROCK (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT | $46.69 | $27.27 | $73.96 | NV20260002 Building, Heavy, Highway |
| Clark, Lincoln, Nye | LABORER: SHAFT, RAISE, STOPE MINER (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT | $47.69 | $27.27 | $74.96 | NV20260002 Building, Heavy, Highway |
| Douglas | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260068 Heavy |
| Douglas | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260078 Building |
| Douglas | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260095 Highway |
| Douglas | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260068 Heavy |
| Douglas | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260078 Building |
| Douglas | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260095 Highway |
| Douglas | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260068 Heavy |
| Douglas | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260078 Building |
| Douglas | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260095 Highway |
| Douglas | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260068 Heavy |
| Douglas | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260078 Building |
| Douglas | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260068 Heavy |
| Douglas | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260078 Building |
| Douglas | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260095 Highway |
| Douglas | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260068 Heavy |
| Douglas | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260095 Highway |
| Douglas | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260068 Heavy |
| Douglas | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260078 Building |
| Douglas | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260095 Highway |
| Douglas | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260068 Heavy |
| Douglas | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260078 Building |
| Douglas | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260095 Highway |
| Douglas | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260095 Highway |
| Douglas | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260068 Heavy |
| Douglas | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260078 Building |
| Douglas | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260068 Heavy |
| Douglas | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260078 Building |
| Douglas | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260095 Highway |
| Douglas | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260068 Heavy |
| Douglas | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260078 Building |
| Douglas | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260095 Highway |
| Douglas | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260078 Building |
| Douglas | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260068 Heavy |
| Douglas | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260095 Highway |
| Douglas | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260068 Heavy |
| Douglas | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260078 Building |
| Douglas | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260095 Highway |
| Elko | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260061 Heavy |
| Elko | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260083 Building |
| Elko | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260103 Highway |
| Elko | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260061 Heavy |
| Elko | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260083 Building |
| Elko | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260103 Highway |
| Elko | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260061 Heavy |
| Elko | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260083 Building |
| Elko | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260103 Highway |
| Elko | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260061 Heavy |
| Elko | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260083 Building |
| Elko | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260061 Heavy |
| Elko | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260083 Building |
| Elko | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260103 Highway |
| Elko | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260061 Heavy |
| Elko | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260083 Building |
| Elko | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260103 Highway |
| Elko | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260061 Heavy |
| Elko | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260083 Building |
| Elko | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260103 Highway |
| Elko | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260061 Heavy |
| Elko | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260083 Building |
| Elko | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260103 Highway |
| Elko | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260103 Highway |
| Elko | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260061 Heavy |
| Elko | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260083 Building |
| Elko | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260061 Heavy |
| Elko | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260083 Building |
| Elko | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260103 Highway |
| Elko | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260061 Heavy |
| Elko | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260083 Building |
| Elko | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260103 Highway |
| Elko | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260083 Building |
| Elko | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260061 Heavy |
| Elko | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260103 Highway |
| Elko | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260061 Heavy |
| Elko | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260083 Building |
| Elko | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260103 Highway |
| Esmeralda | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, card board boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector- (Excludes Tenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub-Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, card board boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector- (Excludes Tenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub-Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260085 Building |
| Esmeralda | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, card board boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector- (Excludes Tenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub-Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260105 Highway |
| Esmeralda | Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and vacuuming hallways and finished rooms and completed casino areas, Washing windows on first floor and similar duties) | $39.53 | $34.24 | $73.77 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and vacuuming hallways and finished rooms and completed casino areas, Washing windows on first floor and similar duties) | $39.53 | $34.24 | $73.77 | NV20260085 Building |
| Esmeralda | Laborers: Group 1A (Flagger/flag person; Pilot car) | $39.53 | $34.24 | $73.77 | NV20260105 Highway |
| Esmeralda | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for its operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for its operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260085 Building |
| Esmeralda | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for its operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260105 Highway |
