Butler County, Kansas: Davis-Bacon prevailing wages
Rates from the current active wage determination for each construction type. Click through for revision history and change diffs.
Building KS20260046 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 | $81.07 |
| TILE FINISHER | $20.74 | $1.46 | $22.20 |
| TILE SETTER | $30.18 | $13.52 | $43.70 |
| ELECTRICIAN (INCLUDING ALARM INSTALLATION) | $40.64 | $18.29 | $58.93 |
| ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 |
| POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: OILER | $39.93 | $22.42 | $62.35 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $45.48 | $22.42 | $67.90 |
| IRONWORKER: ORNAMENTAL/REINFORCING | $39.00 | $34.25 | $73.25 |
| IRONWORKER, STRUCTURAL | $27.49 | $13.63 | $41.12 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $36.18 | $19.97 | $56.15 |
| PLUMBER | $45.90 | $19.94 | $65.84 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.90 | $19.94 | $65.84 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $55.56 | $25.80 | $81.36 |
| SPRINKLER FITTER: FIRE SPRINKLER | $41.83 | $27.60 | $69.43 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $19.63 | $5.26 | $24.89 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $22.44 | $4.70 | $27.14 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $24.68 | $6.91 | $31.59 |
| ROOFER | $13.46 | $1.51 | $14.97 |
| OPERATOR: ROLLER | $33.78 | $13.64 | $47.42 |
| OPERATOR: LOADER | $30.35 | $12.04 | $42.39 |
| OPERATOR: GRADER/BLADE | $29.58 | $11.51 | $41.09 |
| OPERATOR: FORKLIFT | $34.83 | $14.16 | $48.99 |
| OPERATOR: CRANE | $33.19 | $14.16 | $47.35 |
| OPERATOR: BULLDOZER | $33.12 | $13.96 | $47.08 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.50 | $3.49 | $23.99 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.99 | $1.67 | $14.66 |
| LABORER: MASON TENDER - BRICK | $19.91 | $6.88 | $26.79 |
| LABORER: COMMON OR GENERAL | $13.00 | $1.36 | $14.36 |
| CEMENT MASON/CONCRETE FINISHER | $17.17 | $2.23 | $19.40 |
| CARPENTER | $17.62 | $1.93 | $19.55 |
| BRICKLAYER, EXCLUDES TILE FINISHER AND TILE SETTER | $21.85 | $3.04 | $24.89 |
| TRUCK DRIVER: LOWBOY TRUCK | $39.89 | $15.85 | $55.74 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $39.89 | $15.85 | $55.74 |
Heavy KS20260162 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.64 | $18.29 | $58.93 |
| LINE CONSTRUCTION: LINEMAN | $53.68 | $26.44 | $80.12 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.57 | $21.69 | $61.26 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.09 | $16.83 | $52.92 |
| IRONWORKER | $39.00 | $34.25 | $73.25 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 | $57.77 |
| TRUCK DRIVER: DUMP TRUCK | $24.95 | $9.62 | $34.57 |
| OPERATOR: ROLLER | $31.50 | $16.88 | $48.38 |
| OPERATOR: LOADER | $21.09 | $4.03 | $25.12 |
| OPERATOR: CRANE | $29.82 | $6.41 | $36.23 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.79 | $6.84 | $30.63 |
| LABORER: PIPELAYER | $16.03 | $2.88 | $18.91 |
| LABORER: COMMON OR GENERAL | $16.26 | $3.61 | $19.87 |
| CARPENTER, EXCLUDES FORM WORK | $24.15 | $6.18 | $30.33 |
| CARPENTER (FORM WORK ONLY) | $19.56 | $3.12 | $22.68 |
Highway KS20260132 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.64 | $18.29 | $58.93 |
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 |
| TRUCK DRIVER: OFF ROAD TRUCK | $19.06 | $0.00 | $19.06 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $23.23 | $9.89 | $33.12 |
