Fayette County, Tennessee: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building TN20260200 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.17 | $18.82 | $56.99 |
| CARPENTER | $30.20 | $14.74 | $44.94 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $36.75 | $16.19 | $52.94 |
| IRONWORKER: ORNAMENTAL | $35.32 | $17.07 | $52.39 |
| IRONWORKER, STRUCTURAL | $35.32 | $17.07 | $52.39 |
| IRONWORKER, REINFORCING | $35.32 | $17.07 | $52.39 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $34.95 | $16.66 | $51.61 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $34.95 | $16.66 | $51.61 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $34.95 | $16.66 | $51.61 |
| TRUCK DRIVER: DUMP TRUCK | $15.28 | $0.00 | $15.28 |
| TILE SETTER | $19.65 | $0.00 | $19.65 |
| TILE FINISHER | $14.00 | $0.00 | $14.00 |
| ROOFER | $16.29 | $0.00 | $16.29 |
| PLUMBER | $26.86 | $10.40 | $37.26 |
| PIPEFITTER | $29.54 | $12.41 | $41.95 |
| PAINTER (BRUSH AND ROLLER) | $17.00 | $0.00 | $17.00 |
| LABORER: PIPELAYER | $14.99 | $2.41 | $17.40 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.33 | $0.00 | $15.33 |
| LABORER: MASON TENDER - BRICK | $13.54 | $0.00 | $13.54 |
| LABORER: COMMON OR GENERAL | $13.97 | $1.30 | $15.27 |
| LABORER GRADE CHECKER | $13.01 | $0.00 | $13.01 |
| LABORER DEMOLITION | $16.74 | $0.00 | $16.74 |
| GLAZIER | $16.99 | $3.70 | $20.69 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | $25.31 | $9.18 | $34.49 |
| CEMENT MASON/CONCRETE FINISHER | $20.25 | $0.00 | $20.25 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 |
OPERATOR 8 classifications · $14.35 to $37.84 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $14.35 | $0.00 | $14.35 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $14.70 | $0.00 | $14.70 |
| OPERATOR: FORKLIFT | $15.00 | $0.00 | $15.00 |
| OPERATOR: DRILL | $26.50 | $4.09 | $30.59 |
| OPERATOR: CRANE | $25.70 | $7.75 | $33.45 |
| OPERATOR: BULLDOZER | $28.19 | $9.65 | $37.84 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.84 | $0.00 | $16.84 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.06 | $0.00 | $23.06 |
Heavy TN20260127 rev 2
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $36.75 | $16.19 | $52.94 |
| OPERATING ENGINEERS: (BULLDOZER, CRANE, AND FORKLIFT) | $33.15 | $13.62 | $46.77 |
| LABORER: COMMON OR GENERAL | $18.47 | $6.65 | $25.12 |
| TRUCK DRIVER: DUMP TRUCK | $10.76 | $0.00 | $10.76 |
| OPERATOR: LOADER | $13.50 | $0.00 | $13.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.82 | $0.00 | $16.82 |
| LABORER: PIPELAYER | $11.68 | $0.00 | $11.68 |
| LABORER: FLAGGER | $8.73 | $0.00 | $8.73 |
Highway TN20260147 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER (5 OR MORE AXLES) | $16.27 | $0.00 | $16.27 |
| TRUCK DRIVER (3-4 AXLES) | $14.86 | $0.00 | $14.86 |
| TRUCK DRIVER (2 AXLES) | $15.36 | $0.00 | $15.36 |
| PAINTER (INCLUDES SANDBLASTER) | $26.36 | $0.00 | $26.36 |
| LABORER, SKILLED (AIR TOOL OPERATOR, ASPHALT RAKER, CHAIN SAW OPERATOR, CONCRETE MIXER (LESS THAN 1 YD), CONCRETE RUBBER, EDGER, FENCE ERECTOR, FORM SETTER (STEEL), GUARD RAIL ERECTOR, MECHANIC'S TENDER (TIRE CHANGER OR OILER), MORTAR MIXER, NOZZLEMAN OR GUN OPERATOR (GUNITE), PIPELAYER, SIGN ERECTOR) | $15.27 | $0.00 | $15.27 |
