Building construction wages: Anson, North Carolina
Wage determination NC20260021 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/NC20260021 on · latest revision 1 · verify at sam.gov/wage-determination/NC20260021/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN ON SMOKESTACKS WHERE ELECTRICAL WORK PERFORMED IS ABOVE 40 FT. FROM THE GROUND: $0.50 PER HOUR ADDITIONAL. WORK FROM SWINGING SCAFFOLDS, BOSUN CHAIRS, OR RAW STRUCTURAL STEEL: $0.50 PER HOUR ADDITIONAL | $32.31 | $13.66 | $45.97 |
| IRONWORKER, STRUCTURAL | $29.75 | $18.00 | $47.75 |
| PLUMBER/PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION) | $31.66 | $12.69 | $44.35 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $15.52 | $0.00 | $15.52 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $15.96 | $1.01 | $16.97 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $17.32 | $1.56 | $18.88 |
| ROOFER | $12.50 | $0.81 | $13.31 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.13 | $2.88 | $17.01 |
| OPERATOR: LOADER | $16.17 | $0.25 | $16.42 |
| OPERATOR: GRADER/BLADE | $15.72 | $1.49 | $17.21 |
| OPERATOR: FORKLIFT | $13.86 | $0.00 | $13.86 |
| OPERATOR: CRANE | $19.77 | $4.48 | $24.25 |
| OPERATOR: BULLDOZER | $16.00 | $1.87 | $17.87 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.00 | $2.48 | $18.48 |
| LABORER: MASON TENDER-BRICK/CEMENT/CONCRETE | $12.00 | $0.00 | $12.00 |
| LABORER: PIPELAYER | $13.35 | $2.80 | $16.15 |
| LABORER: LANDSCAPE & IRRIGATION | $9.13 | $0.28 | $9.41 |
| LABORER: COMMON OR GENERAL | $11.88 | $2.15 | $14.03 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $17.36 | $2.23 | $19.59 |
| FORM WORKER | $14.09 | $0.00 | $14.09 |
| DRYWALL HANGER | $13.83 | $0.00 | $13.83 |
| CEMENT MASON/CONCRETE FINISHER | $16.41 | $0.00 | $16.41 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $15.57 | $0.00 | $15.57 |
| BRICKLAYER | $19.76 | $9.18 | $28.94 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.