| TRUCK DRIVER: DUMP AND TANDEM | $16.35 | $0.00 | $16.35 |
| TRUCK DRIVER: WATER TRUCK | $21.94 | $11.51 | $33.45 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $16.40 | $0.00 | $16.40 |
| TRAFFIC CONTROL: SERVICE DRIVER | $13.96 | $0.00 | $13.96 |
| OPERATOR: STRIPING MACHINE | $27.02 | $12.14 | $39.16 |
| OPERATOR: ROTO MILL GROUNDMAN | $16.36 | $0.00 | $16.36 |
| OPERATOR: ROTO MILL | $17.86 | $0.00 | $17.86 |
| OPERATOR: TRACTOR | $14.77 | $0.00 | $14.77 |
| OPERATOR: SCREED | $14.87 | $2.64 | $17.51 |
| OPERATOR: SCRAPER | $17.88 | $0.00 | $17.88 |
| OPERATOR: ROLLER | $14.54 | $2.45 | $16.99 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.30 | $2.52 | $18.82 |
| OPERATOR: MECHANIC | $19.24 | $0.00 | $19.24 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $17.24 | $0.00 | $17.24 |
| OPERATOR: LOADER | $17.37 | $0.00 | $17.37 |
| OPERATOR: GRADER/BLADE | $18.30 | $0.00 | $18.30 |
| OPERATOR: DISTRIBUTOR | $15.33 | $0.00 | $15.33 |
| OPERATOR: CRANE | $22.40 | $4.39 | $26.79 |
| OPERATOR: CONCRETE SAW | $17.80 | $0.00 | $17.80 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 |
| OPERATOR: BULLDOZER | $19.27 | $0.00 | $19.27 |
| OPERATOR: BROOM/SWEEPER | $14.56 | $0.00 | $14.56 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.28 | $0.00 | $16.28 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.17 | $0.00 | $19.17 |
| LABORER: PIPELAYER | $26.56 | $13.05 | $39.61 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 |
| LABORER: FLAGGER | $13.08 | $0.00 | $13.08 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $29.21 | $14.63 | $43.84 |
| LABORER: COMMON OR GENERAL | $14.29 | $0.00 | $14.29 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $13.03 | $0.00 | $13.03 |
| IRONWORKER, REINFORCING | $15.66 | $0.00 | $15.66 |
| FORM WORKER | $14.64 | $0.00 | $14.64 |
| CEMENT MASON/CONCRETE FINISHER | $15.31 | $0.00 | $15.31 |
| CARPENTER | $15.84 | $0.00 | $15.84 |
Residential KS20260002 rev 1
| Classification | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $38.05 | $17.80 | $55.85 |
| TRUCK DRIVERS: TANDEM/3 AXLE | $8.00 | $0.00 | $8.00 |
| TRUCK DRIVERS: 2-3 AXLE | $8.86 | $1.43 | $10.29 |
| TRUCK DRIVERS: 1-2 AXLE | $8.53 | $0.00 | $8.53 |
| ROOFER | $8.61 | $0.00 | $8.61 |
| POWER EQUIPMENT OPERATORS: SCREED/CONCRETE | $9.63 | $0.00 | $9.63 |
| POWER EQUIPMENT OPERATORS: SCRAPERS | $9.63 | $1.29 | $10.92 |
| POWER EQUIPMENT OPERATORS: ROLLERS, ALL TYPES | $8.65 | $0.00 | $8.65 |
| POWER EQUIPMENT OPERATORS: GRADER, MULTI-PURPOSE | $11.71 | $0.00 | $11.71 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADERS | $9.91 | $0.00 | $9.91 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $10.88 | $1.54 | $12.42 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | $10.24 | $0.00 | $10.24 |
| PLUMBER (EXCLUDING HVAC) | $13.73 | $0.73 | $14.46 |
| PAINTER (INCLUDING DRYWALL) | $12.64 | $0.00 | $12.64 |
| LABORERS: UNSKILLED (INCLUDING INSULATION) | $8.17 | $0.00 | $8.17 |
| LABORERS: CARPENTER TENDER | $8.14 | $0.00 | $8.14 |
| HVAC MECHANIC | $10.39 | $0.00 | $10.39 |
| CEMENT MASON/CONCRETE FINISHER | $11.26 | $0.00 | $11.26 |
| CARPENTER (INCLUDING DRYWALL AND INSULATION) | $12.42 | $0.00 | $12.42 |
Get an email when rates change here
One watch per determination above; every email includes a stop link. Bidding a specific job? Pin it to your bid date instead.