Highway construction wages: Chesterfield, Colonial Heights*, Virginia
Wage determination VA20260111 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/VA20260111 on · latest revision 1 · verify at sam.gov/wage-determination/VA20260111/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 | $50.98 |
| TRUCK DRIVER: SINGLE & MULTI AXLE | $19.23 | $0.00 | $19.23 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $16.98 | $0.00 | $16.98 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 | $18.25 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.53 | $0.00 | $15.53 |
| TRAFFIC CONTROL: FLAGGER | $12.89 | $0.00 | $12.89 |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $18.22 | $2.69 | $20.91 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $19.09 | $1.81 | $20.90 |
| OPERATOR: SCREED | $22.13 | $4.89 | $27.02 |
| OPERATOR: ROLLER (FINISHING) | $19.05 | $1.29 | $20.34 |
| OPERATOR: ROLLER | $22.10 | $0.00 | $22.10 |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 | $25.91 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $21.05 | $0.00 | $21.05 |
| OPERATOR: MILLING MACHINE | $23.12 | $3.60 | $26.72 |
| OPERATOR: MECHANIC | $21.43 | $0.00 | $21.43 |
| OPERATOR: LOADER | $17.17 | $0.00 | $17.17 |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 | $16.64 |
| OPERATOR: GRADER/BLADE | $23.21 | $0.00 | $23.21 |
| OPERATOR: GRADALL | $19.26 | $0.00 | $19.26 |
| OPERATOR: DRILL | $24.66 | $0.00 | $24.66 |
| OPERATOR: CRANE | $24.42 | $4.69 | $29.11 |
| OPERATOR: BROOM/SWEEPER | $17.40 | $2.01 | $19.41 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.16 | $4.45 | $23.61 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.14 | $0.00 | $18.14 |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 | $15.69 |
| LABORER: PIPELAYER | $17.76 | $0.00 | $17.76 |
| LABORER: GRADE CHECKER | $14.88 | $0.00 | $14.88 |
| LABORER: COMMON OR GENERAL | $15.51 | $0.00 | $15.51 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.71 | $3.56 | $23.27 |
| IRONWORKER, STRUCTURAL | $27.38 | $0.00 | $27.38 |
| IRONWORKER, REINFORCING | $20.80 | $0.00 | $20.80 |
| CEMENT MASON/CONCRETE FINISHER | $16.03 | $2.47 | $18.50 |
| CARPENTER, INCLUDES FORM WORK | $19.22 | $0.00 | $19.22 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.