Current rates (rev 2)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $58.48 | $27.62 | $86.10 |
| ELEVATOR MECHANIC. | $69.43 | $38.44 | $107.87 |
| POWER EQUIPMENT OPERATOR ((8) PAVER (ASPHALT, AGGREGATE, AND CONCRETE)) | $63.90 | $36.40 | $100.30 |
| POWER EQUIPMENT OPERATOR ((6) LOADER) | $63.79 | $36.40 | $100.19 |
| LABORER ((4) PIPELAYER) | $30.55 | $15.02 | $45.57 |
| LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $30.30 | $15.02 | $45.32 |
| TILE SETTER | $29.22 | $0.00 | $29.22 |
| ROOFER | $18.50 | $0.00 | $18.50 |
| PLUMBER | $18.94 | $0.00 | $18.94 |
| PAINTER: SPRAY | $19.18 | $0.00 | $19.18 |
| PAINTER (BRUSH AND ROLLER) | $18.76 | $0.00 | $18.76 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.11 | $0.00 | $24.11 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.16 | $0.00 | $20.16 |
| LABORER: COMMON OR GENERAL | $15.65 | $0.00 | $15.65 |
| IRONWORKER, STRUCTURAL | $22.09 | $0.00 | $22.09 |
| IRONWORKER, REINFORCING | $15.21 | $0.00 | $15.21 |
| HVAC MECHANIC (HVAC DUCT AND UNIT INSTALLATION ONLY) | $15.00 | $0.00 | $15.00 |
| GLAZIER | $22.61 | $0.00 | $22.61 |
| FLOOR LAYER: SOFT FLOORS | $28.26 | $12.11 | $40.37 |
| CEMENT MASON/CONCRETE FINISHER | $17.00 | $0.00 | $17.00 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND BATT INSULATION | $16.64 | $0.00 | $16.64 |