Chesterfield County, Virginia: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Bidding a job in Chesterfield County? Pin your bid date to lock the revision that legally applies under the FAR ten-day rule, and get an email if anything moves before or after opening.
Building VA20260017 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 | $60.94 |
| BOILERMAKER | $38.97 | $27.39 | $66.36 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $37.95 | $18.02 | $55.97 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY. B. VACATIONS: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $51.39 | $38.44 | $89.83 |
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | $39.99 | $18.05 | $58.04 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 | $59.04 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $31.00 | $18.28 | $49.28 |
| PLUMBER | $33.25 | $19.47 | $52.72 |
| PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS) | $33.25 | $19.47 | $52.72 |
| WATERPROOFER | $21.17 | $3.41 | $24.58 |
| TRUCK DRIVER: DUMP TRUCK | $14.88 | $0.00 | $14.88 |
| TILE SETTER | $27.80 | $10.25 | $38.05 |
| TILE FINISHER | $23.40 | $0.00 | $23.40 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $20.50 | $2.93 | $23.43 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $19.72 | $1.83 | $21.55 |
| ROOFER | $17.40 | $1.55 | $18.95 |
| PAINTER: SPRAY | $16.58 | $0.00 | $16.58 |
| PAINTER (BRUSH AND ROLLER) | $16.87 | $0.00 | $16.87 |
| LABORER: PIPELAYER | $12.28 | $1.96 | $14.24 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.96 | $3.12 | $16.08 |
| LABORER: MASON TENDER - BRICK | $13.41 | $3.15 | $16.56 |
| LABORER: COMMON OR GENERAL | $11.85 | $1.75 | $13.60 |
| IRONWORKER, REINFORCING | $27.18 | $4.13 | $31.31 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | $20.60 | $2.93 | $23.53 |
| GLAZIER | $18.43 | $3.71 | $22.14 |
| CEMENT MASON/CONCRETE FINISHER | $17.23 | $0.00 | $17.23 |
| CARPENTER | $21.10 | $1.11 | $22.21 |
| BRICKLAYER | $20.00 | $1.00 | $21.00 |
OPERATOR 6 classifications · $17.50 to $26.40 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $16.25 | $4.88 | $21.13 |
| OPERATOR: LOADER | $21.28 | $3.17 | $24.45 |
| OPERATOR: FORKLIFT | $19.40 | $7.00 | $26.40 |
| OPERATOR: BULLDOZER | $17.50 | $0.00 | $17.50 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 | $22.98 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.74 | $1.43 | $21.17 |
Heavy VA20260206 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $38.97 | $27.39 | $66.36 |
| ELECTRICIAN | $36.85 | $14.13 | $50.98 |
| POWER EQUIPMENT OPERATOR: CRANE | $39.99 | $18.05 | $58.04 |
| IRONWORKER | $31.00 | $18.28 | $49.28 |
| TRUCK DRIVER: DUMP TRUCK | $12.50 | $0.00 | $12.50 |
| OPERATOR: LOADER | $16.93 | $6.87 | $23.80 |
| OPERATOR: BULLDOZER | $25.18 | $15.15 | $40.33 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.37 | $3.83 | $25.20 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.79 | $0.00 | $20.79 |
| LABORER: PIPELAYER | $15.96 | $4.68 | $20.64 |
| LABORER: COMMON OR GENERAL | $14.61 | $0.00 | $14.61 |
| CEMENT MASON/CONCRETE FINISHER | $20.29 | $4.41 | $24.70 |
| CARPENTER | $22.74 | $7.82 | $30.56 |
Highway VA20260111 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 | $50.98 |
| TRUCK DRIVER: SINGLE & MULTI AXLE | $19.23 | $0.00 | $19.23 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $16.98 | $0.00 | $16.98 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 | $18.25 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.53 | $0.00 | $15.53 |
| TRAFFIC CONTROL: FLAGGER | $12.89 | $0.00 | $12.89 |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 | $15.69 |
| LABORER: PIPELAYER | $17.76 | $0.00 | $17.76 |
| LABORER: GRADE CHECKER | $14.88 | $0.00 | $14.88 |
| LABORER: COMMON OR GENERAL | $15.51 | $0.00 | $15.51 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.71 | $3.56 | $23.27 |
| IRONWORKER, STRUCTURAL | $27.38 | $0.00 | $27.38 |
| IRONWORKER, REINFORCING | $20.80 | $0.00 | $20.80 |
| CEMENT MASON/CONCRETE FINISHER | $16.03 | $2.47 | $18.50 |
| CARPENTER, INCLUDES FORM WORK | $19.22 | $0.00 | $19.22 |
OPERATOR 18 classifications · $16.64 to $29.11 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $18.22 | $2.69 | $20.91 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $19.09 | $1.81 | $20.90 |
| OPERATOR: SCREED | $22.13 | $4.89 | $27.02 |
| OPERATOR: ROLLER (FINISHING) | $19.05 | $1.29 | $20.34 |
| OPERATOR: ROLLER | $22.10 | $0.00 | $22.10 |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 | $25.91 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $21.05 | $0.00 | $21.05 |
| OPERATOR: MILLING MACHINE | $23.12 | $3.60 | $26.72 |
| OPERATOR: MECHANIC | $21.43 | $0.00 | $21.43 |
| OPERATOR: LOADER | $17.17 | $0.00 | $17.17 |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 | $16.64 |
| OPERATOR: GRADER/BLADE | $23.21 | $0.00 | $23.21 |
| OPERATOR: GRADALL | $19.26 | $0.00 | $19.26 |
| OPERATOR: DRILL | $24.66 | $0.00 | $24.66 |
| OPERATOR: CRANE | $24.42 | $4.69 | $29.11 |
| OPERATOR: BROOM/SWEEPER | $17.40 | $2.01 | $19.41 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.16 | $4.45 | $23.61 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.14 | $0.00 | $18.14 |
Residential VA20260147 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $22.44 | $10.23 | $32.67 |
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | $39.99 | $18.05 | $58.04 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 | $59.04 |
| TRUCK DRIVER: DUMP TRUCK | $16.30 | $0.00 | $16.30 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $15.77 | $0.00 | $15.77 |
| ROOFER | $13.15 | $0.00 | $13.15 |
| PLUMBER | $16.92 | $0.76 | $17.68 |
| PAINTER (BRUSH AND ROLLER) | $12.67 | $0.00 | $12.67 |
| OPERATOR: LOADER | $15.21 | $2.77 | $17.98 |
| OPERATOR: BULLDOZER | $14.91 | $2.27 | $17.18 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $15.26 | $0.80 | $16.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.58 | $1.98 | $20.56 |
| LABORER: PIPELAYER | $14.70 | $1.71 | $16.41 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.84 | $0.00 | $12.84 |
| LABORER: MASON TENDER - BRICK | $13.56 | $0.00 | $13.56 |
| LABORER: COMMON OR GENERAL | $10.76 | $0.00 | $10.76 |
| IRONWORKER, STRUCTURAL | $21.55 | $1.39 | $22.94 |
| IRONWORKER, ORNAMENTAL | $15.59 | $0.00 | $15.59 |
| ELECTRICIAN | $16.18 | $0.00 | $16.18 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $15.32 | $0.00 | $15.32 |
| CEMENT MASON/CONCRETE FINISHER | $15.05 | $0.00 | $15.05 |
| CARPENTER | $21.44 | $3.44 | $24.88 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.