WA20260135: rev 0 → rev 1

2 rate changes, 6 added, 6 removed.

Rate changes

Rates below include fringe (the full hourly package). Enter your remaining crew hours per classification to price this change for a job.

ClassificationOld totalNew totalΔ/hrHours on jobCost impact
LINE CONSTRUCTION: LINE PERSON$65.67$88.71+23.04
LINE CONSTRUCTION: EQUIPMENT OPERATOR$56.69$76.13+19.44

Added classifications

OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN$40.69$22.45
Heavy Equipment Operator: Screed (East of the 120th Meridian)$40.69$22.45
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (East of the 120th Meridian)$40.69$22.45
OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN$60.67$27.57
Heavy Equipment Operator: Screed (West of the 120th Meridian)$60.67$27.57
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (West of the 120th Meridian)$60.67$27.57

Removed classifications

WEST OF THE 120TH MERIDIAN - (East of the 120th Meridian) Operator: Loader Overhead 4 yards including 8 yardswas $40.69
WEST OF THE 120TH MERIDIAN - Operator: Paver (Asphalt, Aggregate, and Concrete)was $40.69
WEST OF THE 120TH MERIDIAN - Operator: Screedwas $40.69
WEST OF THE 120TH MERIDIAN - (West of the 120th Meridian) Operator: Loader Overhead 6 yards but not including 8 yardswas $60.67
WEST OF THE 120TH MERIDIAN - Operator: Paver (Asphalt, Aggregate, and Concrete)was $60.67
WEST OF THE 120TH MERIDIAN - Operator: Screedwas $60.67