Shawnee County, Kansas: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building KS20260058 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $43.57 | $23.02 | $66.59 |
| TILE FINISHER | $20.74 | $1.46 | $22.20 |
| TILE SETTER | $30.18 | $13.52 | $43.70 |
| ELECTRICIAN | $44.05 | $20.25 | $64.30 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | $22.42 | $67.90 |
| IRONWORKER: ORNAMENTAL/REINFORCING | $39.00 | $34.25 | $73.25 |
| LABORER: MASON TENDER - BRICK | $25.47 | $11.38 | $36.85 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $36.18 | $19.97 | $56.15 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.90 | $19.94 | $65.84 |
| PLUMBER | $45.90 | $19.94 | $65.84 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $55.56 | $25.80 | $81.36 |
| ROOFER | $38.45 | $22.29 | $60.74 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $52.18 | $27.15 | $79.33 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $52.18 | $27.15 | $79.33 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $25.50 | $10.38 | $35.88 |
| OPERATOR: ROLLER | $33.78 | $13.64 | $47.42 |
| OPERATOR: LOADER | $30.35 | $12.04 | $42.39 |
| OPERATOR: GRADER/BLADE | $31.05 | $13.26 | $44.31 |
| OPERATOR: FORKLIFT | $34.83 | $14.16 | $48.99 |
| OPERATOR: CRANE | $33.19 | $14.16 | $47.35 |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.69 | $7.01 | $33.70 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.86 | $1.01 | $18.87 |
| LABORER: COMMON OR GENERAL | $19.31 | $9.42 | $28.73 |
| IRONWORKER, STRUCTURAL | $29.00 | $25.35 | $54.35 |
| CEMENT MASON/CONCRETE FINISHER | $21.01 | $3.31 | $24.32 |
| CARPENTER | $22.94 | $7.04 | $29.98 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $23.95 | $11.59 | $35.54 |
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 |
Heavy KS20260160 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.64 | $18.29 | $58.93 |
| LINE CONSTRUCTION: LINEMAN | $53.68 | $26.44 | $80.12 |
| POWER EQUIPMENT OPERATOR: LOADER | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.09 | $16.83 | $52.92 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.09 | $16.83 | $52.92 |
| IRONWORKER | $39.00 | $34.25 | $73.25 |
| LABORER: PIPELAYER | $36.24 | $15.87 | $52.11 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 | $57.77 |
| TRUCK DRIVER: DUMP TRUCK | $28.60 | $19.49 | $48.09 |
| OPERATOR: CRANE | $32.13 | $9.58 | $41.71 |
| OPERATOR: BULLDOZER | $22.34 | $14.08 | $36.42 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.00 | $12.73 | $41.73 |
| LABORER: COMMON OR GENERAL | $18.41 | $2.45 | $20.86 |
| CARPENTER | $28.89 | $8.87 | $37.76 |
| OPERATOR: ROLLER | $30.32 | $15.54 | $45.86 |
Highway KS20260148 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $23.82 | $9.89 | $33.71 |
| TRUCK DRIVER: DUMP AND TANDEM | $23.23 | $11.51 | $34.74 |
| TRUCK DRIVER: WATER TRUCK | $22.45 | $11.51 | $33.96 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $16.54 | $0.00 | $16.54 |
| TRAFFIC CONTROL: SERVICE DRIVER | $15.76 | $0.00 | $15.76 |
| OPERATOR: STRIPING MACHINE | $27.27 | $12.25 | $39.52 |
| OPERATOR: ROTO MILL GROUNDMAN | $18.43 | $0.00 | $18.43 |
| OPERATOR: ROTO MILL | $21.05 | $0.00 | $21.05 |
| OPERATOR: TRACTOR | $16.96 | $0.00 | $16.96 |
| OPERATOR: SCREED | $16.93 | $0.00 | $16.93 |
| OPERATOR: SCRAPER | $17.67 | $0.00 | $17.67 |
| OPERATOR: ROLLER | $16.09 | $0.00 | $16.09 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.84 | $15.53 | $43.37 |
| OPERATOR: MECHANIC | $25.45 | $9.49 | $34.94 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $14.65 | $0.00 | $14.65 |
| OPERATOR: LOADER | $18.87 | $4.26 | $23.13 |
| OPERATOR: GRADER/BLADE | $25.14 | $9.03 | $34.17 |
| OPERATOR: CRANE | $21.18 | $6.96 | $28.14 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 |
| OPERATOR: BULLDOZER | $19.35 | $5.41 | $24.76 |
| OPERATOR: BROOM/SWEEPER | $19.17 | $0.00 | $19.17 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.75 | $11.31 | $33.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.78 | $11.94 | $38.72 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 |
| LABORER: FLAGGER | $13.20 | $0.00 | $13.20 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $29.21 | $14.63 | $43.84 |
| LABORER: COMMON OR GENERAL | $17.30 | $8.37 | $25.67 |
| IRONWORKER, REINFORCING | $30.50 | $27.05 | $57.55 |
| ELECTRICIAN | $29.93 | $14.14 | $44.07 |
| CEMENT MASON/CONCRETE FINISHER | $27.45 | $10.10 | $37.55 |
| CARPENTER, INCLUDES FORM WORK | $17.12 | $4.74 | $21.86 |
| LABORER: PIPELAYER | $32.12 | $14.73 | $46.85 |
Residential KS20260010 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $11.32 | $1.20 | $12.52 |
| TILE SETTER | $15.00 | $0.00 | $15.00 |
| SPRINKLER FITTER | $16.47 | $3.23 | $19.70 |
| SHEET METAL WORKER | $14.68 | $3.54 | $18.22 |
| ROOFER | $14.66 | $1.29 | $15.95 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER OPERATORS | $11.55 | $3.77 | $15.32 |
| POWER EQUIPMENT OPERATORS: FORKLIFT OPERATORS | $13.35 | $3.77 | $17.12 |
| POWER EQUIPMENT OPERATORS: CRANE OPERATORS | $13.75 | $3.77 | $17.52 |
| POWER EQUIPMENT OPERATORS: BACKHOE OPERATORS | $11.80 | $3.77 | $15.57 |
| PLUMBER/PIPEFITTER | $15.83 | $2.34 | $18.17 |
| PLASTERER | $15.70 | $0.01 | $15.71 |
| PAINTER | $10.50 | $1.25 | $11.75 |
| LABORERS: MASON TENDERS | $9.60 | $2.30 | $11.90 |
| LABORERS: LABORERS, GENERAL | $9.30 | $2.30 | $11.60 |
| GLAZIER | $12.83 | $5.54 | $18.37 |
| FLOOR LAYER: CARPET | $11.00 | $2.86 | $13.86 |
| ELECTRICIAN | $11.55 | $1.70 | $13.25 |
| CEMENT MASON/FINISHER | $12.60 | $1.05 | $13.65 |
| CARPENTERS: MILLWRIGHTS | $13.45 | $1.80 | $15.25 |
| CARPENTERS: CARPENTERS | $8.72 | $1.80 | $10.52 |
| BRICKLAYER, STONEMASON | $14.14 | $1.25 | $15.39 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.