Heavy construction wages: Boyd + 14 more counties, Nebraska
Wage determination NE20260046 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NE20260046 on · latest revision 1 · verify at sam.gov/wage-determination/NE20260046/1
BoydBrownHoltKeya PahaKnoxPlatteRockBurtCedarColfaxCumingMadisonPierceStantonWayne
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BURT, COLFAX, CUMING, MADISON, PLATTE AND STANTON COUNTIES) | $46.40 | $20.89 | $67.29 |
| ELECTRICIAN (CEDAR, KNOX, PIERCE AND WAYNE COUNTIES) | $40.68 | $19.70 | $60.38 |
| ELECTRICIAN ZONE 4: 76 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 | $54.99 |
| ELECTRICIAN ZONE 3: 51 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 | $54.54 |
| ELECTRICIAN ZONE 2: 36 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 | $54.21 |
| ELECTRICIAN ZONE 1: 0 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.00 | $18.88 | $53.88 |
| OPERATOR: SCRAPER | $14.89 | $2.06 | $16.95 |
| OPERATOR: LOADER | $16.79 | $1.09 | $17.88 |
| OPERATOR: BULLDOZER | $15.95 | $3.04 | $18.99 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.47 | $4.07 | $23.54 |
| OPERATOR: BACKHOE/EXCAVATOR | $18.23 | $2.31 | $20.54 |
| LABORER: PIPELAYER | $14.23 | $0.39 | $14.62 |
| LABORER: COMMON OR GENERAL | $11.69 | $1.31 | $13.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.75 | $3.25 | $22.00 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.