Highway construction wages: Berkeley + 3 more counties, South Carolina
Wage determination SC20260034 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/SC20260034 on · latest revision 1 · verify at sam.gov/wage-determination/SC20260034/1
BerkeleyCharlestonDorchesterHorry
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK | $15.55 | $0.00 | $15.55 |
| TRUCK DRIVER: DUMP TRUCK | $10.67 | $0.00 | $10.67 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $13.28 | $0.00 | $13.28 |
| POWER EQUIPMENT OPERATOR: SCREED | $13.56 | $0.00 | $13.56 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $12.71 | $0.00 | $12.71 |
| POWER EQUIPMENT OPERATOR: PAVER (HORRY) | $13.29 | $0.00 | $13.29 |
| POWER EQUIPMENT OPERATOR: PAVER (BERKELEY, CHARLESTON, DORCHESTER) | $18.85 | $0.00 | $18.85 |
| POWER EQUIPMENT OPERATOR: MECHANIC (HORRY) | $19.48 | $0.00 | $19.48 |
| POWER EQUIPMENT OPERATOR: MECHANIC (CHARLESTON) | $19.21 | $0.00 | $19.21 |
| POWER EQUIPMENT OPERATOR: MECHANIC (BERKELEY, DORCHESTER) | $19.07 | $0.00 | $19.07 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $14.61 | $0.00 | $14.61 |
| POWER EQUIPMENT OPERATOR: CRANE (HORRY) | $20.58 | $0.00 | $20.58 |
| POWER EQUIPMENT OPERATOR: CRANE (CHARLESTON) | $20.08 | $0.00 | $20.08 |
| POWER EQUIPMENT OPERATOR: CRANE (BERKELEY, DORCHESTER) | $20.00 | $4.73 | $24.73 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.81 | $0.00 | $14.81 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (HORRY) | $15.04 | $0.00 | $15.04 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (DORCHESTER) | $16.06 | $0.00 | $16.06 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CHARLESTON) | $16.09 | $0.00 | $16.09 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (BERKELEY) | $15.68 | $0.00 | $15.68 |
| POWER EQUIPMENT OPERATOR: (ROLLER) | $15.17 | $0.00 | $15.17 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $11.84 | $0.00 | $11.84 |
| POWER EQUIPMENT OPERATOR: (LOADER (FRONT END/TRACK)) | $16.80 | $0.00 | $16.80 |
| POWER EQUIPMENT OPERATOR: (HYDROSEEDER) | $11.00 | $0.00 | $11.00 |
| LABORER: PIPELAYER | $13.98 | $0.00 | $13.98 |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $10.40 | $0.00 | $10.40 |
| LABORER, TRAFFIC CONTROL-CONE SETTER (HORRY) | $12.63 | $0.00 | $12.63 |
| LABORER, TRAFFIC CONTROL-CONE SETTER (BERKELEY, CHARLESTON, DORECHESTER) | $13.19 | $0.00 | $13.19 |
| LABORER, COMMON OR GENERAL (HORRY) | $9.72 | $0.00 | $9.72 |
| LABORER, COMMON OR GENERAL (DORCHESTER) | $11.69 | $0.00 | $11.69 |
| LABORER, COMMON OR GENERAL (CHARLESTON) | $10.16 | $0.00 | $10.16 |
| LABORER, COMMON OR GENERAL (BERKELEY) | $10.06 | $0.00 | $10.06 |
| LABORER, ASPHALT, INCLUDES ASPHALT DISTRIBUTOR, SHOVELER AND SPREADER (HORRY) | $11.54 | $0.00 | $11.54 |
| LABORER, ASPHALT, INCLUDES ASPHALT DISTRIBUTOR, RAKER, SHOVELER, AND SPREADER (BERKELEY, CHARLESTON, DORCHESTER) | $11.62 | $0.00 | $11.62 |
| LABORER (TRAFFIC CONTROL-FLAGGER) | $11.07 | $0.00 | $11.07 |
| LABORER (LUTEMAN) | $11.61 | $0.00 | $11.61 |
| IRONWORKER, REINFORCING | $15.35 | $0.00 | $15.35 |
| CEMENT MASON/CONCRETE FINISHER (HORRY) | $14.62 | $0.00 | $14.62 |
| CEMENT MASON/CONCRETE FINISHER (CHARLESTON) | $14.33 | $0.00 | $14.33 |
| CEMENT MASON/CONCRETE FINISHER (BERKELEY, DORCHESTER) | $14.79 | $0.00 | $14.79 |
| CARPENTER, FORM WORK ONLY (HORRY) | $14.29 | $0.00 | $14.29 |
| CARPENTER, FORM WORK ONLY (CHARLESTON) | $13.07 | $0.00 | $13.07 |
| CARPENTER, FORM WORK ONLY (BERKELEY, DORCHESTER) | $13.50 | $0.00 | $13.50 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.