Building construction wages: Leavenworth, Kansas
Wage determination KS20260053 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260053 on · latest revision 1 · verify at sam.gov/wage-determination/KS20260053/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 | $81.07 |
| TILE SETTER | $42.73 | $18.39 | $61.12 |
| BRICKLAYER | $43.57 | $23.02 | $66.59 |
| TILE FINISHER | $20.74 | $1.46 | $22.20 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $43.28 | $21.25 | $64.53 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FLOOR LAYING CARPET) | $44.63 | $22.40 | $67.03 |
| CARPENTER (FLOOR LAYING-CARPET ONLY) | $40.94 | $21.25 | $62.19 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $51.01 | $26.25 | $77.26 |
| ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $44.14 | $22.42 | $66.56 |
| POWER EQUIPMENT OPERATOR: CRANE | $47.29 | $22.42 | $69.71 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 |
| LABORERS: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $31.99 | $16.03 | $48.02 |
| LABORER: MASON TENDER - BRICK | $31.25 | $18.25 | $49.50 |
| GLAZIER | $39.32 | $22.34 | $61.66 |
| PAINTER (SPRAY) | $36.18 | $19.97 | $56.15 |
| PAINTER: DRYWALL FINISHING/TAPING | $36.18 | $19.97 | $56.15 |
| PLASTERER | $37.92 | $18.83 | $56.75 |
| PLUMBER | $54.28 | $23.79 | $78.07 |
| PIPEFITTER (INCLUDING HVAC PIPE, UNIT, AND INSTALLATION OF HVAC ELECTRICIAL/TEMPERATURE CONTROLS) | $55.56 | $25.80 | $81.36 |
| ROOFER | $38.45 | $22.29 | $60.74 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $40.74 | $22.15 | $62.89 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $52.18 | $27.15 | $79.33 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $28.58 | $11.22 | $39.80 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $38.39 | $17.73 | $56.12 |
| PAINTER (BRUSH AND ROLLER) | $23.69 | $9.39 | $33.08 |
| OPERATOR: ROLLER | $32.18 | $13.49 | $45.67 |
| OPERATOR: LOADER | $30.35 | $12.04 | $42.39 |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $33.53 | $13.66 | $47.19 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $33.85 | $13.87 | $47.72 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.86 | $1.01 | $18.87 |
| LABORER: LANDSCAPE | $12.48 | $0.00 | $12.48 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $28.44 | $11.60 | $40.04 |
| LABORER: COMMON OR GENERAL | $25.49 | $12.95 | $38.44 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $32.91 | $18.15 | $51.06 |
| CEMENT MASON/CONCRETE FINISHER | $25.93 | $11.62 | $37.55 |
| CARPENTER (DRYWALL HANGING ONLY) | $30.00 | $1.62 | $31.62 |
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.