| Esmeralda | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man, excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift -A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material, and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man, excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift -A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material, and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260085 Building |
| Esmeralda | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man, excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift -A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material, and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260105 Highway |
| Esmeralda | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260085 Building |
| Esmeralda | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260105 Highway |
| Esmeralda | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing; Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing; Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260085 Building |
| Esmeralda | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing; Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260105 Highway |
| Esmeralda | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260085 Building |
| Esmeralda | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260105 Highway |
| Esmeralda | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260085 Building |
| Esmeralda | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260105 Highway |
| Esmeralda | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260085 Building |
| Esmeralda | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260105 Highway |
| Esmeralda | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260085 Building |
| Esmeralda | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260105 Highway |
| Esmeralda | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260085 Building |
| Esmeralda | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260105 Highway |
| Esmeralda | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260085 Building |
| Esmeralda | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260105 Highway |
| Esmeralda | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260085 Building |
| Esmeralda | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260105 Highway |
| Esmeralda | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above group III when wearing protective suit or respirator; Employees shall be properly certified and/or licensed at time of dispatch.) | $41.34 | $34.24 | $75.58 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above group III when wearing protective suit or respirator; Employees shall be properly certified and/or licensed at time of dispatch.) | $41.34 | $34.24 | $75.58 | NV20260085 Building |
| Esmeralda | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above group III when wearing protective suit or respirator; Employees shall be properly certified and/or licensed at time of dispatch.) | $41.34 | $34.24 | $75.58 | NV20260105 Highway |
| Esmeralda | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260075 Heavy |
| Esmeralda | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260085 Building |
| Esmeralda | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260105 Highway |
| Esmeralda + 12 more | LABORER (CONCRETE WORKER) | $11.67 | $0.00 | $11.67 | NV20260045 Residential |
| Esmeralda + 12 more | LABORER (GENERAL) | $8.24 | $0.00 | $8.24 | NV20260045 Residential |
| Esmeralda + 12 more | LABORER: PIPELAYER | $8.91 | $0.00 | $8.91 | NV20260045 Residential |
| Eureka | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260062 Heavy |
| Eureka | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260084 Building |
| Eureka | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260104 Highway |
| Eureka | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260062 Heavy |
| Eureka | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260084 Building |
| Eureka | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260104 Highway |
| Eureka | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260062 Heavy |
| Eureka | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260084 Building |
| Eureka | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260104 Highway |
| Eureka | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260062 Heavy |
| Eureka | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260084 Building |
| Eureka | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260062 Heavy |
| Eureka | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260084 Building |
| Eureka | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260104 Highway |
| Eureka | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260062 Heavy |
| Eureka | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260084 Building |
| Eureka | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260104 Highway |
| Eureka | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260062 Heavy |
| Eureka | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260084 Building |
| Eureka | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260104 Highway |
| Eureka | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260062 Heavy |
| Eureka | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260084 Building |
| Eureka | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260104 Highway |
| Eureka | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260104 Highway |
| Eureka | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260062 Heavy |
| Eureka | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260084 Building |
| Eureka | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260062 Heavy |
| Eureka | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260084 Building |
| Eureka | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260104 Highway |
| Eureka | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260062 Heavy |
| Eureka | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260084 Building |
| Eureka | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260104 Highway |
| Eureka | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260084 Building |
| Eureka | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260062 Heavy |
| Eureka | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260104 Highway |
| Eureka | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260062 Heavy |
| Eureka | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260084 Building |
| Eureka | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260104 Highway |
| Humboldt | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260063 Heavy |
| Humboldt | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260079 Building |
| Humboldt | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260096 Highway |
| Humboldt | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260063 Heavy |
| Humboldt | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260079 Building |
| Humboldt | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260096 Highway |
| Humboldt | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260063 Heavy |
| Humboldt | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260079 Building |
| Humboldt | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260096 Highway |
| Humboldt | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260063 Heavy |
| Humboldt | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260079 Building |
| Humboldt | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260063 Heavy |
| Humboldt | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260079 Building |
| Humboldt | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260096 Highway |
| Humboldt | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260063 Heavy |
| Humboldt | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260079 Building |
| Humboldt | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260096 Highway |
