Building construction wages: Fillmore + 9 more counties, Nebraska
Wage determination NE20260081 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NE20260081 on · latest revision 1 · verify at sam.gov/wage-determination/NE20260081/1
FillmoreJeffersonPolkSalineThayerButlerGageJohnsonNemahaRichardson
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER (JOHNSON AND RICHARDSON COUNTIES) | $34.80 | $19.94 | $54.74 |
| BRICKLAYER (BUTLER, FILLMORE, GAGE, JEFFERSON, NEMAHA, POLK, SALINE AND THAYER COUNTIES) | $34.80 | $19.94 | $54.74 |
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 | $54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 | $54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 | $54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.00 | $18.88 | $53.88 |
| ELEVATOR MECHANIC | $55.88 | $38.44 | $94.32 |
| LABORER (MASON TENDER, BRICK & HOD) | $24.00 | $13.48 | $37.48 |
| PLUMBER: INCLUDES HVAC PIPE INSTALLATION (BUTLER, JOHNSON, NEMAHA, POLK AND RICHARDSON COUNTIES) | $44.26 | $16.90 | $61.16 |
| PIPEFITTER (DOES NOT INCLUDE HVAC PIPING) | $46.25 | $21.10 | $67.35 |
| PLUMBER: INCLUDES HVAC PIPE INSTALLATION (FILLMORE, GAGE, JEFFERSON, SALINE AND THAYER COUNTIES) | $46.25 | $21.10 | $67.35 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION (SALINE COUNTY) | $36.73 | $18.09 | $54.82 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION (BUTLER, FILLMORE, GAGE, JEFFERSON, JOHNSON, NEMAHA, POLK, RICHARDSON AND THAYER COUNTIES) | $39.65 | $19.87 | $59.52 |
| TRUCK DRIVER: DUMP, LOWBOY AND TANDEM | $14.56 | $1.68 | $16.24 |
| ROOFER | $14.52 | $0.65 | $15.17 |
| OPERATOR: LOADER | $16.58 | $0.94 | $17.52 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.82 | $2.22 | $24.04 |
| LABORER: COMMON OR GENERAL | $14.54 | $3.63 | $18.17 |
| IRONWORKER, STRUCTURAL | $22.96 | $4.50 | $27.46 |
| CEMENT MASON/CONCRETE FINISHER | $17.54 | $1.41 | $18.95 |
| CARPENTER, INCLUDES FORM WORK | $16.10 | $1.46 | $17.56 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.