Building DC20260002 rev 3

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$40.77$20.17$60.94
ASBESTOS WORKER: HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$24.46$10.19$34.65
FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$30.21$10.43$40.64
BRICKLAYER$38.80$15.17$53.97
CARPENTER: INCLUDES DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYING-CARPET$34.41$14.33$48.74
MILLWRIGHT$39.50$17.32$56.82
PILEDRIVERMAN$36.60$14.47$51.07
ELECTRICIAN: INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS$59.50$23.06$82.56
ELECTRICAL INSTALLER (SOUND & COMMUNICATION SYSTEMS) SCOPE OF WORK: INCLUDES LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, VSAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). WORK EXCLUDED: THE INSTALLATION OF COMPUTER SYSTEMS IN INDUSTRIAL APPLICATIONS SUCH AS ASSEMBLY LINES, ROBOTICS AND COMPUTER CONTROLLER MANUFACTURING SYSTEMS. THE INSTALLATION OF CONDUIT AND/OR RACEWAYS SHALL BE INSTALLED BY INSIDE WIREMEN. ON SITES WHERE THERE IS NO INSIDE WIREMAN EMPLOYED, THE TELEDATA TECHNICIAN MAY INSTALL RACEWAY OR CONDUIT NOT GREATER THAN 10 FEET. FIRE ALARM WORK IS EXCLUDED ON ALL NEW CONSTRUCTION SITES OR WHEREVER THE FIRE ALARM SYSTEM IS INSTALLED IN CONDUIT. ALL HVAC CONTROL WORK$34.16$13.54$47.70
ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATIONS: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT$57.16$38.44$95.60
IRONWORKER: STRUCTURAL AND ORNAMENTAL$37.86$25.86$63.72
IRONWORKER, REINFORCING$31.88$23.78$55.66
LABORER: SKILLED$30.47$8.70$39.17
MARBLE/STONE MASON INCLUDING POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT EXCEPT POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT (RESTORATION WORK)$45.65$21.21$66.86
TERRAZZO WORKER/SETTER$34.34$14.20$48.54
TERRAZZO FINISHER$28.85$12.55$41.40
TILE SETTER$34.34$14.20$48.54
TILE FINISHER$28.85$12.55$41.40
GLAZIER: GLAZING CONTRACTS $2 MILLION AND UNDER$32.41$14.46$46.87
GLAZIER (GLAZING CONTRACTS OVER $2 MILLION)$36.65$14.46$51.11
PAINTER: BRUSH, ROLLER, SPRAY AND DRYWALL FINISHER$29.16$11.86$41.02
PLASTERER (INCLUDING FIREPROOFING)$32.86$10.46$43.32
CEMENT MASON/CONCRETE FINISHER$30.50$14.23$44.73
PLUMBER A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY$53.30$23.71$77.01
PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY$55.00$24.46$79.46
ROOFER$36.26$14.91$51.17
SPRINKLER FITTER (FIRE SPRINKLERS)$45.22$27.69$72.91
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY$53.42$23.20$76.62
POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT$18.88$0.00$18.88
LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT$11.67$0.00$11.67
LABORER: MASON TENDER - CEMENT/CONCRETE$15.40$2.85$18.25
LABORER: COMMON OR GENERAL$13.04$2.80$15.84