| Humboldt | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260063 Heavy |
| Humboldt | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260079 Building |
| Humboldt | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260096 Highway |
| Humboldt | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260063 Heavy |
| Humboldt | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260079 Building |
| Humboldt | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260096 Highway |
| Humboldt | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260096 Highway |
| Humboldt | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260063 Heavy |
| Humboldt | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260079 Building |
| Humboldt | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260063 Heavy |
| Humboldt | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260079 Building |
| Humboldt | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260096 Highway |
| Humboldt | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260063 Heavy |
| Humboldt | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260079 Building |
| Humboldt | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260096 Highway |
| Humboldt | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260079 Building |
| Humboldt | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260063 Heavy |
| Humboldt | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260096 Highway |
| Humboldt | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260063 Heavy |
| Humboldt | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260079 Building |
| Humboldt | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260096 Highway |
| Lander | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260064 Heavy |
| Lander | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260086 Building |
| Lander | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260097 Highway |
| Lander | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260064 Heavy |
| Lander | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260086 Building |
| Lander | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260097 Highway |
| Lander | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260064 Heavy |
| Lander | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260086 Building |
| Lander | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260097 Highway |
| Lander | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260064 Heavy |
| Lander | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260086 Building |
| Lander | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260064 Heavy |
| Lander | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260086 Building |
| Lander | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260097 Highway |
| Lander | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260064 Heavy |
| Lander | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260086 Building |
| Lander | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260097 Highway |
| Lander | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260064 Heavy |
| Lander | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260086 Building |
| Lander | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260097 Highway |
| Lander | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260064 Heavy |
| Lander | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260086 Building |
| Lander | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260097 Highway |
| Lander | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260097 Highway |
| Lander | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260064 Heavy |
| Lander | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260086 Building |
| Lander | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260064 Heavy |
| Lander | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260086 Building |
| Lander | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260097 Highway |
| Lander | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260064 Heavy |
| Lander | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260086 Building |
| Lander | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260097 Highway |
| Lander | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260086 Building |
| Lander | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260064 Heavy |
| Lander | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260097 Highway |
| Lander | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260064 Heavy |
| Lander | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260086 Building |
| Lander | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260097 Highway |
| Lincoln | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, card board boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector- (Excludes Tenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub-Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260065 Heavy |
| Lincoln | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, card board boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector- (Excludes Tenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub-Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260080 Building |
| Lincoln | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, card board boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector- (Excludes Tenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub-Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260106 Highway |
| Lincoln | Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and vacuuming hallways and finished rooms and completed casino areas, Washing windows on first floor and similar duties) | $39.53 | $34.24 | $73.77 | NV20260065 Heavy |
| Lincoln | Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and vacuuming hallways and finished rooms and completed casino areas, Washing windows on first floor and similar duties) | $39.53 | $34.24 | $73.77 | NV20260080 Building |
| Lincoln | Laborers: Group 1A (Flagger/flag person; Pilot car) | $39.53 | $34.24 | $73.77 | NV20260106 Highway |
| Lincoln | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for its operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260065 Heavy |
| Lincoln | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for its operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260080 Building |
| Lincoln | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for its operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260106 Highway |
| Lincoln | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man, excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift -A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material, and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260065 Heavy |
| Lincoln | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man, excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift -A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material, and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260080 Building |
| Lincoln | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man, excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift -A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material, and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260106 Highway |
| Lincoln | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260065 Heavy |
| Lincoln | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260080 Building |
| Lincoln | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260106 Highway |
| Lincoln | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing; Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260065 Heavy |
| Lincoln | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing; Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260080 Building |
| Lincoln | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing; Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260106 Highway |
