Heavy construction wages: Russell, Alabama
Wage determination AL20260112 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/AL20260112 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/AL20260112/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | $12.56 | $2.12 | $14.68 |
| OPERATOR: LOADER, INCLUDES WATER SEWER LINES | $17.64 | $2.14 | $19.78 |
| OPERATOR: BULLDOZER, INCLUDES WATER AND SEWER LINES | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | $13.90 | $0.00 | $13.90 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | $11.95 | $0.00 | $11.95 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | $9.68 | $0.00 | $9.68 |
| ELECTRICIAN | $19.56 | $0.00 | $19.56 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | $13.78 | $0.00 | $13.78 |
| CARPENTER, INCLUDES FORM WORK | $18.72 | $7.91 | $26.63 |