Heavy construction wages: Yakima, Washington

Wage determination WA20260135 · Active · Standard · verify on SAM.gov

Yakima

Get an email when this determination changes.This determination changed once in the last 12 months, most recently 2026-05-18: 2 rate changes, 6 added, 6 removed (LINE CONSTRUCTION: LINE PERSON $64.17 → $64.17).
Substantive rate changes only; no spam. Bidding a specific job? Pin a project instead to lock the revision that applied on your bid date.

Revision history

RevisionPublishedCompare
rev 12026-05-18diff vs rev 0
rev 02026-05-17original

Current rates (rev 1)

Download CSV

The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.

ClassificationRateFringeTotal
LINE CONSTRUCTION: LINE PERSON$64.17$24.54$88.71
TREE TRIMMER: GROUND PERSON$22.60$16.37$38.97
TREE TRIMMER$42.57$17.97$60.54
LINE CONSTRUCTION: EQUIPMENT OPERATOR$55.19$20.94$76.13
ELECTRICIAN$60.00$27.78$87.78
OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL OPERATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.23$27.57$86.80
OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL LOCATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.88$27.57$87.45
OPERATOR: DRILL: DRILLING MACHINE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$60.67$27.57$88.24
OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.23$27.57$86.80
OPERATOR: ROLLER WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN$38.91$22.45$61.36
OPERATOR: LOADER OVERHEAD UNDER 4 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN$40.18$22.45$62.63
OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN$40.69$22.45$63.14
Heavy Equipment Operator: Screed (East of the 120th Meridian)$40.69$22.45$63.14
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (East of the 120th Meridian)$40.69$22.45$63.14
Heavy Equipment Operator: Mechanic (East of the 120th Meridian)$38.96$22.45$61.41
OPERATOR: ROLLER PLANT MIX OR MULTI-LIFT MATERIALS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN$59.23$27.57$86.80
OPERATOR: ROLLER OTHER THAN PLANT MIX WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN$55.43$27.57$83.00
OPERATOR: LOADER OVERHEAD UNDER 6 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN$59.88$27.57$87.45
OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN$60.67$27.57$88.24
Heavy Equipment Operator: Screed (West of the 120th Meridian)$60.67$27.57$88.24
Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (West of the 120th Meridian)$60.67$27.57$88.24
Heavy Equipment Operator: Mechanic (West of the 120th Meridian)$61.56$27.57$89.13
OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.88$27.57$87.45
OPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.23$27.57$86.80
OPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.88$27.57$87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.88$27.57$87.45
OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$60.67$27.57$88.24
OPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.23$27.57$86.80
LABORER: NOZZLE PERSON$52.31$17.01$69.32
LABORER: PIPELAYER$37.80$16.90$54.70
PAINTER$41.24$14.70$55.94
TRUCK DRIVER: WATER TRUCK$31.62$16.84$48.46
TRUCK DRIVER: DUMP TRUCK$34.94$15.63$50.57
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$30.61$10.89$41.50
TRAFFIC CONTROL: FLAGGER$27.75$11.15$38.90
OPERATOR: GRADER/BLADE$40.28$16.17$56.45
OPERATOR: FORKLIFT$45.93$19.20$65.13
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.60$0.00$43.60
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$48.70$0.00$48.70
LABORER: FENCE ERECTOR$30.21$0.00$30.21
LABORER: MASON TENDER - CEMENT/CONCRETE$38.46$0.00$38.46
LABORER: HOD CARRIER$35.06$10.94$46.00
LABORER: CONCRETE SAW CHAIN$37.30$4.30$41.60
LABORER: COMMON OR GENERAL$34.41$0.00$34.41
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$37.63$11.25$48.88
IRONWORKER$43.29$25.63$68.92
GRADE CHECKER$37.54$0.00$37.54
FORM WORKER$37.16$14.74$51.90
CEMENT MASON/CONCRETE FINISHER$39.33$0.00$39.33
CARPENTER, EXCLUDES FORM WORK$29.72$0.00$29.72
TRUCK DRIVER: ASPHALT MIX$55.43$27.52$82.95
OPERATOR: CRANE$54.11$18.14$72.25

Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.