| Lincoln | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260065 Heavy |
| Lincoln | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260080 Building |
| Lincoln | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260106 Highway |
| Lincoln | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260065 Heavy |
| Lincoln | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260080 Building |
| Lincoln | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260106 Highway |
| Lincoln | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260065 Heavy |
| Lincoln | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260080 Building |
| Lincoln | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260106 Highway |
| Lincoln | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260065 Heavy |
| Lincoln | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260080 Building |
| Lincoln | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260106 Highway |
| Lincoln | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260065 Heavy |
| Lincoln | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260080 Building |
| Lincoln | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260106 Highway |
| Lincoln | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260065 Heavy |
| Lincoln | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260080 Building |
| Lincoln | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260106 Highway |
| Lincoln | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260065 Heavy |
| Lincoln | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260080 Building |
| Lincoln | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260106 Highway |
| Lincoln | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above group III when wearing protective suit or respirator; Employees shall be properly certified and/or licensed at time of dispatch.) | $41.34 | $34.24 | $75.58 | NV20260065 Heavy |
| Lincoln | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above group III when wearing protective suit or respirator; Employees shall be properly certified and/or licensed at time of dispatch.) | $41.34 | $34.24 | $75.58 | NV20260080 Building |
| Lincoln | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above group III when wearing protective suit or respirator; Employees shall be properly certified and/or licensed at time of dispatch.) | $41.34 | $34.24 | $75.58 | NV20260106 Highway |
| Lincoln | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260065 Heavy |
| Lincoln | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260080 Building |
| Lincoln | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260106 Highway |
| Lyon | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260069 Heavy |
| Lyon | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260081 Building |
| Lyon | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260098 Highway |
| Lyon | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260069 Heavy |
| Lyon | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260081 Building |
| Lyon | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260098 Highway |
| Lyon | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260069 Heavy |
| Lyon | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260081 Building |
| Lyon | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260098 Highway |
| Lyon | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260069 Heavy |
| Lyon | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260081 Building |
| Lyon | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260069 Heavy |
| Lyon | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260081 Building |
| Lyon | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260098 Highway |
| Lyon | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260069 Heavy |
| Lyon | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260081 Building |
| Lyon | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260098 Highway |
| Lyon | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260069 Heavy |
| Lyon | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260081 Building |
| Lyon | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260098 Highway |
| Lyon | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260069 Heavy |
| Lyon | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260081 Building |
| Lyon | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260098 Highway |
| Lyon | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260098 Highway |
| Lyon | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260069 Heavy |
| Lyon | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260081 Building |
| Lyon | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260069 Heavy |
| Lyon | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260081 Building |
| Lyon | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260098 Highway |
| Lyon | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260069 Heavy |
| Lyon | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260081 Building |
| Lyon | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260098 Highway |
| Lyon | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260081 Building |
| Lyon | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260069 Heavy |
| Lyon | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260098 Highway |
| Lyon | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260069 Heavy |
| Lyon | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260081 Building |
| Lyon | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260098 Highway |
| Mineral | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260076 Heavy |
| Mineral | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260087 Building |
| Mineral | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260099 Highway |
| Mineral | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260076 Heavy |
| Mineral | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260087 Building |
| Mineral | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260099 Highway |
| Mineral | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260076 Heavy |
| Mineral | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260087 Building |
| Mineral | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260099 Highway |
| Mineral | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260076 Heavy |
| Mineral | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260087 Building |
| Mineral | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260076 Heavy |
| Mineral | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260087 Building |
| Mineral | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260099 Highway |
| Mineral | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260076 Heavy |
| Mineral | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260087 Building |
| Mineral | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260099 Highway |
| Mineral | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260076 Heavy |
| Mineral | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260087 Building |
| Mineral | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260099 Highway |
| Mineral | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260076 Heavy |
| Mineral | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260087 Building |
| Mineral | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260099 Highway |
| Mineral | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260099 Highway |
| Mineral | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260076 Heavy |
| Mineral | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260087 Building |
| Mineral | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260076 Heavy |
| Mineral | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260087 Building |
| Mineral | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260099 Highway |
