Residential construction wages: Butler, Harvey, Sedgwick, Kansas
Wage determination KS20260002 · Active · Standard · verify on SAM.gov
Retrieved from wagepin.com/wd/KS20260002 on · latest revision 1 · verify at sam.gov/wage-determination/KS20260002/1
Revision history
| Revision | Published | Compare |
|---|---|---|
| rev 1 | 2026-05-18 | diff vs rev 0 |
| rev 0 | 2026-05-17 | original |
Current rates (rev 1)
The CSV and the printed sheet are snapshots of rev 1. If DOL revises this determination after you save one, the watch above tells you exactly what moved.
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $38.05 | $17.80 | $55.85 |
| TRUCK DRIVERS: TANDEM/3 AXLE | $8.00 | $0.00 | $8.00 |
| TRUCK DRIVERS: 2-3 AXLE | $8.86 | $1.43 | $10.29 |
| TRUCK DRIVERS: 1-2 AXLE | $8.53 | $0.00 | $8.53 |
| ROOFER | $8.61 | $0.00 | $8.61 |
| POWER EQUIPMENT OPERATORS: SCREED/CONCRETE | $9.63 | $0.00 | $9.63 |
| POWER EQUIPMENT OPERATORS: SCRAPERS | $9.63 | $1.29 | $10.92 |
| POWER EQUIPMENT OPERATORS: ROLLERS, ALL TYPES | $8.65 | $0.00 | $8.65 |
| POWER EQUIPMENT OPERATORS: GRADER, MULTI-PURPOSE | $11.71 | $0.00 | $11.71 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADERS | $9.91 | $0.00 | $9.91 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $10.88 | $1.54 | $12.42 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $10.24 | $0.00 | $10.24 |
| PLUMBER (EXCLUDING HVAC) | $13.73 | $0.73 | $14.46 |
| PAINTER (INCLUDING DRYWALL) | $12.64 | $0.00 | $12.64 |
| LABORERS: UNSKILLED (INCLUDING INSULATION) | $8.17 | $0.00 | $8.17 |
| LABORERS: CARPENTER TENDER | $8.14 | $0.00 | $8.14 |
| HVAC MECHANIC | $10.39 | $0.00 | $10.39 |
| CEMENT MASON/CONCRETE FINISHER | $11.26 | $0.00 | $11.26 |
| CARPENTER (INCLUDING DRYWALL AND INSULATION) | $12.42 | $0.00 | $12.42 |
Spot a rate that looks wrong? Email me the details and I’ll check it against the SAM.gov document.