Leavenworth County, Kansas: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building KS20260053 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 | $81.07 |
| TILE SETTER | $42.73 | $18.39 | $61.12 |
| BRICKLAYER | $43.57 | $23.02 | $66.59 |
| TILE FINISHER | $20.74 | $1.46 | $22.20 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $43.28 | $21.25 | $64.53 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FLOOR LAYING CARPET) | $44.63 | $22.40 | $67.03 |
| CARPENTER (FLOOR LAYING-CARPET ONLY) | $40.94 | $21.25 | $62.19 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $51.01 | $26.25 | $77.26 |
| ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $44.14 | $22.42 | $66.56 |
| POWER EQUIPMENT OPERATOR: CRANE | $47.29 | $22.42 | $69.71 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $39.00 | $34.25 | $73.25 |
| LABORERS: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $31.99 | $16.03 | $48.02 |
| LABORER: MASON TENDER - BRICK | $31.25 | $18.25 | $49.50 |
| GLAZIER | $39.32 | $22.34 | $61.66 |
| PAINTER (SPRAY) | $36.18 | $19.97 | $56.15 |
| PAINTER: DRYWALL FINISHING/TAPING | $36.18 | $19.97 | $56.15 |
| PLASTERER | $37.92 | $18.83 | $56.75 |
| PLUMBER | $54.28 | $23.79 | $78.07 |
| PIPEFITTER (INCLUDING HVAC PIPE, UNIT, AND INSTALLATION OF HVAC ELECTRICIAL/TEMPERATURE CONTROLS) | $55.56 | $25.80 | $81.36 |
| ROOFER | $38.45 | $22.29 | $60.74 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $40.74 | $22.15 | $62.89 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $52.18 | $27.15 | $79.33 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $28.58 | $11.22 | $39.80 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $38.39 | $17.73 | $56.12 |
| PAINTER (BRUSH AND ROLLER) | $23.69 | $9.39 | $33.08 |
| OPERATOR: ROLLER | $32.18 | $13.49 | $45.67 |
| OPERATOR: LOADER | $30.35 | $12.04 | $42.39 |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $33.53 | $13.66 | $47.19 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $33.85 | $13.87 | $47.72 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $17.86 | $1.01 | $18.87 |
| LABORER: LANDSCAPE | $12.48 | $0.00 | $12.48 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $28.44 | $11.60 | $40.04 |
| LABORER: COMMON OR GENERAL | $25.49 | $12.95 | $38.44 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $32.91 | $18.15 | $51.06 |
| CEMENT MASON/CONCRETE FINISHER | $25.93 | $11.62 | $37.55 |
| CARPENTER (DRYWALL HANGING ONLY) | $30.00 | $1.62 | $31.62 |
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 |
Heavy KS20260154 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER | $43.28 | $21.25 | $64.53 |
| ELECTRICIAN | $40.64 | $18.29 | $58.93 |
| LINE CONSTRUCTION: LINEMAN | $53.68 | $26.44 | $80.12 |
| POWER EQUIPMENT OPERATOR: ROLLER | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: LOADER | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.17 | $22.29 | $62.46 |
| IRONWORKER | $39.00 | $34.25 | $73.25 |
| LABORER: PIPELAYER | $36.24 | $15.87 | $52.11 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 | $57.77 |
| TRUCK DRIVER: DUMP TRUCK | $32.95 | $19.49 | $52.44 |
| OPERATOR: CRANE | $34.41 | $11.22 | $45.63 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $36.11 | $17.51 | $53.62 |
| LABORER: COMMON OR GENERAL | $29.16 | $16.33 | $45.49 |
| CARPENTER, EXCLUDES FORM WORK | $27.39 | $7.74 | $35.13 |
Highway KS20260141 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (EXCLUDES FORM WORK) | $43.28 | $21.25 | $64.53 |
| POWER EQUIPMENT OPERATOR: ROTO MILL | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $40.17 | $22.29 | $62.46 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $39.00 | $34.25 | $73.25 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $37.45 | $15.87 | $53.32 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $37.45 | $15.87 | $53.32 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $27.96 | $14.05 | $42.01 |
| TRUCK DRIVER: DUMP AND TANDEM | $29.04 | $12.45 | $41.49 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $17.10 | $0.00 | $17.10 |
| TRAFFIC CONTROL: SERVICE DRIVER | $14.15 | $2.44 | $16.59 |
| OPERATOR: STRIPING MACHINE | $27.27 | $12.25 | $39.52 |
| OPERATOR: ROTO MILL GROUNDMAN | $18.43 | $0.00 | $18.43 |
| OPERATOR: TRACTOR | $24.28 | $0.00 | $24.28 |
| OPERATOR: SCREED | $17.38 | $3.52 | $20.90 |
| OPERATOR: SCRAPER | $17.67 | $0.00 | $17.67 |
| OPERATOR: ROLLER | $29.00 | $11.40 | $40.40 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.88 | $15.53 | $48.41 |
| OPERATOR: MECHANIC | $32.25 | $15.31 | $47.56 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $14.65 | $0.00 | $14.65 |
| OPERATOR: LOADER | $33.88 | $15.07 | $48.95 |
| OPERATOR: GRADER/BLADE | $29.66 | $12.55 | $42.21 |
| OPERATOR: CRANE | $30.38 | $11.08 | $41.46 |
| OPERATOR: CONCRETE SAW | $33.87 | $15.16 | $49.03 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 |
| OPERATOR: BULLDOZER | $28.15 | $11.65 | $39.80 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $34.58 | $15.13 | $49.71 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $35.23 | $15.53 | $50.76 |
| LINE CONSTRUCTION: LINEMAN | $41.52 | $17.56 | $59.08 |
| LINE CONSTRUCTION: GROUNDMAN | $26.76 | $12.71 | $39.47 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $32.15 | $15.06 | $47.21 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 |
| LABORER: FLAGGER | $13.20 | $0.00 | $13.20 |
| LABORER: COMMON OR GENERAL | $27.97 | $13.76 | $41.73 |
| ELECTRICIAN | $29.93 | $14.14 | $44.07 |
| CEMENT MASON/CONCRETE FINISHER | $30.06 | $14.85 | $44.91 |
| CARPENTER (FORM WORK ONLY) | $30.23 | $12.71 | $42.94 |
| TRUCK DRIVER: WATER TRUCK | $38.04 | $15.85 | $53.89 |
| LABORER: PIPELAYER | $32.12 | $14.73 | $46.85 |
Residential KS20260008 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | $7.52 | $0.00 | $7.52 |
| TILE SETTER | $13.05 | $0.00 | $13.05 |
| SHEET METAL WORKER | $8.55 | $0.00 | $8.55 |
| ROOFER | $10.85 | $0.00 | $10.85 |
| POWER EQUIPMENT OPERATORS: LOADER | $14.95 | $3.87 | $18.82 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $12.89 | $3.25 | $16.14 |
| PLUMBER/PIPEFITTER | $11.89 | $1.06 | $12.95 |
| PAINTER | $8.55 | $0.00 | $8.55 |
| LABORER: MASON TENDER | $8.50 | $0.00 | $8.50 |
| LABORER | $7.52 | $0.00 | $7.52 |
| INSULATOR (BATT) | $11.85 | $0.00 | $11.85 |
| ELECTRICIAN | $10.62 | $0.00 | $10.62 |
| CEMENT MASON/CONCRETE FINISHER | $12.00 | $0.00 | $12.00 |
| CARPENTER (EXCLUDING BATT INSULATION) | $9.96 | $0.00 | $9.96 |
| BRICKLAYER | $14.00 | $0.00 | $14.00 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.