Heavy, Highway construction wages: Washington, D.C., District of Columbia

Wage determination DC20260001 · Active · Standard

Washington, D.C.

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 42026-05-18diff vs rev 3
rev 32026-05-17diff vs rev 2
rev 22026-01-23diff vs rev 1
rev 12026-01-16diff vs rev 0
rev 02026-01-09original

Current rates (rev 4) · download CSV · print this page for your bid file

ClassificationRateFringeTotal
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 2 BOOM TRUCK, MILLING MACHINE, EXCAVATOR, RUBBER TIRE BACKHOE, ASPHALT PAVER, ASPHALT PLANT ENGINEER, MOTOR GRADER, TRACK LOADER, RUBBER TIRE LOADER, TRACK DOZER, CONCRETE PAVER$32.89$11.17$44.06
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 1 GRADALL OPERATOR, CRANE$37.07$11.17$48.24
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6$25.89$11.55$37.44
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5$31.16$11.55$42.71
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4$33.26$11.55$44.81
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3$33.80$11.55$45.35
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2$35.00$11.55$46.55
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1$41.40$11.55$52.95
IRONWORKER: STRUCTURAL AND ORNAMENTAL$37.86$25.86$63.72
IRONWORKER, REINFORCING$31.88$23.78$55.66
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8$37.95$8.70$46.65
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7$36.81$8.70$45.51
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6$35.93$8.70$44.63
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5$35.00$8.70$43.70
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4$34.32$8.70$43.02
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3$34.27$8.70$42.97
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2$34.27$8.70$42.97
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1$33.25$8.70$41.95
LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)$32.25$8.70$40.95
LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)$32.25$8.70$40.95
LABORERS GROUP 4$39.29$8.70$47.99
LABORERS GROUP 3$38.17$8.70$46.87
LABORERS GROUP 2$35.48$8.70$44.18
LABORERS GROUP 1$34.41$8.70$43.11
LABORERS$44.04$8.70$52.74
LABORERS$51.82$8.70$60.52
LABORERS:, ASPHALT SHOVELER (PAVING AND INCIDENTAL GRADING)$23.27$8.74$32.01
LABORERS: SAND SETTER & FORM SETTER (PAVING AND INCIDENTAL GRADING)$25.10$8.74$33.84
LABORERS: LABORER (PAVING AND INCIDENTAL GRADING)$23.06$8.74$31.80
LABORERS: JACK HAMMER (PAVING AND INCIDENTAL GRADING)$23.89$8.74$32.63
LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER (PAVING AND INCIDENTAL GRADING)$23.86$8.74$32.60
LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR (PAVING AND INCIDENTAL GRADING)$24.30$8.74$33.04
LABORERS: BRICK MASONRY WORK (SCAFFOLD BUILDERS, MORTARMEN)$24.96$8.70$33.66
LABORERS: BRICK MASONRY WORK (MASON TENDERS)$24.31$8.70$33.01
MARBLE & STONE MASON (INCLUDES POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT STRUCTURES)$45.65$21.21$66.86
MOSAIC & TERRAZZO WORKER, TILE LAYER$34.34$14.20$48.54
MARBLE, TILE & TERRAZZO FINISHER$28.85$12.55$41.40
PAINTERS: (COMMERCIAL AND MOLD REMEDIATION, PAINTERS, WALLCOVERS AND DRYWALL FINISHERS)$29.16$11.86$41.02
CEMENT MASONS: (HEAVY CONSTRUCTION ONLY)$30.50$14.23$44.73
CEMENT MASONS: FORM SETTERS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25
CEMENT MASONS: CONCRETE SAW OPERATORS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25
CEMENT MASONS: CEMENT MASONS (PAVING & INCIDENTAL GRADING)$23.50$9.75$33.25
PLUMBERS A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY$53.30$23.71$77.01
STEAMFITTER, REFRIGERATION & AIR CONDITIONING MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY$55.00$24.46$79.46
SHEET METAL WORKER A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY$53.42$23.20$76.62
TRUCK DRIVERS:, HEAVY & HIGHWAY CONSTRUCTION: TRUCK DRIVERS A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE$31.75$7.30$39.05
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION: TRACTOR TRAILER, LOW BOY A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE$33.75$7.30$41.05
TRUCK DRIVERS: PAVING & INCIDENTAL GRADING: ALL PAVING PROJECTS WHERE THE GRADING IS INCIDENTAL TO THE PAVING A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE$31.75$7.30$39.05
ASBESTOS WORKER/HEAT AND FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.)$40.77$20.17$60.94
HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$24.46$10.19$34.65
FIRE STOP TECHNICIAN INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY$30.21$10.43$40.64
BOILERMAKERS$47.37$25.60$72.97
BRICKLAYER$38.80$15.17$53.97
BRICKLAYER: REFRACTORY (FIREBRICK)$43.94$17.74$61.68
CARPENTER/LATHER$34.41$14.33$48.74
MILLWRIGHT$39.50$17.32$56.82
PILEDRIVERMAN$36.60$14.47$51.07
DIVER TENDER$36.60$14.47$51.07
DIVER$43.92$14.47$58.39
ELECTRICIANS$59.50$23.06$82.56
LINE CONSTRUCTION: TRUCK DRIVER$23.00$12.76$35.76
LINE CONSTRUCTION: LINEMEN$44.56$17.50$62.06
LINE CONSTRUCTION: GROUNDMEN$18.00$11.66$29.66
LINE CONSTRUCTION: EQUIPMENT OPERATORS$44.56$17.50$62.06
LINE CONSTRUCTION: CABLE SPLICERS$44.56$17.50$62.06
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7 MASTER MECHANIC. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$47.18$13.27$60.45
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6 FORK LIFTS, DITCH WITCH, BOBCAT, SKID STEER, SPACE HEATERS, SWEEPERS, ASSISTANT ENGINEERS, OILERS, SERVICE UNIT EQUIPMENT, ROLLER. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$28.39$13.27$41.66
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$31.09$13.27$44.36
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 FRONT END LOADERS, BOOM TRUCKS, BACKHOES, EXCAVATORS, GRADALLS, POWER DRIVEN WHEEL SCOOPS & SCRAPERS, BLADE GRADERS, MOTOR GRADERS, BULLDOZERS, TRENCHING MACHINES, BALLAST REGULATOR,HOE RAM, LOCOMOTIVE (STANDARD, NARROW GAUGE, TUGGERS). A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$36.31$13.27$49.58
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$40.73$13.27$54.00
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 TOWER CRANES AND CRANES 100 TON AND OVER. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$45.76$13.27$59.03
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2- 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY$43.44$13.27$56.71
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 5 MECHANIC$37.93$10.97$48.90
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 4 AIR COMPRESSOR, GRADE ROLLERS$25.14$11.17$36.31
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 3 BROOM TRUCK, ASPHALT ROLLER$28.09$11.17$39.26