Heavy DC20260001 rev 4

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT AND FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.)$40.77$20.17$60.94
HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$24.46$10.19$34.65
FIRE STOP TECHNICIAN INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$30.21$10.43$40.64
BOILERMAKERS$47.37$25.60$72.97
BRICKLAYER$38.80$15.17$53.97
BRICKLAYER: REFRACTORY (FIREBRICK)$43.94$17.74$61.68
CARPENTER/LATHER$34.41$14.33$48.74
MILLWRIGHT$39.50$17.32$56.82
PILEDRIVERMAN$36.60$14.47$51.07
DIVER TENDER$36.60$14.47$51.07
DIVER$43.92$14.47$58.39
ELECTRICIANS$59.50$23.06$82.56
LINE CONSTRUCTION: TRUCK DRIVER$23.00$12.76$35.76
LINE CONSTRUCTION: LINEMEN$44.56$17.50$62.06
LINE CONSTRUCTION: GROUNDMEN$18.00$11.66$29.66
LINE CONSTRUCTION: EQUIPMENT OPERATORS$44.56$17.50$62.06
LINE CONSTRUCTION: CABLE SPLICERS$44.56$17.50$62.06
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 MASTER MECHANIC. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$47.18$13.27$60.45
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 FORK LIFTS, DITCH WITCH, BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS, ASSISTANT ENGINEERS, OILERS, SERVICE UNIT EQUIPMENT, ROLLER. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$28.39$13.27$41.66
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$31.09$13.27$44.36
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 FRONT END LOADERS, BOOM TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRADERS, MOTOR GRADERS, BULLDOZERS, TRENCHING MACHINES, BALLAST REGULATOR,HOE RAM, LOCOMOTIVE (STANDARD, NARROW GAUGE, TUGGERS). A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$36.31$13.27$49.58
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$40.73$13.27$54.00
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 TOWER CRANES AND CRANES 100 TON AND OVER. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$45.76$13.27$59.03
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2- 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$43.44$13.27$56.71
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 5 MECHANIC$37.93$10.97$48.90
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 4 AIR COMPRESSOR, GRADE ROLLERS$25.14$11.17$36.31
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 3 BROOM TRUCK, ASPHALT ROLLER$28.09$11.17$39.26
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 2 BOOM TRUCK, MILLING MACHINE, EXCAVATOR, RUBBER TIRE BACKHOE, ASPHALT PAVER, ASPHALT PLANT ENGINEER, MOTOR GRADER, TRACK LOADER, RUBBER TIRE LOADER, TRACK DOZER, CONCRETE PAVER$32.89$11.17$44.06
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 1 GRADALL OPERATOR, CRANE$37.07$11.17$48.24
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6$25.89$11.55$37.44
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5$31.16$11.55$42.71
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4$33.26$11.55$44.81
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3$33.80$11.55$45.35
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2$35.00$11.55$46.55
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1$41.40$11.55$52.95
IRONWORKER: STRUCTURAL AND ORNAMENTAL$37.86$25.86$63.72
IRONWORKER, REINFORCING$31.88$23.78$55.66
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8$37.95$8.70$46.65
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7$36.81$8.70$45.51
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6$35.93$8.70$44.63
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5$35.00$8.70$43.70
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4$34.32$8.70$43.02
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3$34.27$8.70$42.97
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2$34.27$8.70$42.97
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1$33.25$8.70$41.95
LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)$32.25$8.70$40.95
LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)$32.25$8.70$40.95
LABORERS GROUP 4$39.29$8.70$47.99
LABORERS GROUP 3$38.17$8.70$46.87
LABORERS GROUP 2$35.48$8.70$44.18
LABORERS GROUP 1$34.41$8.70$43.11
LABORERS$44.04$8.70$52.74
LABORERS$51.82$8.70$60.52
LABORERS:, ASPHALT SHOVELER (PAVING AND INCIDENTAL GRADING)$23.27$8.74$32.01
LABORERS: SAND SETTER & FORM SETTER (PAVING AND INCIDENTAL GRADING)$25.10$8.74$33.84
LABORERS: LABORER (PAVING AND INCIDENTAL GRADING)$23.06$8.74$31.80
LABORERS: JACK HAMMER (PAVING AND INCIDENTAL GRADING)$23.89$8.74$32.63
LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER (PAVING AND INCIDENTAL GRADING)$23.86$8.74$32.60
LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR (PAVING AND INCIDENTAL GRADING)$24.30$8.74$33.04
LABORERS: BRICK MASONRY WORK (SCAFFOLD BUILDERS, MORTARMEN)$24.96$8.70$33.66
LABORERS: BRICK MASONRY WORK (MASON TENDERS)$24.31$8.70$33.01
MARBLE & STONE MASON (INCLUDES POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT STRUCTURES)$45.65$21.21$66.86
MOSAIC & TERRAZZO WORKER, TILE LAYER$34.34$14.20$48.54
MARBLE, TILE & TERRAZZO FINISHER$28.85$12.55$41.40
PAINTERS: (COMMERCIAL AND MOLD REMEDIATION, PAINTERS, WALLCOVERS AND DRYWALL FINISHERS)$29.16$11.86$41.02
CEMENT MASONS: (HEAVY CONSTRUCTION ONLY)$30.50$14.23$44.73
CEMENT MASONS: FORM SETTERS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25
CEMENT MASONS: CONCRETE SAW OPERATORS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25
CEMENT MASONS: CEMENT MASONS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25
PLUMBERS A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY$53.30$23.71$77.01
STEAMFITTER, REFRIGERATION & AIR CONDITIONING MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY$55.00$24.46$79.46
SHEET METAL WORKER A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY$53.42$23.20$76.62
TRUCK DRIVERS:, HEAVY & HIGHWAY CONSTRUCTION: TRUCK DRIVERS A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE$31.75$7.30$39.05
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION: TRACTOR TRAILER, LOW BOY A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE$33.75$7.30$41.05
TRUCK DRIVERS: PAVING & INCIDENTAL GRADING: ALL PAVING PROJECTS WHERE THE GRADING IS INCIDENTAL TO THE PAVING A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE$31.75$7.30$39.05

