Residential construction wages: Washington, D.C., District of Columbia
Wage determination DC20260003 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/DC20260003 on · latest revision 1 · verify at sam.gov/wage-determination/DC20260003/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER: HAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $24.46 | $10.19 | $34.65 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATIONS: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $57.16 | $38.44 | $95.60 |
| PLUMBER A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY | $29.60 | $14.71 | $44.31 |
| PIPEFITTER (HVAC PIPE INSTALLATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY | $55.00 | $24.46 | $79.46 |
| SHEET METAL WORKER | $18.33 | $0.00 | $18.33 |
| ROOFER | $26.33 | $0.00 | $26.33 |
| POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT | $18.33 | $0.00 | $18.33 |
| PAINTER: BRUSH AND ROLLER | $15.32 | $5.15 | $20.47 |
| LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT | $12.59 | $0.00 | $12.59 |
| LABORER: COMMON OR GENERAL | $12.54 | $0.00 | $12.54 |
| ELECTRICIAN | $19.93 | $3.11 | $23.04 |
| DRYWALL FINISHER/TAPER | $15.00 | $0.00 | $15.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.72 | $0.00 | $18.72 |
| CARPENTER, INCLUDING DRYWALL HANGING | $17.43 | $2.37 | $19.80 |
| BRICKLAYER | $20.71 | $0.00 | $20.71 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.