| Mineral | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260076 Heavy |
| Mineral | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260087 Building |
| Mineral | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260099 Highway |
| Mineral | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260087 Building |
| Mineral | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260076 Heavy |
| Mineral | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260099 Highway |
| Mineral | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260076 Heavy |
| Mineral | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260087 Building |
| Mineral | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260099 Highway |
| Nye | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, card board boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector- (Excludes Tenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub-Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260074 Heavy |
| Nye | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, card board boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector- (Excludes Tenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub-Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260082 Building |
| Nye | Laborers: Group 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, demolition, surgical demolition, selective demolition or Solar-Stringing of posts, installation of posts and piles, installation and bolting together of all rakes, tray tables and torque tubes. Running all bobcats, skid steers, forklifts, Turchis or similar equipment for post installation. Trashing out crates, card board boxes and trash within the solar arrays and Solar project boundaries.; Laborer, packing rod steel and pans; Laborer, temporary water lines (portable type); Laborer, loading and unloading solar panels, crates and pallets; Laborer, handling, Installing, and setting of all solar panels/ wire management but not connections Landscape gardener (Must have knowledge of plant materials and how to plant them. Lays out plant arrangements to-follow the landscape plan); Stone pavers; Nurseryman; Tarman and mortar man, kettle man, potman and man applying asphalt, lay cold creosote, fine and similar type materials. ("Applying" means applying, dipping, brushing or handling of such materials for pipe wrapping and water proofing.); Underground laborer, including caisson bellowers; Window cleaner; Scaffold Erector- (Excludes Tenders); Fence Erector includes but not limited to: erecting or repairing, Chain Link, wooden, metal, vinyl, steel, tortoise, wire/ wire mesh or temporary fence. Mortarless, Barrier Wall and/or Retaining Walls; Digging post holes with spade. Post hole digger or power-driven auger; Aligning post through the use of lines or by sighting; verifying vertical alignment of post with a plumb bob or spirit level.; Mechanical Stabilized Earth Wall; Material Handler - for all trades, including but not limited to stacking and packing of all drywall, taping mud, paint, wallpaper, wall coverings and material associated there with including Demolition of said materials.; All Construction cleanup and Final clean-up (picking up debris, sweeping, scraping and janitorial work, including final clean-up), on all jobsites shall be the work of the Laborers, including mass jobsite clean-up by All Contractors and Sub-Contractors. except as provided in Group 1A; Tool Crib; Light Tool Repairman Certified; Firewatch; Rigging and signaling when assigned by the Contractor and/or performing the work of a Laborer or tending another craft) | $41.03 | $34.24 | $75.27 | NV20260100 Highway |
| Nye | Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and vacuuming hallways and finished rooms and completed casino areas, Washing windows on first floor and similar duties) | $39.53 | $34.24 | $73.77 | NV20260074 Heavy |
| Nye | Laborers: Group 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture, Polishing stainless steel in hotel kitchens, Sweeping and vacuuming hallways and finished rooms and completed casino areas, Washing windows on first floor and similar duties) | $39.53 | $34.24 | $73.77 | NV20260082 Building |
| Nye | Laborers: Group 1A (Flagger/flag person; Pilot car) | $39.53 | $34.24 | $73.77 | NV20260100 Highway |
| Nye | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for its operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260074 Heavy |
| Nye | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for its operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260082 Building |
| Nye | Laborers: Group 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for its operation, impact wrench multi-plate and similar mechanical tools not separately classified herein Riprap stonepaver; Rota-scraper; Sandblaster (pot tender); Septic tank digger and installer (lead man) Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredders) | $41.24 | $34.24 | $75.48 | NV20260100 Highway |
| Nye | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man, excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift -A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material, and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260074 Heavy |
| Nye | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man, excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift -A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material, and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260082 Building |
| Nye | Laborers: Group 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane and oiler of all materials; Concrete saw man, excluding tractor type, cutting scoring old or new concrete Operator of cement grinding machine; Rock slinger; Scaler (using boswain chair or safety belt or power tools under 100 feet); Forklift -A journeyman shall hold Forklift certification at time of referral for duration of employment. Bobcat/skid steer, Gannon tractor; Working Dust control monitor, Single Axle water and Single Axle Dump Trucks Hodcarrier-Mason Tender/Mason Finisher; Decorative Rock Installer - (Ponds, Waterfalls, etc.) Concrete striking, floating, epoxy finish, self-leveling material, and overlay; Shotcrete/Gunnite) | $41.34 | $34.24 | $75.58 | NV20260100 Highway |
| Nye | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260074 Heavy |
| Nye | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260082 Building |
| Nye | Laborers: Group 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | $76.58 | NV20260100 Highway |
| Nye | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing; Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260074 Heavy |
| Nye | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing; Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260082 Building |
| Nye | Laborers: Group 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing; Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | $75.67 | NV20260100 Highway |
| Nye | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260074 Heavy |
| Nye | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260082 Building |
| Nye | Laborers: Group 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6" pipe and over) | $41.53 | $34.24 | $75.77 | NV20260100 Highway |
| Nye | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260074 Heavy |
| Nye | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260082 Building |
| Nye | Laborers: Group 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | $88.43 | NV20260100 Highway |
| Nye | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260074 Heavy |
| Nye | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260082 Building |
| Nye | Laborers: Group 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | $87.93 | NV20260100 Highway |
| Nye | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260074 Heavy |
| Nye | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260082 Building |
