Highway construction wages: Strafford, New Hampshire
Wage determination NH20260041 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NH20260041 on July 24, 2026 · latest revision 1 · verify at sam.gov/wage-determination/NH20260041/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK | $22.75 | $4.95 | $27.70 |
| TRUCK DRIVER: DUMP TRUCK | $21.41 | $4.05 | $25.46 |
| TRAFFIC CONTROL: FLAGGER | $12.05 | $1.37 | $13.42 |
| PAINTER: SPRAY | $27.29 | $6.95 | $34.24 |
| OPERATOR: ROLLER | $24.43 | $4.32 | $28.75 |
| OPERATOR: POUNDER | $36.21 | $9.46 | $45.67 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.93 | $5.10 | $33.03 |
| OPERATOR: MILLING MACHINE | $28.55 | $6.88 | $35.43 |
| OPERATOR: MECHANIC | $24.33 | $8.36 | $32.69 |
| OPERATOR: LOADER | $25.93 | $5.55 | $31.48 |
| OPERATOR: GRADER/BLADE | $27.56 | $6.56 | $34.12 |
| OPERATOR: CRANE | $29.76 | $3.29 | $33.05 |
| OPERATOR: BULLDOZER | $25.97 | $6.59 | $32.56 |
| OPERATOR: BUCKET | $30.00 | $0.00 | $30.00 |
| OPERATOR: BROOM/SWEEPER | $25.08 | $4.60 | $29.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.01 | $9.93 | $34.94 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.43 | $5.27 | $31.70 |
| OPERATOR: AUGER | $26.07 | $0.00 | $26.07 |
| LABORER: PIPELAYER | $19.64 | $4.83 | $24.47 |
| LABORER: LANDSCAPE | $18.21 | $0.00 | $18.21 |
| LABORER: COMMON OR GENERAL | $18.79 | $2.60 | $21.39 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $20.38 | $5.47 | $25.85 |
| IRONWORKER, STRUCTURAL | $34.45 | $17.20 | $51.65 |
| IRONWORKER, REINFORCING | $22.21 | $8.19 | $30.40 |
| INSTALLER - GUARDRAIL | $29.70 | $8.11 | $37.81 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $20.87 | $0.00 | $20.87 |
| FENCE ERECTOR (CHAIN LINK FENCE) | $19.59 | $0.00 | $19.59 |
| ELECTRICIAN | $29.00 | $2.78 | $31.78 |
| CEMENT MASON/CONCRETE FINISHER | $21.78 | $0.00 | $21.78 |
| CARPENTER, EXCLUDES FORM WORK | $26.23 | $2.51 | $28.74 |
| CARPENTER (FORM WORK ONLY) | $24.04 | $2.60 | $26.64 |