Building construction wages: Russell, Alabama
Wage determination AL20260095 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AL20260095 on · latest revision 1 · verify at sam.gov/wage-determination/AL20260095/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.10 | $16.40 | $47.50 |
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
| POWER EQUIPMENT OPERATOR: CRANE | $31.75 | $14.55 | $46.30 |
| IRONWORKER, STRUCTURAL | $32.00 | $15.05 | $47.05 |
| PIPEFITTER | $32.30 | $17.96 | $50.26 |
| PLUMBER | $35.20 | $13.51 | $48.71 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK) | $30.50 | $20.49 | $50.99 |
| TRUCK DRIVER: DUMP TRUCK | $12.50 | $0.00 | $12.50 |
| TILE SETTER | $15.86 | $0.00 | $15.86 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $24.65 | $11.42 | $36.07 |
| ROOFER | $13.47 | $0.00 | $13.47 |
| PAINTER: SPRAY | $14.31 | $0.00 | $14.31 |
| PAINTER (BRUSH AND ROLLER) | $15.41 | $0.00 | $15.41 |
| OPERATOR: ROLLER | $14.00 | $1.78 | $15.78 |
| OPERATOR: LOADER | $14.69 | $0.00 | $14.69 |
| OPERATOR: GRADER/BLADE | $17.52 | $0.89 | $18.41 |
| OPERATOR: FORKLIFT | $20.69 | $0.00 | $20.69 |
| OPERATOR: BULLDOZER | $16.37 | $0.00 | $16.37 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.65 | $0.00 | $13.65 |
| LABORER: PIPELAYER | $12.58 | $0.00 | $12.58 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $11.42 | $0.00 | $11.42 |
| LABORER: MASON TENDER - BRICK | $11.00 | $0.00 | $11.00 |
| LABORER: COMMON OR GENERAL | $10.00 | $0.00 | $10.00 |
| IRONWORKER, REINFORCING | $22.86 | $7.94 | $30.80 |
| GLAZIER | $17.71 | $0.00 | $17.71 |
| ELECTRICIAN | $18.34 | $2.61 | $20.95 |
| CEMENT MASON/CONCRETE FINISHER | $15.48 | $0.00 | $15.48 |
| CARPENTER | $15.17 | $0.00 | $15.17 |
| BRICKLAYER | $19.81 | $0.00 | $19.81 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.