| Nye | Laborers: Group 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | $87.68 | NV20260100 Highway |
| Nye | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260074 Heavy |
| Nye | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260082 Building |
| Nye | Laborers: Group 6D (Miner-Welder) | $54.05 | $34.24 | $88.29 | NV20260100 Highway |
| Nye | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260074 Heavy |
| Nye | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260082 Building |
| Nye | Laborers: Group 6E (Tunnel Boring Machine) | $53.69 | $34.24 | $87.93 | NV20260100 Highway |
| Nye | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260074 Heavy |
| Nye | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260082 Building |
| Nye | Laborers: Group 6F High Scaler | $60.15 | $34.24 | $94.39 | NV20260100 Highway |
| Nye | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above group III when wearing protective suit or respirator; Employees shall be properly certified and/or licensed at time of dispatch.) | $41.34 | $34.24 | $75.58 | NV20260074 Heavy |
| Nye | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above group III when wearing protective suit or respirator; Employees shall be properly certified and/or licensed at time of dispatch.) | $41.34 | $34.24 | $75.58 | NV20260082 Building |
| Nye | Laborers: Group 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; $0.50 wage rate above group III when wearing protective suit or respirator; Employees shall be properly certified and/or licensed at time of dispatch.) | $41.34 | $34.24 | $75.58 | NV20260100 Highway |
| Nye | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260074 Heavy |
| Nye | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260082 Building |
| Nye | Laborers: Group 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether by bucket, hod, wheelbarrow, buggy or other motorized unit for such purpose, including forklifts.) | $42.43 | $34.24 | $76.67 | NV20260100 Highway |
| Pershing | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260066 Heavy |
| Pershing | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260088 Building |
| Pershing | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260101 Highway |
| Pershing | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260066 Heavy |
| Pershing | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260088 Building |
| Pershing | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260101 Highway |
| Pershing | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260066 Heavy |
| Pershing | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260088 Building |
| Pershing | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260101 Highway |
| Pershing | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260066 Heavy |
| Pershing | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260088 Building |
| Pershing | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260066 Heavy |
| Pershing | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260088 Building |
| Pershing | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260101 Highway |
| Pershing | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260066 Heavy |
| Pershing | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260088 Building |
| Pershing | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260101 Highway |
| Pershing | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260066 Heavy |
| Pershing | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260088 Building |
| Pershing | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260101 Highway |
| Pershing | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260066 Heavy |
| Pershing | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260088 Building |
| Pershing | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260101 Highway |
| Pershing | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260101 Highway |
| Pershing | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260066 Heavy |
| Pershing | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260088 Building |
| Pershing | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260066 Heavy |
| Pershing | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260088 Building |
| Pershing | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260101 Highway |
| Pershing | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260066 Heavy |
| Pershing | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260088 Building |
| Pershing | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260101 Highway |
| Pershing | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260088 Building |
| Pershing | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260066 Heavy |
| Pershing | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260101 Highway |
| Pershing | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260066 Heavy |
| Pershing | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260088 Building |
| Pershing | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260101 Highway |
| Storey | LABORER ((1) COMMON OR GENERAL) | $33.95 | $16.30 | $50.25 | NV20260043 Residential |
| Storey | LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $34.20 | $16.30 | $50.50 | NV20260043 Residential |
| Storey | LABORER ((4) PIPELAYER) | $34.45 | $16.30 | $50.75 | NV20260043 Residential |
| Storey | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260072 Heavy |
| Storey | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260092 Building |
| Storey | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260109 Highway |
| Storey | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260072 Heavy |
| Storey | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260092 Building |
| Storey | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260109 Highway |
| Storey | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260072 Heavy |
| Storey | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260092 Building |
| Storey | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260109 Highway |
| Storey | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260072 Heavy |
| Storey | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260092 Building |
| Storey | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260072 Heavy |
| Storey | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260092 Building |
| Storey | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260109 Highway |
| Storey | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260072 Heavy |
| Storey | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260092 Building |
| Storey | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260109 Highway |
| Storey | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260072 Heavy |
| Storey | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260092 Building |
| Storey | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260109 Highway |
| Storey | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260072 Heavy |
| Storey | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260092 Building |
| Storey | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260109 Highway |
| Storey | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260109 Highway |
| Storey | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260072 Heavy |
| Storey | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260092 Building |
| Storey | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260072 Heavy |
| Storey | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260092 Building |
| Storey | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260109 Highway |
| Storey | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260072 Heavy |
| Storey | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260092 Building |
| Storey | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260109 Highway |
| Storey | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260092 Building |
