Highway construction wages: Shawnee, Kansas
Wage determination KS20260148 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260148 on · latest revision 1 · verify at sam.gov/wage-determination/KS20260148/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $23.82 | $9.89 | $33.71 |
| TRUCK DRIVER: DUMP AND TANDEM | $23.23 | $11.51 | $34.74 |
| TRUCK DRIVER: WATER TRUCK | $22.45 | $11.51 | $33.96 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $16.54 | $0.00 | $16.54 |
| TRAFFIC CONTROL: SERVICE DRIVER | $15.76 | $0.00 | $15.76 |
| OPERATOR: STRIPING MACHINE | $27.27 | $12.25 | $39.52 |
| OPERATOR: ROTO MILL GROUNDMAN | $18.43 | $0.00 | $18.43 |
| OPERATOR: ROTO MILL | $21.05 | $0.00 | $21.05 |
| OPERATOR: TRACTOR | $16.96 | $0.00 | $16.96 |
| OPERATOR: SCREED | $16.93 | $0.00 | $16.93 |
| OPERATOR: SCRAPER | $17.67 | $0.00 | $17.67 |
| OPERATOR: ROLLER | $16.09 | $0.00 | $16.09 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.84 | $15.53 | $43.37 |
| OPERATOR: MECHANIC | $25.45 | $9.49 | $34.94 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $14.65 | $0.00 | $14.65 |
| OPERATOR: LOADER | $18.87 | $4.26 | $23.13 |
| OPERATOR: GRADER/BLADE | $25.14 | $9.03 | $34.17 |
| OPERATOR: CRANE | $21.18 | $6.96 | $28.14 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 |
| OPERATOR: BULLDOZER | $19.35 | $5.41 | $24.76 |
| OPERATOR: BROOM/SWEEPER | $19.17 | $0.00 | $19.17 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.75 | $11.31 | $33.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.78 | $11.94 | $38.72 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 |
| LABORER: FLAGGER | $13.20 | $0.00 | $13.20 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $29.21 | $14.63 | $43.84 |
| LABORER: COMMON OR GENERAL | $17.30 | $8.37 | $25.67 |
| IRONWORKER, REINFORCING | $30.50 | $27.05 | $57.55 |
| ELECTRICIAN | $29.93 | $14.14 | $44.07 |
| CEMENT MASON/CONCRETE FINISHER | $27.45 | $10.10 | $37.55 |
| CARPENTER, INCLUDES FORM WORK | $17.12 | $4.74 | $21.86 |
| LABORER: PIPELAYER | $32.12 | $14.73 | $46.85 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.