Residential construction wages: Erie, New York
Wage determination NY20260082 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NY20260082 on · latest revision 1 · verify at sam.gov/wage-determination/NY20260082/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (EXCLUDES BATT INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, AND DRYWALL FINISHING/TAPING) | $34.73 | $28.61 | $63.34 |
| ELEVATOR MECHANIC | $62.39 | $38.44 | $100.83 |
| IRONWORKER, STRUCTURAL | $35.75 | $30.80 | $66.55 |
| IRONWORKER, ORNAMENTAL A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY | $42.63 | $53.70 | $96.33 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.38 | $23.65 | $50.03 |
| PAINTER ((BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING) | $25.50 | $20.59 | $46.09 |
| PLUMBER | $27.44 | $23.40 | $50.84 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $20.49 | $0.00 | $20.49 |
| ROOFER | $18.11 | $0.00 | $18.11 |
| PIPEFITTER (HVAC UNIT INSTALLATION ONLY) | $18.96 | $2.77 | $21.73 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $14.14 | $3.76 | $17.90 |
| OPERATOR: LOADER | $27.88 | $21.40 | $49.28 |
| OPERATOR: BULLDOZER | $21.20 | $0.00 | $21.20 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $51.04 | $5.78 | $56.82 |
| LABORER: MASON TENDER - BRICK | $18.79 | $0.00 | $18.79 |
| LABORER: LANDSCAPE | $13.65 | $1.09 | $14.74 |
| LABORER: COMMON OR GENERAL | $14.18 | $0.00 | $14.18 |
| IRONWORKER, REINFORCING | $27.06 | $23.02 | $50.08 |
| INSULATOR - BATT | $10.92 | $0.00 | $10.92 |
| ELECTRICIAN | $20.64 | $4.70 | $25.34 |
| CEMENT MASON/CONCRETE FINISHER | $21.07 | $2.15 | $23.22 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $15.36 | $4.64 | $20.00 |
| CARPENTER (DRYWALL FINISHING/TAPING ONLY) | $18.74 | $4.64 | $23.38 |
| BRICKLAYER | $29.57 | $0.00 | $29.57 |