| Storey | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260072 Heavy |
| Storey | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260109 Highway |
| Storey | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260072 Heavy |
| Storey | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260092 Building |
| Storey | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260109 Highway |
| Washoe | LABORER ((1) COMMON OR GENERAL) | $33.95 | $16.30 | $50.25 | NV20260044 Residential |
| Washoe | LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $34.20 | $16.30 | $50.50 | NV20260044 Residential |
| Washoe | LABORER ((4) PIPELAYER) | $34.45 | $16.30 | $50.75 | NV20260044 Residential |
| Washoe | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260073 Heavy |
| Washoe | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260093 Building |
| Washoe | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260110 Highway |
| Washoe | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260073 Heavy |
| Washoe | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260093 Building |
| Washoe | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260110 Highway |
| Washoe | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260073 Heavy |
| Washoe | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260093 Building |
| Washoe | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260110 Highway |
| Washoe | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260073 Heavy |
| Washoe | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260093 Building |
| Washoe | Laborers: Group 1 (All cleanup work of debris, grounds, and building including windows and tile; Dumpmen or Spotter (other than asphalt); Handling and Servicing of Flares, Watchmen; General Laborer; Guideposts and Highway Signs; Guardrail Erection and Dismantling; Limber, Brushloader and Piler; Pavement Marking and Highway Striping; Traffic Barrier Erector; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260073 Heavy |
| Washoe | Laborers: Group 1 (All cleanup work of debris, grounds, and building including windows and tile; Dumpmen or Spotter (other than asphalt); Handling and Servicing of Flares; General Laborer; Guideposts and Highway Signs; Guardrail Erection and Dismantling; Limber, Brushloader and Piler; Pavement Marking and Highway Striping; Traffic Barrier Erector; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260093 Building |
| Washoe | Laborers: Group 1 (All cleanup work of debris, grounds, and building including windows and tile; Dumpmen or Spotter (other than asphalt); Handling and Servicing of Flares; General Laborer; Guideposts and Highway Signs; Guardrail Erection and Dismantling; Limber, Brushloader and Piler; Pavement Marking and Highway Striping; Traffic Barrier Erector; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260110 Highway |
| Washoe | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260073 Heavy |
| Washoe | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260093 Building |
| Washoe | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260110 Highway |
| Washoe | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, cleaning, oiling and moving to the next point of installation.; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood or metal) handling, cleaning and stripping of Loading and unloading, (Carrying and handling of all rods and material for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3); Waterproofing work; Epoxy rebar/dowels and anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading and tamping concrete, brooming or brushing, hand application of curing compounds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold weather/rain protection and curing; Placement /anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and Keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260073 Heavy |
| Washoe | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, cleaning, oiling and moving to the next point of installation.; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood or metal) handling, cleaning and stripping of Loading and unloading, (Carrying and handling of all rods and material for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3); Waterproofing work; Epoxy rebar/dowels and anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading and tamping concrete, brooming or brushing, hand application of curing compounds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold weather/rain protection and curing; Placement /anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and Keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260093 Building |
| Washoe | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, cleaning, oiling and moving to the next point of installation.; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood or metal) handling, cleaning and stripping of Loading and unloading, (Carrying and handling of all rods and material for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3); Waterproofing work; Epoxy rebar/dowels and anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading and tamping concrete, brooming or brushing, hand application of curing compounds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold weather/rain protection and curing; Placement /anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and Keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260110 Highway |
| Washoe | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chainsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-Guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precast or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying asphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laborers' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tools and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary tools and equipment for underpinning foundation work) | $35.70 | $17.58 | $53.28 | NV20260073 Heavy |
| Washoe | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chainsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-Guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precast or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying asphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laborers' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tools and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary tools and equipment for underpinning foundation work) | $35.70 | $17.58 | $53.28 | NV20260093 Building |
| Washoe | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chainsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-Guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precast or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying asphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laborers' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tools and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary tools and equipment for underpinning foundation work) | $35.70 | $17.58 | $53.28 | NV20260110 Highway |
| Washoe | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hand trowels or hand floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsum; Concrete grinding machines (the terms do not include Rotomill machines for highway overlay grinding); Troweling machines; Floating machines; Finishing of epoxy or resin materials; Operation of skill saw; Laser Screed; Laser Level; Curb and Slipform machines; Stamps or other means or texturing; Any new devices which are beneficial to the construction of or with concrete or related products.) | $39.13 | $17.58 | $56.71 | NV20260073 Heavy |
| Washoe | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hand trowels or hand floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsum; Concrete grinding machines (the terms do not include Rotomill machines for highway overlay grinding); Troweling machines; Floating machines; Finishing of epoxy or resin materials; Operation of skill saw; Laser Screed; Laser Level; Curb and Slipform machines; Stamps or other means or texturing; Any new devices which are beneficial to the construction of or with concrete or related products.) | $39.13 | $17.58 | $56.71 | NV20260093 Building |
