Residential construction wages: Washoe, Nevada
Wage determination NV20260044 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NV20260044 on · latest revision 2 · verify at sam.gov/wage-determination/NV20260044/2
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 2 | 2026-05-18 | diff vs rev 1 |
| rev 1 | 2026-05-17 | diff vs rev 0 |
| rev 0 | 2026-01-30 | original |
Current rates (rev 2)
The CSV and the printed sheet are snapshots of rev 2. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $29.40 | $11.16 | $40.56 |
| POWER EQUIPMENT OPERATOR ((8) PAVER (ASPHALT, AGGREGATE, AND CONCRETE)) | $63.90 | $36.40 | $100.30 |
| POWER EQUIPMENT OPERATOR ((6) LOADER) | $63.79 | $36.40 | $100.19 |
| LABORER ((4) PIPELAYER) | $34.45 | $16.30 | $50.75 |
| LABORER ((3) MASON TENDER-CEMENT/CONCRETE) | $34.20 | $16.30 | $50.50 |
| LABORER ((1) COMMON OR GENERAL) | $33.95 | $16.30 | $50.25 |
| PAINTER: BRUSH AND ROLLER | $39.43 | $15.71 | $55.14 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $47.51 | $29.38 | $76.89 |
| ROOFER | $18.50 | $0.00 | $18.50 |
| PLUMBER | $26.16 | $0.00 | $26.16 |
| PAINTER: SPRAY | $20.50 | $0.00 | $20.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.11 | $0.00 | $24.11 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.16 | $0.00 | $20.16 |
| IRONWORKER, REINFORCING | $19.78 | $0.00 | $19.78 |
| CEMENT MASON/CONCRETE FINISHER | $17.00 | $0.00 | $17.00 |
| CARPENTER | $17.82 | $0.00 | $17.82 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.