Russell County, Alabama: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Bidding a job in Russell County? Pin your bid date to lock the revision that legally applies under the FAR ten-day rule, and get an email if anything moves before or after opening.
| Classification | Rate | Fringe | Total |
|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.10 | $16.40 | $47.50 |
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| POWER EQUIPMENT OPERATOR: CRANE | $31.75 | $14.55 | $46.30 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 |
| PIPEFITTER | $32.30 | $17.96 | $50.26 |
| PLUMBER | $35.20 | $13.51 | $48.71 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK) | $30.50 | $20.49 | $50.99 |
| TRUCK DRIVER: DUMP TRUCK | $12.50 | $0.00 | $12.50 |
| TILE SETTER | $15.86 | $0.00 | $15.86 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $24.65 | $11.42 | $36.07 |
| ROOFER | $13.47 | $0.00 | $13.47 |
| PAINTER: SPRAY | $14.31 | $0.00 | $14.31 |
| PAINTER (BRUSH AND ROLLER) | $15.41 | $0.00 | $15.41 |
| LABORER: PIPELAYER | $12.58 | $0.00 | $12.58 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.42 | $0.00 | $11.42 |
| LABORER: MASON TENDER - BRICK | $11.00 | $0.00 | $11.00 |
| LABORER: COMMON OR GENERAL | $10.00 | $0.00 | $10.00 |
| IRONWORKER, REINFORCING | $22.86 | $7.94 | $30.80 |
| GLAZIER | $17.71 | $0.00 | $17.71 |
| ELECTRICIAN | $18.34 | $2.61 | $20.95 |
| CEMENT MASON/CONCRETE FINISHER | $15.48 | $0.00 | $15.48 |
| CARPENTER | $15.17 | $0.00 | $15.17 |
| BRICKLAYER | $19.81 | $0.00 | $19.81 |
OPERATOR 6 classifications · $13.65 to $20.69 total
| Classification | Rate | Fringe | Total |
|---|
| OPERATOR: ROLLER | $14.00 | $1.78 | $15.78 |
| OPERATOR: LOADER | $14.69 | $0.00 | $14.69 |
| OPERATOR: GRADER/BLADE | $17.52 | $0.89 | $18.41 |
| OPERATOR: FORKLIFT | $20.69 | $0.00 | $20.69 |
| OPERATOR: BULLDOZER | $16.37 | $0.00 | $16.37 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.65 | $0.00 | $13.65 |
| Classification | Rate | Fringe | Total |
|---|
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $12.56 | $2.12 | $14.68 |
| OPERATOR: LOADER, INCLUDES WATER SEWER LINES | $17.64 | $2.14 | $19.78 |
| OPERATOR: BULLDOZER, INCLUDES WATER AND SEWER LINES | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | $13.90 | $0.00 | $13.90 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $11.95 | $0.00 | $11.95 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $9.68 | $0.00 | $9.68 |
| ELECTRICIAN | $19.56 | $0.00 | $19.56 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $13.78 | $0.00 | $13.78 |
| CARPENTER, INCLUDES FORM WORK | $18.72 | $7.91 | $26.63 |
| Classification | Rate | Fringe | Total |
|---|
| ELECTRICIAN | $30.90 | $10.34 | $41.24 |
| TRUCK DRIVER: WATER TRUCK | $13.50 | $0.00 | $13.50 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $15.56 | $0.00 | $15.56 |
| TRUCK DRIVER: LOWBOY TRUCK | $16.79 | $0.00 | $16.79 |
| TRUCK DRIVER: FLATBED TRUCK | $15.00 | $0.00 | $15.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.51 | $0.00 | $15.51 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $13.45 | $0.00 | $13.45 |
| TRAFFIC CONTROL: FLAGGER | $12.27 | $0.00 | $12.27 |
| PAINTER (BRUSH AND ROLLER) | $15.97 | $1.27 | $17.24 |
| LABORER: PIPELAYER | $14.13 | $0.00 | $14.13 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.38 | $0.00 | $13.38 |
| LABORER: COMMON OR GENERAL | $11.78 | $0.00 | $11.78 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $14.22 | $0.00 | $14.22 |
| LABORER GRADE CHECKER | $14.08 | $0.00 | $14.08 |
| IRONWORKER, STRUCTURAL | $22.40 | $0.00 | $22.40 |
| IRONWORKER, REINFORCING | $16.20 | $0.00 | $16.20 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK) | $14.55 | $0.00 | $14.55 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | $19.82 | $0.00 | $19.82 |
| FORM WORKER | $14.87 | $0.00 | $14.87 |
| CEMENT MASON/CONCRETE FINISHER | $14.09 | $0.00 | $14.09 |
OPERATOR 16 classifications · $13.30 to $37.98 total
| Classification | Rate | Fringe | Total |
|---|
| OPERATOR: SCRAPER | $13.30 | $0.00 | $13.30 |
| OPERATOR: ROLLER | $14.29 | $0.00 | $14.29 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $15.54 | $0.00 | $15.54 |
| OPERATOR: OILER | $16.83 | $0.00 | $16.83 |
| OPERATOR: MILLING MACHINE | $15.79 | $0.00 | $15.79 |
| OPERATOR: MECHANIC | $19.16 | $0.00 | $19.16 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $16.60 | $0.00 | $16.60 |
| OPERATOR: LOADER | $15.55 | $0.00 | $15.55 |
| OPERATOR: GRADER/BLADE | $17.98 | $0.00 | $17.98 |
| OPERATOR: DRILL | $26.73 | $11.25 | $37.98 |
| OPERATOR: CRANE | $22.88 | $0.00 | $22.88 |
| OPERATOR: BULLDOZER | $15.28 | $0.00 | $15.28 |
| OPERATOR: BROOM/SWEEPER | $13.38 | $0.00 | $13.38 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.88 | $0.00 | $13.88 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $15.26 | $0.00 | $15.26 |
| OPERATOR: ASPHALT SPREADER | $16.00 | $0.00 | $16.00 |
| Classification | Rate | Fringe | Total |
|---|
| TRUCK DRIVER | $10.06 | $0.00 | $10.06 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $10.39 | $0.00 | $10.39 |
| ROOFER, INCLUDES BUILT UP, METAL, SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $11.29 | $0.00 | $11.29 |
| PLUMBER | $10.95 | $0.00 | $10.95 |
| PAINTER | $8.96 | $0.00 | $8.96 |
| OPERATOR: LOADER (FRONT END) | $10.40 | $0.00 | $10.40 |
| OPERATOR: BULLDOZER | $12.60 | $0.00 | $12.60 |
| OPERATOR: BACKHOE | $11.45 | $0.00 | $11.45 |
| LABORER: PIPELAYER | $8.83 | $0.00 | $8.83 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $7.88 | $0.00 | $7.88 |
| LABORER: LANDSCAPE | $7.25 | $0.00 | $7.25 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 |
| IRONWORKER, STRUCTURAL | $8.00 | $0.00 | $8.00 |
| IRONWORKER, ORNAMENTAL | $10.75 | $0.00 | $10.75 |
| ELECTRICIAN | $10.75 | $0.00 | $10.75 |
| CEMENT MASON/CONCRETE FINISHER | $18.00 | $0.00 | $18.00 |
| CARPENTER, INCLUDES FORM WORK | $10.40 | $0.00 | $10.40 |
| BRICKLAYER | $13.00 | $0.00 | $13.00 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.
Recent rate changes here
All recent changes across covered states