Building construction wages: Grayson, Texas
Wage determination TX20260249 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/TX20260249 on · latest revision 1 · verify at sam.gov/wage-determination/TX20260249/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $33.23 | $7.52 | $40.75 |
| BOILERMAKER | $33.17 | $24.92 | $58.09 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | $32.35 | $13.10 | $45.45 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | $32.85 | $13.10 | $45.95 |
| IRONWORKER: ORNAMENTAL | $29.64 | $8.43 | $38.07 |
| PLUMBER (HVAC PIPE INSTALLATION ONLY) | $39.76 | $14.04 | $53.80 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $39.76 | $14.04 | $53.80 |
| TRUCK DRIVER: WATER TRUCK | $12.00 | $4.11 | $16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 | $0.00 | $12.50 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 | $28.22 |
| TRUCK DRIVER: DUMP TRUCK | $12.39 | $1.18 | $13.57 |
| TILE SETTER | $14.25 | $0.00 | $14.25 |
| TILE FINISHER | $11.22 | $0.00 | $11.22 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $21.31 | $4.66 | $25.97 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $21.04 | $5.28 | $26.32 |
| ROOFER | $16.53 | $0.00 | $16.53 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $22.27 | $4.81 | $27.08 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $13.46 | $2.49 | $15.95 |
| OPERATOR: ROLLER | $15.04 | $0.00 | $15.04 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $18.44 | $0.00 | $18.44 |
| OPERATOR: MECHANIC | $17.52 | $3.33 | $20.85 |
| OPERATOR: LOADER | $13.39 | $0.90 | $14.29 |
| OPERATOR: GRADER/BLADE | $12.95 | $0.00 | $12.95 |
| OPERATOR: FORKLIFT | $13.63 | $0.00 | $13.63 |
| OPERATOR: DRILL | $17.60 | $0.50 | $18.10 |
| OPERATOR: BULLDOZER | $18.29 | $1.31 | $19.60 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 | $13.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $12.89 | $0.00 | $12.89 |
| LABORER: ROOF TEAROFF | $11.28 | $0.00 | $11.28 |
| LABORER: PIPELAYER | $13.00 | $0.35 | $13.35 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.76 | $0.00 | $10.76 |
| LABORER: MASON TENDER - BRICK | $10.95 | $0.00 | $10.95 |
| LABORER: COMMON OR GENERAL | $10.00 | $0.00 | $10.00 |
| IRONWORKER, STRUCTURAL | $16.83 | $4.58 | $21.41 |
| IRONWORKER, REINFORCING | $12.33 | $0.00 | $12.33 |
| ELECTRICIAN | $20.59 | $3.36 | $23.95 |
| CEMENT MASON/CONCRETE FINISHER | $13.27 | $0.00 | $13.27 |
| CARPENTER | $15.81 | $0.00 | $15.81 |
| BRICKLAYER | $19.95 | $0.00 | $19.95 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.