| Washoe | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hand trowels or hand floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsum; Concrete grinding machines (the terms do not include Rotomill machines for highway overlay grinding); Troweling machines; Floating machines; Finishing of epoxy or resin materials; Operation of skill saw; Laser Screed; Laser Level; Curb and Slipform machines; Stamps or other means or texturing; Any new devices which are beneficial to the construction of or with concrete or related products.) | $39.13 | $17.58 | $56.71 | NV20260110 Highway |
| Washoe | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model T\/\/M-2A, Gardner Denver Model DN143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb. 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, Mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for pipe work; Cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Equipment); TV Monitoring and Grouting of Utility Lines; Asphalt Rakers and Asphalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above and below ground, cathodic protection, bolt up, and support installation in connection to water conveyance) | $35.95 | $17.58 | $53.53 | NV20260073 Heavy |
| Washoe | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model T\/\/M-2A, Gardner Denver Model DN143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb. 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, Mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for pipe work; Cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Equipment); TV Monitoring and Grouting of Utility Lines; Asphalt Rakers and Asphalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above and below ground, cathodic protection, bolt up, and support installation in connection to water conveyance) | $35.95 | $17.58 | $53.53 | NV20260093 Building |
| Washoe | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model T\/\/M-2A, Gardner Denver Model DN143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb. 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, Mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for pipe work; Cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Equipment); TV Monitoring and Grouting of Utility Lines; Asphalt Rakers and Asphalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above and below ground, cathodic protection, bolt up, and support installation in connection to water conveyance) | $35.95 | $17.58 | $53.53 | NV20260110 Highway |
| Washoe | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all powder and explosives of any type, regardless of method used for such loading and placing; Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260073 Heavy |
| Washoe | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all powder and explosives of any type, regardless of method used for such loading and placing; Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260093 Building |
| Washoe | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all powder and explosives of any type, regardless of method used for such loading and placing; Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260110 Highway |
| Washoe | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking and Highway Striping work includes but is not limited to: All work by any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260073 Heavy |
| Washoe | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking and Highway Striping work includes but is not limited to: All work by any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260093 Building |
| Washoe | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking and Highway Striping work includes but is not limited to: All work by any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260110 Highway |
| Washoe | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260073 Heavy |
| Washoe | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260093 Building |
| Washoe | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260110 Highway |
| White Pine | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260067 Heavy |
| White Pine | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260089 Building |
| White Pine | Laborers: (Group 6) Gunmen, Materialmen | $35.25 | $17.58 | $52.83 | NV20260102 Highway |
| White Pine | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260067 Heavy |
| White Pine | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260089 Building |
| White Pine | Laborers: (Group 6) Nozzleman, Rodmen | $35.25 | $17.58 | $52.83 | NV20260102 Highway |
| White Pine | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260067 Heavy |
| White Pine | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260089 Building |
| White Pine | Laborers: (Group 6) Reboundmen | $35.60 | $17.58 | $53.18 | NV20260102 Highway |
| White Pine | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260067 Heavy |
| White Pine | Laborers: Furniture Mover | $31.79 | $17.58 | $49.37 | NV20260089 Building |
| White Pine | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260067 Heavy |
| White Pine | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260089 Building |
| White Pine | Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector) | $35.45 | $17.58 | $53.03 | NV20260102 Highway |
| White Pine | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260067 Heavy |
| White Pine | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260089 Building |
| White Pine | Laborers: Group 1-A (Flagger) | $33.58 | $17.58 | $51.16 | NV20260102 Highway |
| White Pine | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260067 Heavy |
| White Pine | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260089 Building |
| White Pine | Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components) | $35.55 | $17.58 | $53.13 | NV20260102 Highway |
| White Pine | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260067 Heavy |
| White Pine | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260089 Building |
| White Pine | Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.) | $35.70 | $17.58 | $53.28 | NV20260102 Highway |
| White Pine | Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260102 Highway |
| White Pine | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260067 Heavy |
| White Pine | Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level) | $39.13 | $17.58 | $56.71 | NV20260089 Building |
| White Pine | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260067 Heavy |
| White Pine | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260089 Building |
| White Pine | Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.) | $35.95 | $17.58 | $53.53 | NV20260102 Highway |
| White Pine | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260067 Heavy |
| White Pine | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260089 Building |
| White Pine | Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 | $53.83 | NV20260102 Highway |
| White Pine | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260089 Building |
| White Pine | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260067 Heavy |
| White Pine | Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 | $55.78 | NV20260102 Highway |
| White Pine | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260067 Heavy |
| White Pine | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260089 Building |
| White Pine | Laborers: Landscape | $30.29 | $17.58 | $47.87 | NV20260102 Highway |
Rates come from the current revision of each active determination; DOL revises these mid-year. Open a determination to watch it, or pin a bid date to lock the revision that legally applies. All Nevada trades.