Highway DC20260001 rev 4

ClassificationRateFringeTotal
ASBESTOS WORKER/HEAT AND FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.)$40.77$20.17$60.94
HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$24.46$10.19$34.65
FIRE STOP TECHNICIAN INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$30.21$10.43$40.64
BOILERMAKERS$47.37$25.60$72.97
BRICKLAYER$38.80$15.17$53.97
BRICKLAYER: REFRACTORY (FIREBRICK)$43.94$17.74$61.68
CARPENTER/LATHER$34.41$14.33$48.74
MILLWRIGHT$39.50$17.32$56.82
PILEDRIVERMAN$36.60$14.47$51.07
DIVER TENDER$36.60$14.47$51.07
DIVER$43.92$14.47$58.39
ELECTRICIANS$59.50$23.06$82.56
LINE CONSTRUCTION: TRUCK DRIVER$23.00$12.76$35.76
LINE CONSTRUCTION: LINEMEN$44.56$17.50$62.06
LINE CONSTRUCTION: GROUNDMEN$18.00$11.66$29.66
LINE CONSTRUCTION: EQUIPMENT OPERATORS$44.56$17.50$62.06
LINE CONSTRUCTION: CABLE SPLICERS$44.56$17.50$62.06
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 MASTER MECHANIC. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$47.18$13.27$60.45
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 FORK LIFTS, DITCH WITCH, BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS, ASSISTANT ENGINEERS, OILERS, SERVICE UNIT EQUIPMENT, ROLLER. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$28.39$13.27$41.66
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$31.09$13.27$44.36
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 FRONT END LOADERS, BOOM TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRADERS, MOTOR GRADERS, BULLDOZERS, TRENCHING MACHINES, BALLAST REGULATOR,HOE RAM, LOCOMOTIVE (STANDARD, NARROW GAUGE, TUGGERS). A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$36.31$13.27$49.58
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$40.73$13.27$54.00
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 TOWER CRANES AND CRANES 100 TON AND OVER. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$45.76$13.27$59.03
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2- 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$43.44$13.27$56.71
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 5 MECHANIC$37.93$10.97$48.90
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 4 AIR COMPRESSOR, GRADE ROLLERS$25.14$11.17$36.31
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 3 BROOM TRUCK, ASPHALT ROLLER$28.09$11.17$39.26
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 2 BOOM TRUCK, MILLING MACHINE, EXCAVATOR, RUBBER TIRE BACKHOE, ASPHALT PAVER, ASPHALT PLANT ENGINEER, MOTOR GRADER, TRACK LOADER, RUBBER TIRE LOADER, TRACK DOZER, CONCRETE PAVER$32.89$11.17$44.06
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 1 GRADALL OPERATOR, CRANE$37.07$11.17$48.24
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6$25.89$11.55$37.44
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5$31.16$11.55$42.71
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4$33.26$11.55$44.81
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3$33.80$11.55$45.35
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2$35.00$11.55$46.55
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1$41.40$11.55$52.95
IRONWORKER: STRUCTURAL AND ORNAMENTAL$37.86$25.86$63.72
IRONWORKER, REINFORCING$31.88$23.78$55.66
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8$37.95$8.70$46.65
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7$36.81$8.70$45.51
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6$35.93$8.70$44.63
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5$35.00$8.70$43.70
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4$34.32$8.70$43.02
