Highway construction wages: Johnson, Kansas
Wage determination KS20260140 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260140 on · latest revision 1 · verify at sam.gov/wage-determination/KS20260140/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $43.28 | $21.25 | $64.53 |
| POWER EQUIPMENT OPERATOR: ROTO MILL | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: ROLLER | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: LOADER | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.17 | $22.29 | $62.46 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $39.00 | $34.25 | $73.25 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $37.45 | $15.87 | $53.32 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $37.45 | $15.87 | $53.32 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 | $57.77 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $28.41 | $14.05 | $42.46 |
| TRUCK DRIVER: DUMP AND TANDEM | $29.04 | $12.45 | $41.49 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $17.10 | $0.00 | $17.10 |
| TRAFFIC CONTROL: SERVICE DRIVER | $20.00 | $12.49 | $32.49 |
| OPERATOR: STRIPING MACHINE | $27.27 | $12.25 | $39.52 |
| OPERATOR: ROTO MILL GROUNDMAN | $18.43 | $0.00 | $18.43 |
| OPERATOR: TRACTOR | $24.28 | $0.00 | $24.28 |
| OPERATOR: SCREED | $17.38 | $3.52 | $20.90 |
| OPERATOR: SCRAPER | $17.67 | $0.00 | $17.67 |
| OPERATOR: MECHANIC | $32.25 | $15.31 | $47.56 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $14.65 | $0.00 | $14.65 |
| OPERATOR: GRADER/BLADE | $29.66 | $12.55 | $42.21 |
| OPERATOR: CRANE | $30.38 | $11.08 | $41.46 |
| OPERATOR: CONCRETE SAW | $33.87 | $15.16 | $49.03 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 |
| OPERATOR: BULLDOZER | $28.15 | $11.65 | $39.80 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $34.88 | $15.40 | $50.28 |
| LINE CONSTRUCTION: LINEMAN | $41.52 | $17.26 | $58.78 |
| LINE CONSTRUCTION: GROUNDMAN | $24.92 | $12.15 | $37.07 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $30.67 | $14.36 | $45.03 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 |
| LABORER: FORM WORK ONLY | $30.21 | $14.57 | $44.78 |
| LABORER: FLAGGER | $13.20 | $0.00 | $13.20 |
| LABORER: COMMON OR GENERAL | $27.81 | $14.30 | $42.11 |
| ELECTRICIAN | $29.93 | $14.14 | $44.07 |
| TRUCK DRIVER: WATER TRUCK | $38.04 | $15.85 | $53.89 |
| LABORER: PIPELAYER | $32.12 | $14.73 | $46.85 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.