Building construction wages: Fillmore + 9 more counties, Nebraska
Wage determination NE20260081 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NE20260081 on · latest revision 1 · verify at sam.gov/wage-determination/NE20260081/1
FillmoreJeffersonPolkSalineThayerButlerGageJohnsonNemahaRichardson
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER (JOHNSON AND RICHARDSON COUNTIES) | $34.80 | $19.94 | $54.74 |
| BRICKLAYER (BUTLER, FILLMORE, GAGE, JEFFERSON, NEMAHA, POLK, SALINE AND THAYER COUNTIES) | $34.80 | $19.94 | $54.74 |
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 | $54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 | $54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 | $54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.00 | $18.88 | $53.88 |
| ELEVATOR MECHANIC | $55.88 | $38.44 | $94.32 |
| LABORER (MASON TENDER, BRICK & HOD) | $24.00 | $13.48 | $37.48 |
| PLUMBER: INCLUDES HVAC PIPE INSTALLATION (BUTLER, JOHNSON, NEMAHA, POLK AND RICHARDSON COUNTIES) | $44.26 | $16.90 | $61.16 |
| PIPEFITTER (DOES NOT INCLUDE HVAC PIPING) | $46.25 | $21.10 | $67.35 |
| PLUMBER: INCLUDES HVAC PIPE INSTALLATION (FILLMORE, GAGE, JEFFERSON, SALINE AND THAYER COUNTIES) | $46.25 | $21.10 | $67.35 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION (SALINE COUNTY) | $36.73 | $18.09 | $54.82 |
| SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION (BUTLER, FILLMORE, GAGE, JEFFERSON, JOHNSON, NEMAHA, POLK, RICHARDSON AND THAYER COUNTIES) | $39.65 | $19.87 | $59.52 |
| TRUCK DRIVER: DUMP, LOWBOY AND TANDEM | $14.56 | $1.68 | $16.24 |
| ROOFER | $14.52 | $0.65 | $15.17 |
| OPERATOR: LOADER | $16.58 | $0.94 | $17.52 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.82 | $2.22 | $24.04 |
| LABORER: COMMON OR GENERAL | $14.54 | $3.63 | $18.17 |
| IRONWORKER, STRUCTURAL | $22.96 | $4.50 | $27.46 |
| CEMENT MASON/CONCRETE FINISHER | $17.54 | $1.41 | $18.95 |
| CARPENTER, INCLUDES FORM WORK | $16.10 | $1.46 | $17.56 |