| LABORER (COMMON/UNSKILLED) | $13.11 | $0.00 | $13.11 |
| IRONWORKER (STRUCTURAL) | $16.89 | $0.00 | $16.89 |
| IRONWORKER (REINFORCING) | $16.29 | $0.00 | $16.29 |
| ELECTRICIAN | $24.08 | $0.00 | $24.08 |
| CEMENT MASON/CONCRETE FINISHER | $15.55 | $0.00 | $15.55 |
| CARPENTER | $17.52 | $0.00 | $17.52 |
| BRICKLAYER | $14.26 | $0.00 | $14.26 |
POWER EQUIPMENT OPERATOR 11 classifications · $13.50 to $25.26 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 4 SWEEPING MACHINE (VACUUM) OPERATOR | $15.56 | $0.00 | $15.56 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT, CENTRAL MINING PLANT, CONCRETE PUMP, CONCRETE SAW, CURB MACHINE (AUTOMATIC OR MANUAL), DOZER OR LOADER (STOCKPILE), DRILL (PILING), MULCHER OR SEEDER, ROCK DRILL (TRUCK MOUNTED), ROLLER (ASPHALT), ROLLER (COMPACTION SELF-PROPELLED), SOIL STABILIZATION MACHINE, TRACTOR (BOOM AND HOIST), BITUMINOUS DISTRIBUTOR MACHINE, PUMP, TRACK DRILL, STRIPING MACHINE | $16.48 | $0.00 | $16.48 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LIGHT DUTY MECHANIC | $19.53 | $0.00 | $19.53 |
| POWER EQUIPMENT OPERATOR: GROUP 4 HEAVY DUTY MECHANIC | $20.33 | $0.00 | $20.33 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT PAVER, CONCRETE FINISHING MACHINE, CONCRETE PAVER, SCALE, SPREADER (SELF-PROPELLED), CONCRETE GRINDER, ASPHALT MILLING MACHINE, BORING MACHINE (HORIZONTAL) | $17.75 | $0.00 | $17.75 |
| POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE/HYDRAULIC EXCAVATOR (LESS THAN 3/4 YD), BULLDOZER OR PUSH DOZER, END LOADER (LESS THAN 3 YD), MOTOR PATROL (ROUGH), TRACTOR (CRAWLER/ UTILITY), TRUCK DRIVER (HEAVY DUTY, OFF ROAD) SCRAPER, SHOVEL, OR TRENCHING MACHINE | $17.08 | $0.00 | $17.08 |
| POWER EQUIPMENT OPERATOR: GROUP 1A FARM TRACTOR OPERATOR (POWER BROOM) | $13.50 | $0.00 | $13.50 |
| POWER EQUIPMENT OPERATOR: GROUP 1A DRILL OPERATOR (CAISSON) | $25.26 | $0.00 | $25.26 |
| POWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE/HYDRAULIC EXCAVATOR (3/4 YD & OVER), CRANE (LESS THAN 20 TONS), END LOADER (3 YD & OVER), MOTOR PATROL (FINISH),PILEDRIVER, DRAGLINE | $19.14 | $0.00 | $19.14 |
| POWER EQUIPMENT OPERATOR: BOBCAT, CENTRAL MINING PLANT, CONCRETE PUMP, CONCRETE SAW, CURB MACHINE (AUTOMATIC OR MANUAL), DOZER OR LOADER (STOCKPILE), DRILL (PILING), MULCHER OR SEEDER, ROCK DRILL (TRUCK MOUNTED), ROLLER (ASPHALT), ROLLER (COMPACTION SELF-PROPELLED), SOIL STABILIZATION MACHINE, TRACTOR (BOOM AND HOIST), BITUMINOUS DISTRIBUTOR MACHINE, PUMP, TRACK DRILL, STRIPING MACHINE (GROUP 4) | $16.48 | $0.00 | $16.48 |
| POWER EQUIPMENT OPERATOR: GROUP 5 CRANE (OVER 20 TONS) | $20.44 | $0.00 | $20.44 |
Residential TN20260027 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| SHEETMETAL WORKER (HVAC DUCT INSTALLATION ONLY) | $29.64 | $15.57 | $45.21 |
| ROOFER, INCLUDES SHAKE & SHINGLE ROOFS | $10.25 | $0.00 | $10.25 |
| PLUMBER | $17.50 | $0.00 | $17.50 |
| OPERATOR: BACKHOE | $13.17 | $0.00 | $13.17 |
| LABORER: LANDSCAPE | $12.33 | $0.30 | $12.63 |
| LABORER: COMMON OR GENERAL | $12.00 | $0.00 | $12.00 |
| ELECTRICIAN | $18.55 | $5.93 | $24.48 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 | $16.00 |
| CARPENTER | $17.00 | $0.00 | $17.00 |
| BRICKLAYER | $12.72 | $0.00 | $12.72 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.