Strafford County, New Hampshire: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building NH20260023 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 | $80.99 |
| BOILERMAKER | $42.83 | $25.29 | $68.12 |
| BRICKLAYER | $43.91 | $28.47 | $72.38 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION) | $36.12 | $22.92 | $59.04 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $74.17 | $38.44 | $112.61 |
| IRONWORKER, REINFORCING | $33.65 | $26.12 | $59.77 |
| PIPEFITTER | $45.76 | $26.19 | $71.95 |
| WATERPROOFER | $26.69 | $0.00 | $26.69 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $31.29 | $9.78 | $41.07 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $24.88 | $5.46 | $30.34 |
| ROOFER | $19.55 | $0.00 | $19.55 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $24.60 | $9.40 | $34.00 |
| PAINTER: SPRAY | $22.99 | $3.28 | $26.27 |
| PAINTER (BRUSH AND ROLLER) | $17.13 | $0.00 | $17.13 |
| OPERATOR: ROLLER | $23.56 | $3.28 | $26.84 |
| OPERATOR: LOADER | $22.25 | $2.13 | $24.38 |
| OPERATOR: CRANE | $27.42 | $3.83 | $31.25 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.02 | $4.25 | $28.27 |
| LABORER: MASON TENDER - BRICK | $16.52 | $4.74 | $21.26 |
| LABORER: COMMON OR GENERAL | $17.92 | $12.72 | $30.64 |
| IRONWORKER, STRUCTURAL | $24.16 | $12.42 | $36.58 |
| GLAZIER | $26.75 | $3.48 | $30.23 |
| DRYWALL FINISHER/TAPER | $24.80 | $0.00 | $24.80 |
| CEMENT MASON/CONCRETE FINISHER | $22.04 | $9.70 | $31.74 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $26.14 | $12.05 | $38.19 |
Heavy NH20260026 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (REINFORCING AND STRUCTURAL) | $33.65 | $26.12 | $59.77 |
| PIPEFITTER | $45.76 | $26.19 | $71.95 |
| TRUCK DRIVER: DUMP TRUCK | $19.02 | $5.73 | $24.75 |
| TRAFFIC CONTROL: FLAGGER | $17.24 | $1.54 | $18.78 |
| PAINTER (BRUSH AND ROLLER) | $33.55 | $19.15 | $52.70 |
| LABORER: PIPELAYER | $24.54 | $9.84 | $34.38 |
| LABORER: COMMON OR GENERAL | $17.36 | $2.19 | $19.55 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.70 | $1.54 | $25.24 |
| ELECTRICIAN | $25.70 | $11.47 | $37.17 |
| CEMENT MASON/CONCRETE FINISHER | $27.46 | $13.30 | $40.76 |
| CARPENTER, INCLUDES FORM WORK | $26.83 | $6.94 | $33.77 |
OPERATOR 7 classifications · $25.79 to $40.54 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $24.09 | $4.43 | $28.52 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.10 | $5.69 | $32.79 |
| OPERATOR: LOADER | $26.37 | $12.98 | $39.35 |
| OPERATOR: DRILL | $27.15 | $13.39 | $40.54 |
| OPERATOR: CRANE | $28.37 | $9.74 | $38.11 |
| OPERATOR: BULLDOZER | $21.70 | $4.09 | $25.79 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $25.55 | $5.74 | $31.29 |
Highway NH20260041 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY TRUCK | $22.75 | $4.95 | $27.70 |
| TRUCK DRIVER: DUMP TRUCK | $21.41 | $4.05 | $25.46 |
| TRAFFIC CONTROL: FLAGGER | $12.05 | $1.37 | $13.42 |
| PAINTER: SPRAY | $27.29 | $6.95 | $34.24 |
| LABORER: PIPELAYER | $19.64 | $4.83 | $24.47 |
| LABORER: LANDSCAPE | $18.21 | $0.00 | $18.21 |
| LABORER: COMMON OR GENERAL | $18.79 | $2.60 | $21.39 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $20.38 | $5.47 | $25.85 |
| IRONWORKER, STRUCTURAL | $34.45 | $17.20 | $51.65 |
| IRONWORKER, REINFORCING | $22.21 | $8.19 | $30.40 |
| INSTALLER - GUARDRAIL | $29.70 | $8.11 | $37.81 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $20.87 | $0.00 | $20.87 |
| FENCE ERECTOR (CHAIN LINK FENCE) | $19.59 | $0.00 | $19.59 |
| ELECTRICIAN | $29.00 | $2.78 | $31.78 |
| CEMENT MASON/CONCRETE FINISHER | $21.78 | $0.00 | $21.78 |
| CARPENTER, EXCLUDES FORM WORK | $26.23 | $2.51 | $28.74 |
| CARPENTER (FORM WORK ONLY) | $24.04 | $2.60 | $26.64 |
OPERATOR 14 classifications · $26.07 to $45.67 total
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: ROLLER | $24.43 | $4.32 | $28.75 |
| OPERATOR: POUNDER | $36.21 | $9.46 | $45.67 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.93 | $5.10 | $33.03 |
| OPERATOR: MILLING MACHINE | $28.55 | $6.88 | $35.43 |
| OPERATOR: MECHANIC | $24.33 | $8.36 | $32.69 |
| OPERATOR: LOADER | $25.93 | $5.55 | $31.48 |
| OPERATOR: GRADER/BLADE | $27.56 | $6.56 | $34.12 |
| OPERATOR: CRANE | $29.76 | $3.29 | $33.05 |
| OPERATOR: BULLDOZER | $25.97 | $6.59 | $32.56 |
| OPERATOR: BUCKET | $30.00 | $0.00 | $30.00 |
| OPERATOR: BROOM/SWEEPER | $25.08 | $4.60 | $29.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.01 | $9.93 | $34.94 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.43 | $5.27 | $31.70 |
| OPERATOR: AUGER | $26.07 | $0.00 | $26.07 |
Residential NH20260002 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $11.72 | $0.00 | $11.72 |
| POWER EQUIPMENT OPERATORS: BACKHOE | $11.47 | $0.00 | $11.47 |
| PLUMBER (INCLUDES HVAC PIPING) | $11.70 | $0.00 | $11.70 |
| PAINTER (DOES NOT INCLUDE DRYWALL FINISHING) | $9.28 | $0.00 | $9.28 |
| LABORER, GENERAL | $8.85 | $0.00 | $8.85 |
| ELECTRICIAN | $10.89 | $0.00 | $10.89 |
| DRYWALL FINISHER | $13.57 | $0.00 | $13.57 |
| CARPENTER (INCLUDES DRYWALL HANGING) | $11.11 | $0.00 | $11.11 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.