Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.17 | $18.82 | $56.99 |
| CARPENTER | $30.20 | $14.74 | $44.94 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $36.75 | $16.19 | $52.94 |
| IRONWORKER: ORNAMENTAL | $35.32 | $17.07 | $52.39 |
| IRONWORKER, STRUCTURAL | $35.32 | $17.07 | $52.39 |
| IRONWORKER, REINFORCING | $35.32 | $17.07 | $52.39 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $34.95 | $16.66 | $51.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $34.95 | $16.66 | $51.61 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $34.95 | $16.66 | $51.61 |
| TRUCK DRIVER: DUMP TRUCK | $15.28 | $0.00 | $15.28 |
| TILE SETTER | $19.65 | $0.00 | $19.65 |
| TILE FINISHER | $14.00 | $0.00 | $14.00 |
| ROOFER | $16.29 | $0.00 | $16.29 |
| PLUMBER | $26.86 | $10.40 | $37.26 |
| PIPEFITTER | $29.54 | $12.41 | $41.95 |
| PAINTER (BRUSH AND ROLLER) | $17.00 | $0.00 | $17.00 |
| OPERATOR: ROLLER | $14.35 | $0.00 | $14.35 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $14.70 | $0.00 | $14.70 |
| OPERATOR: FORKLIFT | $15.00 | $0.00 | $15.00 |
| OPERATOR: DRILL | $26.50 | $4.09 | $30.59 |
| OPERATOR: CRANE | $25.70 | $7.75 | $33.45 |
| OPERATOR: BULLDOZER | $28.19 | $9.65 | $37.84 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.84 | $0.00 | $16.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.06 | $0.00 | $23.06 |
| LABORER: PIPELAYER | $14.99 | $2.41 | $17.40 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.33 | $0.00 | $15.33 |
| LABORER: MASON TENDER - BRICK | $13.54 | $0.00 | $13.54 |
| LABORER: COMMON OR GENERAL | $13.97 | $1.30 | $15.27 |
| LABORER GRADE CHECKER | $13.01 | $0.00 | $13.01 |
| LABORER DEMOLITION | $16.74 | $0.00 | $16.74 |
| GLAZIER | $16.99 | $3.70 | $20.69 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $25.31 | $9.18 | $34.49 |
| CEMENT MASON/CONCRETE FINISHER | $20.25 | $0.00 | $20.25 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |