Saline County, Nebraska: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building NE20260081 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER (JOHNSON AND RICHARDSON COUNTIES) | $34.80 | $19.94 | $54.74 |
| BRICKLAYER (BUTLER, FILLMORE, GAGE, JEFFERSON, NEMAHA, POLK, SALINE AND THAYER COUNTIES) | $34.80 | $19.94 | $54.74 |
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 | $54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 | $54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 | $54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.00 | $18.88 | $53.88 |
| ELEVATOR MECHANIC | $55.88 | $38.44 | $94.32 |
| LABORER (MASON TENDER, BRICK & HOD) | $24.00 | $13.48 | $37.48 |
| PLUMBER: INCLUDES HVAC PIPE INSTALLATION (BUTLER, JOHNSON, NEMAHA, POLK AND RICHARDSON COUNTIES) | $44.26 | $16.90 | $61.16 |
| PIPEFITTER (DOES NOT INCLUDE HVAC PIPING) | $46.25 | $21.10 | $67.35 |
| PLUMBER: INCLUDES HVAC PIPE INSTALLATION (FILLMORE, GAGE, JEFFERSON, SALINE AND THAYER COUNTIES) | $46.25 | $21.10 | $67.35 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION (SALINE COUNTY) | $36.73 | $18.09 | $54.82 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION (BUTLER, FILLMORE, GAGE, JEFFERSON, JOHNSON, NEMAHA, POLK, RICHARDSON AND THAYER COUNTIES) | $39.65 | $19.87 | $59.52 |
| TRUCK DRIVER: DUMP, LOWBOY AND TANDEM | $14.56 | $1.68 | $16.24 |
| ROOFER | $14.52 | $0.65 | $15.17 |
| OPERATOR: LOADER | $16.58 | $0.94 | $17.52 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.82 | $2.22 | $24.04 |
| LABORER: COMMON OR GENERAL | $14.54 | $3.63 | $18.17 |
| IRONWORKER, STRUCTURAL | $22.96 | $4.50 | $27.46 |
| CEMENT MASON/CONCRETE FINISHER | $17.54 | $1.41 | $18.95 |
| CARPENTER, INCLUDES FORM WORK | $16.10 | $1.46 | $17.56 |
Heavy NE20260049 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 | $54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 | $54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 | $54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.00 | $18.88 | $53.88 |
| TRUCK DRIVER: DUMP TRUCK | $13.62 | $0.00 | $13.62 |
| OPERATOR: SCRAPER | $14.89 | $2.06 | $16.95 |
| OPERATOR: LOADER | $15.76 | $0.90 | $16.66 |
| OPERATOR: BULLDOZER | $15.95 | $3.04 | $18.99 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.47 | $4.07 | $23.54 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.54 | $2.15 | $20.69 |
| LABORER: PIPELAYER | $14.23 | $0.39 | $14.62 |
| LABORER: COMMON OR GENERAL | $12.98 | $2.33 | $15.31 |
| CEMENT MASON/CONCRETE FINISHER | $18.75 | $3.25 | $22.00 |
| CARPENTER | $22.02 | $2.68 | $24.70 |
Highway NE20260032 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $13.47 | $0.00 | $13.47 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $14.20 | $0.00 | $14.20 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $13.25 | $0.00 | $13.25 |
| TRUCK DRIVER: LOWBOY TRUCK | $11.97 | $0.00 | $11.97 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK (SALINE COUNTY) | $14.20 | $0.00 | $14.20 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK (BUTLER, FILLMORE, GAGE, JEFFERSON, JOHNSON, NEMAHA, OTOE, PAWNEE, POLK, RICHARSON, THAYER, & YORK COUNTIES) | $13.97 | $0.00 | $13.97 |
| OPERATING ENGINEERS: (SKID LOADER) | $12.74 | $0.00 | $12.74 |
| LABORER: TRAFFIC CONTROL - FLAGGER AND CONE/BARREL SETTER | $9.00 | $0.00 | $9.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.75 | $0.00 | $9.75 |
| LABORER: LANDSCAPE & IRRIGATION | $8.30 | $0.00 | $8.30 |
| LABORER: COMMON OR GENERAL, (SALINE COUNTY) | $12.12 | $0.00 | $12.12 |
| LABORER: COMMON OR GENERAL, (BUTLER, FILLMORE, GAGE, JEFFERSON, JOHNSON, NEMAHA, OTOE, PAWNEE, POLK, RICHARDSON, THAYER & YORK COUNTIES) | $11.76 | $0.00 | $11.76 |
| IRONWORKER, REINFORCING | $17.93 | $0.00 | $17.93 |
| FORM WORKER | $11.18 | $0.00 | $11.18 |
| ELECTRICIAN | $20.07 | $0.00 | $20.07 |
| CEMENT MASON/CONCRETE FINISHER | $16.37 | $0.00 | $16.37 |
| CARPENTER, EXCLUDES FORM WORK | $16.39 | $0.00 | $16.39 |
OPERATOR 16 classifications · $10.05 to $51.93 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: TRENCHER | $32.18 | $19.75 | $51.93 |
| OPERATOR: TRACTOR | $12.45 | $0.00 | $12.45 |
| OPERATOR: SCREED | $12.35 | $0.00 | $12.35 |
| OPERATOR: SCRAPER | $15.23 | $0.00 | $15.23 |
| OPERATOR: ROLLER | $13.02 | $0.00 | $13.02 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $17.90 | $0.00 | $17.90 |
| OPERATOR: MECHANIC | $14.64 | $0.00 | $14.64 |
| OPERATOR: LOADER | $16.63 | $0.00 | $16.63 |
| OPERATOR: GRADER/BLADE | $15.77 | $0.00 | $15.77 |
| OPERATOR: DISTRIBUTOR | $14.37 | $0.00 | $14.37 |
| OPERATOR: CRANE | $16.17 | $0.00 | $16.17 |
| OPERATOR: COMPACTOR | $10.05 | $0.00 | $10.05 |
| OPERATOR: BULLDOZER | $16.01 | $0.00 | $16.01 |
| OPERATOR: BROOM/SWEEPER | $11.41 | $0.00 | $11.41 |
| OPERATOR: BACKHOE LOADER COMBO | $13.58 | $0.00 | $13.58 |
| OPERATOR: ASPHALT PLANT | $14.09 | $0.00 | $14.09 |
Residential NE20260013 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.25 | $0.00 | $7.25 |
| SHEET METAL WORKER | $7.57 | $0.00 | $7.57 |
| ROOFER | $7.72 | $0.00 | $7.72 |
| PLUMBERS AND PIPEFITTERS | $8.66 | $0.82 | $9.48 |
| PAINTER | $7.25 | $0.00 | $7.25 |
| METAL BUILDING ERECTOR | $7.25 | $0.76 | $8.01 |
| LABORER | $7.25 | $0.00 | $7.25 |
| IRONWORKER | $8.00 | $0.00 | $8.00 |
| INSULATOR | $7.25 | $0.00 | $7.25 |
| ELECTRICIANS: (SEWARD COUNTY) | $8.00 | $0.00 | $8.00 |
| ELECTRICIANS: (SALINE COUNTY) | $12.25 | $2.55 | $14.80 |
| DRYWALL INSTALLER | $7.25 | $0.00 | $7.25 |
| DRYWALL FINISHER/TAPER | $7.25 | $0.00 | $7.25 |
| CEMENT MASON/CONCRETE FINISHER | $7.25 | $0.00 | $7.25 |
| CARPENTER | $8.08 | $0.00 | $8.08 |
| BRICKLAYER | $10.83 | $0.00 | $10.83 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.