Heavy construction wages: Russell, Alabama

Wage determination AL20260112 · Active · Standard · verify on SAM.gov

Russell

Get an email when this determination changes.
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV
ClassificationRateFringeTotal
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES$12.56$2.12$14.68
OPERATOR: LOADER, INCLUDES WATER SEWER LINES$17.64$2.14$19.78
OPERATOR: BULLDOZER, INCLUDES WATER AND SEWER LINES$12.00$0.00$12.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES$13.90$0.00$13.90
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES$11.95$0.00$11.95
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES$9.68$0.00$9.68
ELECTRICIAN$19.56$0.00$19.56
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES$13.78$0.00$13.78
CARPENTER, INCLUDES FORM WORK$18.72$7.91$26.63