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3$34.27$8.70$42.97
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2$34.27$8.70$42.97
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1$33.25$8.70$41.95
LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)$32.25$8.70$40.95
LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)$32.25$8.70$40.95
LABORERS GROUP 4$39.29$8.70$47.99
LABORERS GROUP 3$38.17$8.70$46.87
LABORERS GROUP 2$35.48$8.70$44.18
LABORERS GROUP 1$34.41$8.70$43.11
LABORERS$44.04$8.70$52.74
LABORERS$51.82$8.70$60.52
LABORERS:, ASPHALT SHOVELER (PAVING AND INCIDENTAL GRADING)$23.27$8.74$32.01
LABORERS: SAND SETTER & FORM SETTER (PAVING AND INCIDENTAL GRADING)$25.10$8.74$33.84
LABORERS: LABORER (PAVING AND INCIDENTAL GRADING)$23.06$8.74$31.80
LABORERS: JACK HAMMER (PAVING AND INCIDENTAL GRADING)$23.89$8.74$32.63
LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER (PAVING AND INCIDENTAL GRADING)$23.86$8.74$32.60
LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR (PAVING AND INCIDENTAL GRADING)$24.30$8.74$33.04
LABORERS: BRICK MASONRY WORK (SCAFFOLD BUILDERS, MORTARMEN)$24.96$8.70$33.66
LABORERS: BRICK MASONRY WORK (MASON TENDERS)$24.31$8.70$33.01
MARBLE & STONE MASON (INCLUDES POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT STRUCTURES)$45.65$21.21$66.86
MOSAIC & TERRAZZO WORKER, TILE LAYER$34.34$14.20$48.54
MARBLE, TILE & TERRAZZO FINISHER$28.85$12.55$41.40
PAINTERS: (COMMERCIAL AND MOLD REMEDIATION, PAINTERS, WALLCOVERS AND DRYWALL FINISHERS)$29.16$11.86$41.02
CEMENT MASONS: (HEAVY CONSTRUCTION ONLY)$30.50$14.23$44.73
CEMENT MASONS: FORM SETTERS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25
CEMENT MASONS: CONCRETE SAW OPERATORS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25
CEMENT MASONS: CEMENT MASONS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25
PLUMBERS A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY$53.30$23.71$77.01
STEAMFITTER, REFRIGERATION & AIR CONDITIONING MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY$55.00$24.46$79.46
SHEET METAL WORKER A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY$53.42$23.20$76.62
TRUCK DRIVERS:, HEAVY & HIGHWAY CONSTRUCTION: TRUCK DRIVERS A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE$31.75$7.30$39.05
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION: TRACTOR TRAILER, LOW BOY A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE$33.75$7.30$41.05
TRUCK DRIVERS: PAVING & INCIDENTAL GRADING: ALL PAVING PROJECTS WHERE THE GRADING IS INCIDENTAL TO THE PAVING A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE$31.75$7.30$39.05

Residential DC20260003 rev 1

ClassificationRateFringeTotal
ASBESTOS WORKER: HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$24.46$10.19$34.65
ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATIONS: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT$57.16$38.44$95.60
PLUMBER A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY$29.60$14.71$44.31
PIPEFITTER (HVAC PIPE INSTALLATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY$55.00$24.46$79.46
SHEET METAL WORKER$18.33$0.00$18.33
ROOFER$26.33$0.00$26.33
POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT$18.33$0.00$18.33
PAINTER: BRUSH AND ROLLER$15.32$5.15$20.47
LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT$12.59$0.00$12.59
LABORER: COMMON OR GENERAL$12.54$0.00$12.54
ELECTRICIAN$19.93$3.11$23.04
DRYWALL FINISHER/TAPER$15.00$0.00$15.00
CEMENT MASON/CONCRETE FINISHER$18.72$0.00$18.72
CARPENTER, INCLUDING DRYWALL HANGING$17.43$2.37$19.80
BRICKLAYER$20.71$0.00$20.71